You are on page 1of 1

Power BI Desktop

Drilling & Completion


Daily Cementing Unit Monitoring Report

Date  WELLNAME  RIG_NAME Company


Thursday, March 21, 2024  All  All  All 

Company Primary Job Squeeze Job Misc Maintenance Other


BJ 1 1 0 0 8
SCHL 2 0 0 1 8
Total 3 1 0 1 16

NPT-Cementing
Rig Unit Name Well Name Job Number Start Date End Date UE Duration UE Cumulative Description

Status Unit & Scoring


Unit Status @5:00 Status 2 Type Job Well-Rig Future R/U Cementing Scoring Status from Rig DWSR DAY DWSR Night

Pump truck #3 Prepare at Base Other Primary Petapahan 00173-APS-752 3/29/2024 7:15:50 PM 13 Status at 05:00 : 40% R/U Rig's equipment Kuat R; Viagi Reza Ardi P W
CMP-0091 Prepare at Base Other Primary Petani 00202-ACS-021 3/28/2024 2:09:36 AM 11 Ops 05:00: W/O Motor Shaker #2 from Heru Prapanca; Hero Santoso
ACS-19, Indra Eka Effendi
Pump truck #1 Prepare at Base Other Primary Petani 00202-ACS-021 3/28/2024 2:09:36 AM 11 Ops 05:00: W/O Motor Shaker #2 from Heru Prapanca; Hero Santoso
ACS-19, Indra Eka Effendi
CMP-0111 Prepare at Base Other Primary Petani 00201-BDSI-29 3/26/2024 5:59:00 AM 9 05:00 Pattern Drilling 12-1/4" HS To 3353' Bennie Qurniawan; Yugianto
MD Eko Prehantoro
CMP-0166 Prepare at Base Other Primary Kopar 00042-ABI-88 3/25/2024 5:30:00 PM 9 Ops 05:00 : 77% R/U Rig and equipments Ade Nugraha; Rohul Jeckson
at KOPA-042 Ramadhan
CPT-0045 Prepare at Base Other Primary Duri 11198-ACS-019 3/24/2024 3:30:00 AM 7 @05:00: R/U 95 % Doni Hendra Laode Muhlifain M.
Pump truck #2 Travel from loc to base Other Primary Pinang East 00001-PDSI-49.2 3/29/2024 5:30:00 AM 7 05:00 : N/U BOP Stack 13-5/8"-5M Hendri Yeva; Triana Ariya DP; Riki
Priyo S Chandra
Pump truck #8 Travel from loc to base Other Primary Pungut 00057-BDSI-28 3/26/2024 9:00:00 PM 7 @05:00: Stand up 3-1/2" EUE TBG 30 of 92 Adhitomo Sulistyo Jefri Nurlis
jts
CMP-0105 Prepare at Base Other Primary Minas 02118-BDSI-27 3/23/2024 2:18:00 AM 6 at 05:00: Drilling 12-1/4" HS at 3013' MD Teguh Yusva Juryanto T;
Marvino Ryan P
CMP-0114 Prepare at Base Other Primary Balam So 00591-PDSI-50.2 3/22/2024 2:00:00 PM 6 05:00: TOH & L/D 8-1/2" PDC + Directional Jupiter Midian IB Langga Agestya
BHA
CPT-0057 Prepare at Base Other Primary Kotabatak 00553-ACS-026 3/22/2024 11:00:00 PM 6 Status 05:00 : M/U 12-1/4" Sperry steerable I Gusti Putu Firman Romanang Ali Jaya
BHA Hadi
Pump truck #10 Standby at base - waiting for confirm call Other Squeeze Duri Base -AU-05 3/21/2024 9:37:09 AM 6 Status 05:00 = N/D BOP. Parai Tody Feynce Yacub
Morist Kase
CPT-0060 Prepare at Base Other Primary Pager 00064-PDSI-51.2 3/22/2024 9:30:00 AM 5 05:00: 98% R/U Rig at Pager-64 Ariyanto W Dofa Andrico
Pump truck #11 Confirm Call to Well Other Squeeze Duri Base -ACS-003 3/21/2024 9:37:09 AM 5 @05:00 CHC Yuseldi Purnawan Putranto
Pump truck #4 Confirm Call to Well Other Primary Duri Base -PDSI-42.3 3/21/2024 9:37:09 AM 5 at 05:00 hrs: N/U WHD (upper &middle) Andi Baskoro; MAR Ajeng Restu Fairuz;
Hakim Erwin Hardjadinata
Pump truck #9 Prepare at Base Other Primary Balam Se 00041-PDSI-52.2 3/22/2024 6:30:00 AM 5 @05:00: TOH Tricone+Slick BHA at depth Eko Nugroho; Faruq Hidayat.;
2400 ftMD Sumarjana Rudi Siburian.
CPT-0058 Standby at location Primary Primary Mutiara BKO-AIRLANGGA-55 3/21/2024 9:37:09 AM 2 05:00 : POOH 17.5" Directional BHA @ 70 Deny Pranata M Rakhman
ftMD Sopamena
Pump truck #6 Operating at Primary Primary Balam So 00593-BN-18 3/22/2024 4:30:00 PM 2 05:00: Rough cut 13-3/8" Csg Kusrizal Agung Prasojo;
Yudi Hariadi
CMP-0120 Operating at Squeeze Squeeze Mutiara BKO-BMS-05 3/21/2024 9:37:09 AM 0 Status @05:00 Hrs : TIH 3-1/2" OE Tubing. Moh. Mujiono Wiwindra
Pump truck #5 Operating at Primary Primary Duri 11202-ARJ-01 3/21/2024 10:03:00 AM 0 @05:00 hrs : TOH 13 1/2" BCB on Choky Nasution Hanifal Yunis
Directional BHA#4
Pump truck #7 Maintenance Other Primary Duri Base -Other 3/21/2024 9:37:09 AM 0

