You are on page 1of 4

Work to be Done Description of Work Unit Qty

Size ( 1.5M x1.5M x 2.12M )


Flat Packed Pre Fabricated 4 Sided
One line of Hesco bastion against the roadside wall and rear side of building (west Gabion with 5mm Job 1
towards railway track) with concret base. Round GI Wire (Zinc Coated) Weld
Mesh 75mm X 75mm Square Shape

size Aprox 1000 Sqft with 4 feet deep


Back Wall Concrete steel base Job 1

size Aprox 850 Sqft


Front Wall Concrete with 4 feet deep Steel base JOb 1

Gate Height is 10ft.


Gate length is 14ft
Replacement of existing main gate with New Gate. Main Frame : Ms Box Section Of Size 8” No 1
X 3”X 1/8” (10 SWG Gauge) with
concrete filling

Installation of Small exsisting with main Gate. 3 x 10 feet with 10 sqft dia and 10 feet
No 1
(Stainless Steel pillars filed with concrete) height

width 3.5 ft height 7ft door with


Provision of see through glass (vision
Replacement of the Wooden door (leading to main building) and Installation of Solid window 50mm) bullet proof glass to be No 1
Iron door (16 Gauge) with Heavey Duty Door Closer. installed fixed at both metal doors,
Size; 1x0.5 ft.

width 3.5 ft height 7ft door with


Provision of see through glass (vision
Replacement of the wooden door (Leading towards roof top) and Installation of Iron window 50mm) bullet proof glass to be No 1
Door (16 Gauge) with Heavy Duty Door Closer installed fixed at both metal doors,
Size; 1x0.5 ft.

width 3.5 ft height 7ft door with


Provision of see through glass (vision
Supply and Installation of Solid Iron Door (16 Gauge) with Heavy Duty Door Closer at window 50mm) bullet proof glass to be No 1
the rear side of building as EXIT rout. installed fixed at both metal doors,
Size; 1x0.5 ft.

width 3 ft height 7ft door with


Supply and Installation of Heavy Metal Door (16 Gauge) at the Main Office Entrance Provision of see through glass (vision No 1
with Heavy Duty Door Closer window 50mm) bullet proof glass to be
installed fixed at both metal doors,
Size; 1x0.5 ft.
1.Length = 42".
2.Height = 84".
3.SINGLE LEAF ( SWING TYPE )

Safe Room (Basement) Door Door Type: BULLET resistant No 1


Door Frame: 12 gauge steel sheet
Door: Manufactured from Mild Steel
Plate 10 MM thick on outer side and 6
mm thick on inner side.
Hinges: 40 mm thick heavy duty steel
hinge on top and bottom
Reinforcement: Internally reinforced
with Kevlar Layers: Installation of 27
layers of Kevlar
Door Hardware: Door closer , stainless
steel heavy duty push/pull handle.
frame in order to withstand the door
load.Locks: 2x heavy duty slide bolt

Change/Replacement of all Doors locks/keys system - Job 1

Supply and Installation of Walk-through gate metal detector at main entrance to the Walk through metal detector, ZKT (ZK- No 1
building. D4330)
Supply and Installation of and Installation Boom barrier at the main gate to reinforce No 1
the main gate against forced entrance.

Supply and Installation of Turnstile Door at the Reception Area No 1

Handheld Metal detector ZKT (ZK-D100S) No 2

Vehicles Search Mirrors No 2

Fire Blanket (Size 1.2 m x 1.2 m) No 10

Supply and Installation of stainless steel grills (16 & 18 Gauge) on remaining Job 1
Windows/Ventilators.
Tested Pressure 12.78 psi, 78, 79
psi/ms
Properties:
. Film thickness: 0.015"
Supply and Installation of Shatter Resistance Film (SRF), on all . Structure : Multiply Laminate.
Job 1
Doors/Windows/Ventilator Glasses. . Tensile Strength : 30,000psi
. PSI Break Strength. 450lbs/inch
(width)
.Adhesive type: Acrylic PSA
. Peel strength: 5 to 6lbs/inch

Supply and Installation of lighting around perimeter wall. (50 Watt Water Proof) with No 10
Switch Plates and required wiring (Including Cables/Ducts etc.)

Supply and Installation of Emergency lights (Complete including Wiring, Ducting No 8


Switch Plates etc.)

Supply and Installation of 4 MP (dome type) IP Camera Indoor No 12

Supply and Installation of 4 MP Outdoor IP Camera with bracket and all Mounting No 12
Accessories

Supply and Installation of 32 Channel NVR (Raid Capable) having frame rate and other
specifications as mentioned on the drawing or instructed by the consultant, including No 1
system configuration and licenses for 3 concurrent sessions. NVR should be capable of
below mentioned HDD

Supply and Installation of CAT 6, Cable 3M Roll 2

Providing and fixing of 24 port POE switch, including system configuration etc. No 2
complete in all respect,s Poe Switch should have 2 extra ports for Up link

RJ Connectors No 100

3x8TB (each NVR) Surveillance grade HDD or more as per min 30 days recording No 1
requirement (or as specified by security team) at min. 20fps

Hard Drive 8 TB survillence grade No 1

Razor Wire arround the building 24" dia Complete Work-24" dia Job 1

Supply and Installation of Public Announcement System with Loud Speakers covering Job 1
the entire building / office rooms (With complete Wiring, Ducting etc.)

Delivery and Installation of Biometric Access Reader at the Main Office Entrance No
(With complete Wiring, Ducting etc.) 1
Fire Extinguishers 9 kg Filled (CO2 type) for the server room No 2

Fire Extinguishers 9 kg Filled (Dry powder) No 15

Fire Alarm System same as the IOM Main Office No 1

Pre Fabricated Guard Room 5'x5'x7' at the premises entrance


Providing and fixing of Pre Fabricated Guard cabin with 50mm thick polystyrene panel
out side and 50mm thick polystyrene panel on roof including 2 sliding and 1 fixed upvc No 2
windows ,1 upvc door as required size.Complete electric work with warm lights and
fan. Complete in all respect.

UPS back up 5 KVA Job 1

10 Cans and
Back up Fuel Storage Plastic Cans with top shed Job
01 Top Shed