Installation of Small exsisting with main Gate. 3 x 10 feet with 10 sqft dia and 10 feet
No 1
(Stainless Steel pillars filed with concrete) height
Supply and Installation of Walk-through gate metal detector at main entrance to the Walk through metal detector, ZKT (ZK- No 1
building. D4330)
Supply and Installation of and Installation Boom barrier at the main gate to reinforce No 1
the main gate against forced entrance.
Supply and Installation of stainless steel grills (16 & 18 Gauge) on remaining Job 1
Windows/Ventilators.
Tested Pressure 12.78 psi, 78, 79
psi/ms
Properties:
. Film thickness: 0.015"
Supply and Installation of Shatter Resistance Film (SRF), on all . Structure : Multiply Laminate.
Job 1
Doors/Windows/Ventilator Glasses. . Tensile Strength : 30,000psi
. PSI Break Strength. 450lbs/inch
(width)
.Adhesive type: Acrylic PSA
. Peel strength: 5 to 6lbs/inch
Supply and Installation of lighting around perimeter wall. (50 Watt Water Proof) with No 10
Switch Plates and required wiring (Including Cables/Ducts etc.)
Supply and Installation of 4 MP Outdoor IP Camera with bracket and all Mounting No 12
Accessories
Supply and Installation of 32 Channel NVR (Raid Capable) having frame rate and other
specifications as mentioned on the drawing or instructed by the consultant, including No 1
system configuration and licenses for 3 concurrent sessions. NVR should be capable of
below mentioned HDD
Providing and fixing of 24 port POE switch, including system configuration etc. No 2
complete in all respect,s Poe Switch should have 2 extra ports for Up link
RJ Connectors No 100
3x8TB (each NVR) Surveillance grade HDD or more as per min 30 days recording No 1
requirement (or as specified by security team) at min. 20fps
Razor Wire arround the building 24" dia Complete Work-24" dia Job 1
Supply and Installation of Public Announcement System with Loud Speakers covering Job 1
the entire building / office rooms (With complete Wiring, Ducting etc.)
Delivery and Installation of Biometric Access Reader at the Main Office Entrance No
(With complete Wiring, Ducting etc.) 1
Fire Extinguishers 9 kg Filled (CO2 type) for the server room No 2
10 Cans and
Back up Fuel Storage Plastic Cans with top shed Job
01 Top Shed