Legend : Note :
Green : Most likely to be reallocated Primary/Squeeze job :
Yellow : Not reccomended to be • Travel from base to well
reallocated • Operating at
Red : Can't reallocated • stand by at loc

Gantt Chart R/U Cementing Unit


Latest Future R/U Cementing update by Status, Unit, Company, Date, Rig-Well, Projected Location and Rig Name
Status Confirm Call to Well Maintenance Operating at Prepare at Base Standby at base - waiting for confirm call Standby at location Travel from loc to base

Mar 21 Mar 22 Mar 23 Mar 24 Mar 25 Mar 26 Mar 27 Mar 28 Mar 29


Collapse All

SCHL

Pump truck #6 Balam So 00593-BN-18

Pump truck #11 ACS-003

Pump truck #9 Balam Se 00041-PDSI-52.2

Pump truck #5 Duri 11202-ARJ-01

Pump truck #10 AU-05

Pump truck #7 Other

Pump truck #4 PDSI-42.3

Pump truck #1 Petani 00202-ACS-021

Pump truck #3 Petapahan 00

Pump truck #2 Pinang East 00001-PDSI-49

Pump truck #8 Pungut 00057-BDSI-28

BJ

CMP-0120 BMS-05

CPT-0058 AIRLANGGA-55

CMP-0114 Balam So 00591-PDSI-50.2

CPT-0045 Duri 11198-ACS-019

CPT-0057 Kotabatak 00553-ACS-026

CMP-0166 Kopar 00042-ABI-88

CMP-0105 Minas 02118-BDSI-27

CPT-0060 Pager 00064-PDSI-51.2

CMP-0111 Petani 00201-BDSI-29

CMP-0091 Petani 00202-ACS-021

Status Antrian
Company Rig Name Well Name RIG_COMMENT Status Antrian Future R/U Cementing Future Finished R/U Cementing Remark
(ASAP/WO Call)

BJ ARJ-07 Meno-03 RH1 WO Call
SCHL BMS-08 MINAS 6D-86E SO2 WO Call
SCHL BMS-18 PEMATANG NO1 WO Call
#123
SCHL GBT-09 Kota Batak -452 SO1 WO Call

Top Future Cementing Job


Rig Well Name (WV) Future R/U Cementing Sub Team Unit Locked

Airlangga-55 Balam So 00585 3/21/2024 9:47:00 AM DRL-2
ARJ-01 Duri 11202 3/21/2024 10:03:00 AM DRL-1 Pump truck #5
ACS-021 Petani 00202 3/21/2024 12:00:00 AM DRL-4 Pump truck #1
ACS-009 Duri 11190 3/22/2024 4:49:00 AM DRL-1
PDSI-52.2 Balam Se 00041 3/22/2024 6:30:00 AM DRL-3 Pump truck #9
PDSI-51.2 Pager 00064 3/22/2024 9:30:00 AM DRL-3
PDSI-50.2 Balam So 00591 3/22/2024 2:00:00 PM DRL-3
BN-18 Balam So 00593 3/22/2024 4:30:00 PM DRL-2 Pump truck #6
ACS-026 Kotabatak 00553 3/22/2024 11:00:00 PM DRL-1
BDSI-27 Minas 02118 3/23/2024 2:18:00 AM DRL-2
BN-16 Pematang 00133 3/23/2024 7:45:00 AM DRL-2
ARJ-02 Duri 11189 3/18/2024 8:30:00 PM DRL-1
ACS-019 Duri 11198 3/24/2024 3:30:00 AM DRL-1
ACS-020 Minas 02121 3/18/2024 2:30:00 PM DRL-2
APS-752 Petapahan 00173 3/18/2024 11:00:00 AM DRL-4 Pump truck #3
ABI-88 Kopar 00042 3/25/2024 5:30:00 PM DRL-3
BDSI-29 Petani 00201 3/26/2024 5:59:00 AM DRL-4
BDSI-28 Pungut 00057 3/26/2024 9:00:00 PM DRL-2 Pump truck #8
AIRLANGGA-99 Balam Se 00040 3/26/2024 9:31:00 PM DRL-4
ACS-024 Balam So 00590 3/15/2024 11:30:00 AM DRL-2
ACS-023 Pematang 00134 3/29/2024 12:00:00 AM DRL-1

Content Contact : D&C Performance & Well Control