Quantity
S.No Bill No Tunnel Section No Segmet No Zone Start Station End Station Remarks
Work Place Concrete m3 Steel Ton
Left Wall for 1st
1 7.3A Haram Tunnel Sec 1 JAH_Z‐2_SEG‐9 Zone 2 0+670.033 0+690.033 295.50 47.28 Reinforced concrete
level
2 7.3A Haram Tunnel Sec 19 JAH_Z‐3_SEG‐8 Zone 3 1+133.979 1+153.979 Mid Slab 624.81 99.97 Reinforced concrete
3 7.3A Haram Tunnel Sec 1 JAH_Z‐4_SEG‐22 Zone 4 1+693.979 1+713.979 Base Slab 1248.00 199.68 Reinforced concrete
4 7.1 Dry Culvert D9‐2 Sec 111 D‐9‐18 Zone 2 0+106.995 0+126.995 Blinding 10.73 Plain Cement Concrete (PCC )
5 7.1 Dry Culvert D9‐2 Sec 111 D‐9‐19 Zone 2 0+126.995 0+146.995 Blinding 10.73 Plain Cement Concrete (PCC )