16SEPTEMBER2021
Date: 15 Sep-21
CAPA
Measurement in
L1 L1 L2 L2 L3
minutes
`
M N M N M
MACHINE SPEED
OUTPUT / HRS - Exclude Budgeted Downtime HRS
FAT (Full avaialble
FAT OUTPUT PER DAY
Time) / day
OUTPUT PER HOUR - Actual HRS
OUTPUT / DAY - Actual Production @ Calculation HRS
Minutes
PUBLIC HOLIDAY
SCHEDULE TIME (ST) : Idle Time (Idle MAJOR ENG WORK
(FAT- IT) Time) / day SHUTDOWN (No prod. Due to…....)
Idle time
SCHEDULE TIME (ST) Minutes
i Breaktime
ii Change size
iii Change Kraft
iv Change Web
PDT (Planned Down v Change Ribbon
Time) _ Production vi Change Product
down time
vii Change Printmat
viii Line cleaning
OT (Operating Time) :
viiii Line Clearance
(ST - PDT - UDT )
TOTAL PDT Minutes
i Smart Date problem
ii Tucker problem
UDT - Engineering iii)
down time
TOTAL UDT
TOTAL OPERATING TIME (OT) Minutes
i cutting adjustment
MS (Minor
Stoppage)
ii allignment adjustment
NOT (Net Operating
Time): OT - MS - SL
i others
SL (Speed Loss)
ii
TOTAL NET OPERATING TIME (NOT) Minutes
i Online rejects (Production)
VOT Defects & Scrap ii Final Pack rejects
(Valuable Operating
Time) : NOT - D/S iii
No of Packaging
Packaging Capability
%
i Absenteesim
ii MC
TOTAL OPERATORS
PER HOUR
PER SHIFT
PACKAGING OUTPUT
APACITY CALCULATION PER DAY
L3 L4 L4 L5 L5 L6 L6 L7 L7 L8 L8 L9 L9
N M N M N M N M N M N M N
74 70 73
4,440 4,200 4,380
53,280 50,400 52,560
3,816 3,750 3,916
45,800 45,000 47,800
720 720 720
1 1 1
0 0 0
0 0 0
1 1 1
720.00 720.00 720.00
0.00 0.00 0.00
2.00 0.00 0.00
5.00 0.00 5.00
12.00 12.00 11.00
7.00 8.00 8.00
0.00 0.00 0.00
0.00 0.00 0.00
5.00 5.000 5.00
2.00 5.00 5.00
33.00 30.00 34.00
0.00
15 3
14 20 19
M N N
156,240
11,482
138,600