Concrete and Steel Quantity for 04‐02‐2024

Quantity
S.No Bill No Tunnel Section No Segmet No Zone Start Station End Station Remarks
Work Place Concrete m3 Steel Ton
Left Wall for 1st
1 7.3A Haram Tunnel Sec 1 JAH_Z‐2_SEG‐9 Zone 2 0+670.033 0+690.033 295.50 47.28 Reinforced concrete
level
2 7.3A Haram Tunnel Sec 19 JAH_Z‐3_SEG‐8 Zone 3 1+133.979 1+153.979 Mid Slab 624.81 99.97 Reinforced concrete

3 7.3A Haram Tunnel Sec 1 JAH_Z‐4_SEG‐22 Zone 4 1+693.979 1+713.979 Base Slab 1248.00 199.68 Reinforced concrete

4 7.1 Dry Culvert D9‐2 Sec 111 D‐9‐18 Zone 2 0+106.995 0+126.995 Blinding 10.73 Plain Cement Concrete (PCC )

5 7.1 Dry Culvert D9‐2 Sec 111 D‐9‐19 Zone 2 0+126.995 0+146.995 Blinding 10.73 Plain Cement Concrete (PCC )

Total Quantity For Date 04‐02‐2024 2189.76 346.93