STAGE III: Design and Tender documents


Phase 2: Detailed Design and Tender Documents
Step A : Final Detailed Design Proposal
CLINICAL CENTER OF NIŠ - CCN
Niš

Date of Document
Volume Book Section Doc. No. Blg. Type English Description Level Serbian Description Scale Name
File Name
submmision
00_TECHNOLOGY DESIGN / MEDICINSKE FUNKCIJE I TOKOVI
10_FP - FUNCTIONS AND FLOWS PROJECT / MEDICINSKE FUNKCIJE I TOKOVI
Building 27 and 582_CCN3_2B_27&28A_D_FP100_eng_05
09.06.2014. 1 2 1 - Report Medical functions and flows - Medicinske funkcije i tokovi 1:200 FP100
28A 582_CCN3_2B_27&28A_D_FP100_srp_05
10_FP - FUNCTIONS AND FLOWS PROJECT_BUILDING 27 /MEDICINSKE FUNKCIJE I TOKOVI _OBJEKAT 27
09.06.2014. 1 2 1 1 Building 27 Plan Medical functions and flows Level -1 Medicinske funkcije i tokovi -Nivo -1 1:200 FP101-27 582_CCN3_2B_27_D_FP101_05
09.06.2014. 1 2 1 2 Building 27 Plan Medical functions and flows Level ±0 Medicinske funkcije i tokovi -Nivo ±0 1:200 FP102-27 582_CCN3_2B_27_D_FP102_05
09.06.2014. 1 2 1 3 Building 27 Plan Medical functions and flows Level +1 Medicinske funkcije i tokovi -Nivo +1 1:200 FP103-27 582_CCN3_2B_27_D_FP103_05
09.06.2014. 1 2 1 4 Building 27 Plan Medical functions and flows Level +2 Medicinske funkcije i tokovi -Nivo +2 1:200 FP104-27 582_CCN3_2B_27_D_FP104_05
10_FP - FUNCTIONS AND FLOWS PROJECT_BUILDING 28A /MEDICINSKE FUNKCIJE I TOKOVI _OBJEKAT 28A
09.06.2014. 1 2 1 5 Building 28A Plan Medical functions and flows Level -1 Medicinske funkcije i tokovi -Nivo -1 1:200 FP101-28A 582_CCN3_2B_28A_D_FP101_05
09.06.2014. 1 2 1 6 Building 28A Plan Medical functions and flows Level ±0 Medicinske funkcije i tokovi -Nivo ±0 1:200 FP102-28A 582_CCN3_2B_28A_D_FP102_05
09.06.2014. 1 2 1 7 Building 28A Plan Medical functions and flows Level +1 Medicinske funkcije i tokovi -Nivo +1 1:200 FP103-28A 582_CCN3_2B_28A_D_FP103_05
09.06.2014. 1 2 1 8 Building 28A Plan Medical functions and flows Level +2 Medicinske funkcije i tokovi -Nivo +2 1:200 FP104-28A 582_CCN3_2B_28A_D_FP104_05
09.06.2014. 1 2 1 9 Building 28A Plan Medical functions and flows Level +3 Medicinske funkcije i tokovi -Nivo +3 1:200 FP105-28A 582_CCN3_2B_28A_D_FP105_05
09.06.2014. 1 2 1 10 Building 28A Plan Medical functions and flows Level +4 Medicinske funkcije i tokovi -Nivo +4 1:200 FP106-28A 582_CCN3_2B_28A_D_FP106_05
09.06.2014. 1 2 1 11 Building 28A Plan Medical functions and flows Level +5 Medicinske funkcije i tokovi -Nivo +5 1:200 FP107-28A 582_CCN3_2B_28A_D_FP107_05
10_FP - ROOM DATA SHEET /PODACI O PROSTORIJAMA
09.06.2014. 1 2 2,3 General Document Report Room data sheets Tehnoloski podaci o prostorijama FF001 582_CCN3_2B_XX_R_FF001_05

