Project: ETAP Page: 1

Location: 19.0.1C Date: 03-13-2024

Contract: SN:

Engineer: Study Case: SC Revision: Base

Filename: work space management Config.: second mode

Electrical Transient Analyzer Program

Short-Circuit Analysis

ANSI Standard

3-Phase, LG, LL, & LLG Fault Currents

1.5-4 Cycle Network

Swing V-Control Load Total

Number of Buses: 1 0 5 6

Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total

Number of Branches: 2 0 0 3 0 0 5

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total

Number of Machines: 0 1 0 2 2 5

System Frequency: 60.00

Unit System: English

Project Filename: work space management

Output Filename: C:\Users\user\Documents\#PowerSystemArchitecture&Protection\PSP_TP02\Project 01\work


space management\SC.SA2S
Project: ETAP Page: 2

Location: 19.0.1C Date: 03-13-2024

Contract: SN:

Engineer: Study Case: SC Revision: Base

Filename: work space management Config.: second mode

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable / Busway Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable / Busway Resistance: Yes Individual


Project: ETAP Page: 3

Location: 19.0.1C Date: 03-13-2024

Contract: SN:

Engineer: Study Case: SC Revision: Base

Filename: work space management Config.: second mode

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

Bus1 SWNG 110.000 110.000 1 100.00 0.00


Bus2 Load 34.500 34.500 1 100.00 -30.00
Bus3 Load 34.500 34.500 1 100.00 -30.00
Bus9 Load 13.800 13.800 1 100.00 -60.00
Bus10 Load 13.800 13.800 1 100.00 -60.00
Bus14 Load 34.500 34.500 1 100.00 -30.00

6 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP .
Project: ETAP Page: 4

Location: 19.0.1C Date: 03-13-2024

Contract: SN:

Engineer: Study Case: SC Revision: Base

Filename: work space management Config.: second mode

Line/Cable/Busway Input Data

ohms or siemens per 1000 ft per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0

Cable1 35NCUN1 1/0 164.0 0.0 1 75 0.1217971 0.053 0.0009538 10

Cable3 35NCUN1 1/0 328.1 0.0 1 75 0.1217971 0.053 0.0953775 0.5

Cable4 15NCUS1 2 328.1 0.0 1 75 0.2193682 0.053 0.3490817 0.135

Line / Cable / Busway resistances are listed at the specified temperatures.


Project: ETAP Page: 5

Location: 19.0.1C Date: 03-13-2024

Contract: SN:

Engineer: Study Case: SC Revision: Base

Filename: work space management Config.: second mode

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 100.000 110.000 34.500 11.18 2.00 0 0 0 0 0 11.18 Dyn 30.00

T3 100.000 34.500 13.800 11.18 2.00 0 0 0 0 0 11.18 Dyn 30.00

2-Winding Transformer Grounding Input Data

Grounding
Transformer Rating Conn. Primary Secondary

ID MVA Prim. kV Sec. kV Type Type kV Amp ohm Type kV Amp ohm

T1 100.000 110.000 34.500 D/Y Solid

T3 100.000 34.500 13.800 D/Y Solid


Project: ETAP Page: 6

Location: 19.0.1C Date: 03-13-2024

Contract: SN:

Engineer: Study Case: SC Revision: Base

Filename: work space management Config.: second mode

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus1 Bus2 5.00 10.00 11.18

T3 2W XFMR Bus14 Bus9 5.00 10.00 11.18

Cable1 Cable Bus2 Bus3 0.17 0.07 0.18

Cable3 Cable Bus3 Bus14 0.34 0.15 0.37

Cable4 Cable Bus9 Bus10 3.78 0.91 3.89


Project: ETAP Page: 7

Location: 19.0.1C Date: 03-13-2024

Contract: SN:

Engineer: Study Case: SC Revision: Base

Filename: work space management Config.: second mode

Power Grid Input Data

% Positive Seq. Impedance % Zero Seq. Impedance


Power Grid Connected Bus Rating 100 MVA Base Grounding 100 MVA Base
ID ID MVASC kV X/R R X Type X/R R0 X0

U2 Bus1 1000.000 110.000 10.00 0.99504 9.95037 Wye - Solid 10.00 0.995037 9.95037

Total Power Grids (= 1 ) 1000.000 MVA


Project: ETAP Page: 8

Location: 19.0.1C Date: 03-13-2024

Contract: SN:

Engineer: Study Case: SC Revision: Base

Filename: work space management Config.: second mode

Induction Machine Input Data

Induction Machine Rating (Base) Positive Seq. Imp. Grounding Zero Seq. Imp.

