AUDITOR: AUDITEE:
ROLAPACK & CO ISO 9001:2015 AUDIT OBSERVATION MR/F/11
REPORT Rev. : 00
Poured by
Clause No. Audit Observation
O+ NC OI
Verified the Risk assessment record for QMS CO- OEDINATOR ( MR ) process
as per MR/F/12 and verified the identified Risks, Risk value, Mitigation Plan, √
Opportunity etc., It is accepted
AUDITOR: AUDITEE:
ROLAPACK & CO MR/F/11
ISO 9001:2015 AUDIT OBSERVATION REPORT Rev. : 00
Date :17/08/18 Auditor :S.SAMPATH Dept./Procees : QA & CALIBRATION
Audit No. :01 Auditee : A. V. Raman
Poured by
Clause No. Audit Observation
O+ NC OI
Verified the process Plan (PP/91) for the Part No: 577450103, Part
Name: End Disk , Customer: EATON . Verified WI for Tube
Trimmer (WI/04), Rev: 00), Verified In process inspection
( QA/F/03), dt. 06/08/18, Part No: 577453800, Operation: Punching, √
Machine No: Press-II,. Punching size req: 24.08/24.59mm,
Actual: 24.30/24.33mm, Operator: S.Mamata, Qty:34320 nos.,
Rejection – 5 Nos due to mis punch.
7.1.5,
7.1.6 ,8.6 ,8.7 ,9.1,10
.2
Verified Final Inspection report dt.09/07/18, Invoice no. RC37,
Item : End Disk ,Customer ; EATON, QTY: 1,10,000 Nos, Rej: Nill
AUDITOR: AUDITEE:
ROLAPACK & CO MR/F/11
ISO 9001:2015 AUDIT OBSERVATION REPORT Rev. : 00
Date :17/08/18 Auditor :S.SAMPATH
Dept./Procees : Production
Audit No. :01 Auditee : Venkat raj
Poured by
Clause No. Audit Observation
O+ NC OI
Verified job card ( QA/F/04) No. 04, dt. 05/04/18 ,Item: End disk, Part No.
5774546000, , Size :- 260 x 500 mm , Batch Qty ; 4,19,775 Nos, Verified the √
product and process Identification system at shop floor and found accepted..
Verified Process Validation Record ( QA/F/06), DT. 20/0518,, Process : Spiral Tube
Process . Process done by E. Malliga. √
AUDITOR: AUDITEE:
MR/F/11
ISO 9001:2015 AUDIT OBSERVATION REPORT Rev. : 00
ROLAPACK & CO
Poured by
Clause No. Audit Observation
O+ NC OI
AUDITOR: AUDITEE:
ROLAPACK & CO MR/F/03
ISO 9001:2015 AUDIT OBSERVATION REPORT Rev. : 00
Date :17/08/18 Auditor : S.SAMPATH Dept./Procees :Training
Audit No. :01 Auditee : A.V. RAMAN
Poured by
Clause No. Audit Observation
O+ NC OI
Verified the Risk assessment record for Training Process ( MR/F/12) and
verified the identified Risks, Risk value, Mitigation Plan, Opportunity etc.,It √
is accepted
AUDITOR: AUDITEE:
ROLAPACK & CO MR/F/11
ISO 9001:2015 AUDIT OBSERVATION REPORT Rev. : 00
Date :17/08/18 Auditor : S. SAMPATH Dept./Procees : EXTERNAL PROVIDERS
Audit No. :01 Auditee : A.V. RAMAN
Poured by
Clause No. Audit Observation
O+ NC OI
√
Verified External Providers rating (PUR/F/F/04) The average
level for the period of Apr-18 to July -18 is 100%.
Verified the Stock Book for RM stock of 5 Mil Kraft paper was
700 kgs as on 301/07/18. √