20_SCHEMES AND SCHEDULES / ŠEME I RASPOREDI


20_FW - WAYFINDING SCHEMES / ŠEME KRETANJA
20_FW - WAYFINDING SCHEMES_BUILDING 27 /ŠEME KRETANJA U OBJEKTU 27
09.06.2014. 1 3 - 12 Building 27 Plan Wayfinding shcme Level -1 Šema kretanja - Nivo -1 1:200 FW101-27 582_CCN3_2B_27_D_FW101_05
09.06.2014. 1 3 - 13 Building 27 Plan Wayfinding shcme Level ±0 Šema kretanja - Nivo ±0 1:200 FW102-27 582_CCN3_2B_27_D_FW102_05
09.06.2014. 1 3 - 14 Building 27 Plan Wayfinding shcme Level +1 Šema kretanja - Nivo +1 1:200 FW103-27 582_CCN3_2B_27_D_FW103_05
09.06.2014. 1 3 - 15 Building 27 Plan Wayfinding shcme Level +2 Šema kretanja - Nivo +2 1:200 FW104-27 582_CCN3_2B_27_D_FW104_05
20_FW - WAYFINDING SCHEMES_BUILDING 28A /ŠEME KRETANJA U OBJEKTU 28A
09.06.2014. 1 3 - 16 Building 28A Plan Wayfinding shcme Level -1 Šema kretanja - Nivo -1 1:200 FW101-28A 582_CCN3_2B_28A_D_FW101_05
09.06.2014. 1 3 - 17 Building 28A Plan Wayfinding shcme Level ±0 Šema kretanja - Nivo ±0 1:200 FW102-28A 582_CCN3_2B_28A_D_FW102_05
09.06.2014. 1 3 - 18 Building 28A Plan Wayfinding shcme Level +1 Šema kretanja - Nivo +1 1:200 FW103-28A 582_CCN3_2B_28A_D_FW103_05
09.06.2014. 1 3 - 19 Building 28A Plan Wayfinding shcme Level +2 Šema kretanja - Nivo +2 1:200 FW104-28A 582_CCN3_2B_28A_D_FW104_05
09.06.2014. 1 3 - 20 Building 28A Plan Wayfinding shcme Level +3 Šema kretanja - Nivo +3 1:200 FW105-28A 582_CCN3_2B_28A_D_FW105_05
09.06.2014. 1 3 - 21 Building 28A Plan Wayfinding shcme Level +4 Šema kretanja - Nivo +4 1:200 FW106-28A 582_CCN3_2B_28A_D_FW106_05
09.06.2014. 1 3 - 22 Building 28A Plan Wayfinding shcme Level +5 Šema kretanja - Nivo +5 1:200 FW107-28A 582_CCN3_2B_28A_D_FW107_05
20_FE - FURNITURE AND EQUIPMENT LOADING PLANS
20_FE - FURNITURE AND EQUIPMENT LOADING PLANS_BUILDING 27 / RASPORED NAMEŠTAJA I OPREME U OBJEKTU 27
09.06.2014. 1 4 - 23 Building 27 Plan Furniture and equipment Level -1 Nameštaj i oprema -Nivo -1 1:100 FE101-27 582_CCN3_2B_27_D_FE101_05
09.06.2014. 1 4 - 24 Building 27 Plan Furniture and equipment Level ±0 Nameštaj i oprema -Nivo ±0 1:100 FE102-27 582_CCN3_2B_27_D_FE102_05
09.06.2014. 1 4 - 25 Building 27 Plan Furniture and equipment Level +1 Nameštaj i oprema -Nivo +1 1:100 FE103-27 582_CCN3_2B_27_D_FE103_05
09.06.2014. 1 4 - 26 Building 27 Plan Furniture and equipment Level +2 Nameštaj i oprema -Nivo +2 1:100 FE104-27 582_CCN3_2B_27_D_FE104_05
20_FE - FURNITURE AND EQUIPMENT LOADING PLANS_BUILDING 28A RASPORED NAMEŠTAJA I OPREME U OBJEKTU 28A
09.06.2014. 1 4 - 27 Building 28A Plan Furniture and equipment Level -1 Nameštaj i oprema -Nivo -1 1:100 FE101-28A 582_CCN3_2B_28A_D_FE101_05
09.06.2014. 1 4 - 28 Building 28A Plan Furniture and equipment Level ±0 Nameštaj i oprema -Nivo ±0 1:100 FE102-28A 582_CCN3_2B_28A_D_FE102_05
09.06.2014. 1 4 - 29 Building 28A Plan Furniture and equipment Level +1 Nameštaj i oprema -Nivo +1 1:100 FE103-28A 582_CCN3_2B_28A_D_FE103_05
09.06.2014. 1 4 - 30 Building 28A Plan Furniture and equipment Level +2 Nameštaj i oprema -Nivo +2 1:100 FE104-28A 582_CCN3_2B_28A_D_FE104_05
09.06.2014. 1 4 - 31 Building 28A Plan Furniture and equipment Level +3 Nameštaj i oprema -Nivo +3 1:100 FE105-28A 582_CCN3_2B_28A_D_FE105_05
09.06.2014. 1 4 - 32 Building 28A Plan Furniture and equipment Level +4 Nameštaj i oprema -Nivo +4 1:100 FE106-28A 582_CCN3_2B_28A_D_FE106_05
09.06.2014. 1 4 - 33 Building 28A Plan Furniture and equipment Level +5 Nameštaj i oprema -Nivo +5 1:100 FE107-28A 582_CCN3_2B_28A_D_FE107_05
20_FE - FURNITURE AND EQUIPMENT SCHEDULE / TABELA PODATAKA O NAMEŠTAJU I OPREMI
34 (FE1- Building 27 and
09.06.2014. 1 4 - Key Table Furniture and equipment schedule - Tabela podataka o nameštaju i opremi - FE100 582_CCN3_2B_27&28A_D_FE100_05
FE21) 28A
DOCUMENT LIST
STAGE III: Design and Tender documents
Phase 2: Detailed Design and Tender Documents
Step A : Final Detailed Design Proposal
CLINICAL CENTER OF NIŠ - CCN
Niš