ID Type Qty kVA kV RPM X"/R %R % X" % X' Conn. Type Amp X/R % R0 % X0

Mtr1 Motor 1 11.15 34.500 1800 3.70 6.301 23.31 9999.00 Wye Open 4.08 6.30 25.69

Mtr3 Motor 1 1.11 13.200 1800 3.70 6.944 25.69 9999.00 Wye Open 3.70 6.94 25.69

Total Connected Induction Machines ( = 2 ): 12.3 kVA


Project: ETAP Page: 9

Location: 19.0.1C Date: 03-13-2024

Contract: SN:

Engineer: Study Case: SC Revision: Base

Filename: work space management Config.: second mode

Lumped Load Input Data

Lumped Load Motor Loads

Impedance
Lumped Load Rating % Load Loading X/R Ratio (Machine Base) Grounding
ID kVA kV MTR STAT kW kvar X"/R X'/R %R % X" % X' Conn. Type Amp.

Lump1 4000.0 34.500 44 56 1496.0 927.1 10.00 10.00 1.538 15.38 23.08 Delta

Lump3 200.0 13.800 47 53 79.9 49.5 6.67 6.67 2.307 15.38 23.08 Delta

Total Connected Lumped Loads ( = 2 ): 4200.0 kVA


Project: ETAP Page: 10

Location: 19.0.1C Date: 03-13-2024

Contract: SN:

Engineer: Study Case: SC Revision: Base

Filename: work space management Config.: second mode

SHORT- CIRCUIT REPORT

Fault at bus: Bus3

Prefault voltage = 34.500 kV = 100.00 % of nominal bus kV ( 34.500 kV)


= 100.00 % of base kV ( 34.500 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus3 Total 0.00 8.119 0.00 108.62 96.27 7.773 7.773 5.99E+000 1.97E+001 2.00E+000 2.38E+001

Bus2 Bus3 0.87 7.988 21.57 95.28 90.59 7.669 7.773 6.16E+000 2.00E+001 2.00E+000 2.38E+001

Bus14 Bus3 0.00 0.007 0.00 108.62 96.27 0.005 0.000 2.46E+003 2.46E+004

Mtr1 Bus3 100.00 0.000 100.00 100.00 100.00 0.000 0.000 5.65E+004 8.96E+007

Lump1 Bus3 100.00 0.127 100.00 100.00 100.00 0.101 0.000 8.74E+001 1.31E+003

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 11

Location: 19.0.1C Date: 03-13-2024

Contract: SN:

Engineer: Study Case: SC Revision: Base

Filename: work space management Config.: second mode

Fault at bus: Bus14

Prefault voltage = 34.500 kV = 100.00 % of nominal bus kV ( 34.500 kV)


= 100.00 % of base kV ( 34.500 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus14 Total 0.00 8.026 0.00 109.75 96.90 7.558 7.558 6.32E+000 1.99E+001 2.26E+000 2.52E+001

Bus3 Bus14 1.75 8.019 2.88 108.39 96.29 7.553 7.558 6.33E+000 1.99E+001 2.26E+000 2.52E+001

Bus9 Bus14 0.05 0.007 55.97 63.36 99.74 0.005 0.000 2.46E+003 2.46E+004

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 12

Location: 19.0.1C Date: 03-13-2024

Contract: SN:

Engineer: Study Case: SC Revision: Base

Filename: work space management Config.: second mode

Short-Circuit Summary Report

1.5-4 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus3 34.500 2.359 -7.768 8.119 1.674 -7.590 7.773 6.756 2.048 7.060 6.206 5.687 8.418

Bus14 34.500 2.434 -7.648 8.026 1.689 -7.367 7.558 6.651 2.114 6.979 6.104 5.596 8.281

All fault currents are symmetrical (1.5-4 Cycle network) values in rms kA.
* LLG fault current is the larger of the two faulted line currents.
Project: ETAP Page: 13

Location: 19.0.1C Date: 03-13-2024

Contract: SN:

Engineer: Study Case: SC Revision: Base

Filename: work space management Config.: second mode

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)

ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

Bus3 34.500 0.71287 2.34761 2.45345 0.70467 2.32912 2.43338 0.23821 2.83067 2.84067 0.00000 0.00000 0.00000
Bus14 34.500 0.75276 2.36498 2.48189 0.74452 2.34648 2.46176 0.26950 2.99471 3.00681 0.00000 0.00000 0.00000