Date of Document
Volume Book Section Doc. No. Blg. Type English Description Level Serbian Description Scale Name
File Name
submmision
A 2 ARCHITECTURAL WORKS / ARHITEKTURA
2 00_GENERAL DOCUMENTS /OPŠTA DOKUMENTACIJA
2 10_AG - ARCHITECTURAL GENERAL DRAWINGS AND REPORTS / OPŠTA DOKUMENTACIJA ARHITEKTONSKOG DELA PROJEKTA
General documentation: Company registration, Decisions on Opšta dokumentacija: Registracija firme, Rešenje o imenovanju
09.06.2014. 2 1 General Document Document appointment of responsible designers, Licences of responsible - odgovornih projektanata, Licence odgovornih projektanata, Izjava o - - -
designers Statement of syncronization of design etc usaglašenosti projektne dokumentacije itd
09.06.2014. 2 1 General Document Document Location permit - Lokacijska dozvola - - ccn_locationpermit_2013-08-05
09.06.2014. 2 1 General Document Document Copy of plan - Kopija plana - - ccn_copy of plan_2013-05-13

09.06.2014. 2 1 General Document Document Protocol of Regulation - Protokol regulacije - - ccn_protocol regulacije_2013-09

09.06.2014. 2 1 General Document Document Cadastral-topographic plan - Katastarsko-topografski plan - - ccn_cadastral topographic_2013-07

09.06.2014. 2 1 General Document Document Underground installations cadastral plan - Kopiija plana vodova - - ccn_underground cadastral_2013-05-10

09.06.2014. 2 1 General Document Document Proof of ownership - Izvod iz lista nepokretnosti - - ccn_proof of ownership_2013-05-13

Announcement of City of Nis, Administration for Real Estate and


General Document Document - Obaveštenje Grada Niša, Uprave za imovinu i inspekcijske poslove br. 46 - - ccn_announcement_city of nis
Inspection number 463-112/2013-04
Agreement of the Land Development Public Agency of Nis number 03-
General Document Document - Saglasnost Direkcije za izgradnju grada Niša broj 03-9596 - - ccn_public agency_ nis
9596

General Document Document Agreement of the Mayer of the City of Nis number 3279/2013-01 - Saglasnost Gradonacelnika grada Niša broj 3279/2013-01 - - ccn_mayor city of nis_ nis

09.06.2014. 2 1 General Document Document Design Brief for building 27 - Projektni zadatak za objekat 27 - AG001_27 ccn_terms of reference 27&28A&T1&T2_2013_04_15

09.06.2014. 2 1 General Document Document Design Brief for building 28A - Projektni zadatak za objekat 28A - AG001_28A ccn_terms of reference 27&28A&T1&T2_2013_04_15

582_CCN3_2B_27_R_AG002_05_eng
09.06.2014. 2 1 General Document Report Technical report for building 27 - Tehnicki opis za objekat 27 - AG002_27
582_CCN3_2B_27_R_AG002_05_srp
582_CCN3_2B_28A_R_AG002_05_eng
09.06.2014. 2 1 General Document Report Technical report for building 28A - Tehnicki opis za objekat 28A - AG002_28A
582_CCN3_2B_28A_R_AG002_05_srp
582_CCN3_2B_27&28A_R_AG003_05_eng
09.06.2014. 2 1 General Document Report Summary of areas for buildings 27&28A - Rekapitulacija povrsina za objekte 27&28A - AG003_27&28A
582_CCN3_2B_27&28A_R_AG003_05_srp

09.06.2014. 2 1 General Document Report Room list for building 27 - Spisak prostorija za objekat 27 - AG003a_27 582_CCN3_2B_27_R_AG003a_05

09.06.2014. 2 1 General Document Report Room list for building 28A - Spisak prostorija za objekat 28A - AG003a_28A 582_CCN3_2B_28A_R_AG003a_05

582_CCN3_2B_27&28A_AG004_05_eng
09.06.2014. 2 1 General Document Report General conditions for developing for building 27 and 28A - Opsti uslovi za izvodjenje radova za objekte 27 i 28A - AG004-27-28A
582_CCN3_2B_27&28A_AG004_05_srp

582_CCN3_2B_27&28A_AG005_05_eng
09.06.2014. 2 1 General Document Report Report on safety at work - Prilog o zaštiti na radu - AG005-27-28A
582_CCN3_2B_27&28A_AG005_05_srp
2 20_AG - BUILDING PHYSICS REPORT /ELABORAT GRADJEVINSKE FIZIKE
582_CCN3_2B_27_R_AG008_05_eng
09.06.2014. 2 1 General Document Report Building physics for building 27 - Elaborat građevinske fizike za objekat 27 - AG008-27
582_CCN3_2B_27_R_AG008_05_srp
582_CCN3_2B_28A_R_AG008_05_eng
09.06.2014. 2 1 General Document Report Building physics for building 28A - Elaborat građevinske fizike za objekat 28A - AG008-28A
582_CCN3_2B_28A_R_AG008_05_srp
2 30_AG - ARCHITECTURAL BILL OF QUANTITIES
09.06.2014. 2 2 General Document Report Bill of Quantities for building 27 - Predmer i predračun radova za objekat 27 - AG007-27 582_CCN3_2B_27_R_AG007_05

09.06.2014. 2 2 General Document Report Bill of Quantities for building 28A - Predmer i predračun radova za objekat 28A - AG007-28A 582_CCN3_2B_28A_R_AG007_05

10_BUILDING 27 / OBJEKAT 27
10_AS - STATUS QUO / POSTOJEĆE STANJE
09.06.2014. 2 3 1 Building 27 Plan Status Quo Site plan Situacija 1:1000 AS_100 582_CCN3_2B_27_D_AS100_05
09.06.2014. 2 3 2 Building 27 Plan Status Quo Foundation level Osnova temelja 1:200 AS_110 582_CCN3_2B_27_D_AS110_05
09.06.2014. 2 3 3 Building 27 Plan Status Quo Level -1 Nivo -1 1:200 AS_101 582_CCN3_2B_27_D_AS101_05
09.06.2014. 2 3 4 Building 27 Plan Status Quo Level 0 Nivo 0 1:200 AS_102 582_CCN3_2B_27_D_AS102_05
09.06.2014. 2 3 5 Building 27 Plan Status Quo Level 1 Nivo 1 1:200 AS_103 582_CCN3_2B_27_D_AS103_05
09.06.2014. 2 3 6 Building 27 Plan Status Quo Level 2 Nivo 2 1:200 AS_104 582_CCN3_2B_27_D_AS104_05
09.06.2014. 2 3 7 Building 27 Plan Status Quo Roof level Osnova krova 1:200 AS_105 582_CCN3_2B_27_D_AS105_05
09.06.2014. 2 3 8 Building 27 Section Status Quo Section A-A Presek A-A 1:200 AS_201 582_CCN3_2B_27_D_AS201_05
09.06.2014. 2 3 9 Building 27 Section Status Quo Section B-B Presek B-B 1:200 AS_202 582_CCN3_2B_27_D_AS202_05
09.06.2014. 2 3 10 Building 27 Section Status Quo Section C-C Presek C-C 1:200 AS_203 582_CCN3_2B_27_D_AS203_05
09.06.2014. 2 3 11 Building 27 Elevation Status Quo Elevation Northeast Severoistocna fasada 1:200 AS_301 582_CCN3_2B_27_D_AS301_05
09.06.2014. 2 3 12 Building 27 Elevation Status Quo Elevation Northwest Severozapadna fasada 1:200 AS_302 582_CCN3_2B_27_D_AS302_05
09.06.2014. 2 3 13 Building 27 Elevation Status Quo Elevation Southwest Jugozapadna fasada 1:200 AS_303 582_CCN3_2B_27_D_AS303_05
09.06.2014. 2 3 14 Building 27 Elevation Status Quo Elevation Southeast Jugoistocna fasada 1:200 AS_304 582_CCN3_2B_27_D_AS304_05
DOCUMENT LIST
STAGE III: Design and Tender documents
Phase 2: Detailed Design and Tender Documents
Step A : Final Detailed Design Proposal
CLINICAL CENTER OF NIŠ - CCN
Niš

Date of Document
Volume Book Section Doc. No. Blg. Type English Description Level Serbian Description Scale Name
File Name
submmision
20_AC - COMPARATIVE / UPOREDNO STANJE
09.06.2014. 2 3 15 Building 27 Plan Comparative Site plan Situacija 1:1000 AC100-27 582_CCN3_2B_27_D_AC100_05
09.06.2014. 2 3 16 Building 27 Plan Comparative Foundation level Osnova temelja 1:200 AC110-27 582_CCN3_2B_27_D_AS110_05
09.06.2014. 2 3 17 Building 27 Plan Comparative Level -1 Nivo -1 1:200 AC101-27 582_CCN3_2B_27_D_AC101_05
09.06.2014. 2 3 18 Building 27 Plan Comparative Level 0 Nivo 0 1:200 AC102-27 582_CCN3_2B_27_D_AC102_05
09.06.2014. 2 3 19 Building 27 Plan Comparative Level 1 Nivo 1 1:200 AC103-27 582_CCN3_2B_27_D_AC103_05
09.06.2014. 2 3 20 Building 27 Plan Comparative Level 2 Nivo 2 1:200 AC104-27 582_CCN3_2B_27_D_AC104_05
09.06.2014. 2 3 21 Building 27 Plan Comparative Roof level Osnova krova 1:200 AC105-27 582_CCN3_2B_27_D_AC105_05
09.06.2014. 2 3 22 Building 27 Section Comparative Section A-A Presek A-A 1:200 AC201-27 582_CCN3_2B_27_D_AC201_05
09.06.2014. 2 3 23 Building 27 Section Comparative Section B-B Presek B-B 1:200 AC202-27 582_CCN3_2B_27_D_AC202_05
09.06.2014. 2 3 24 Building 27 Section Comparative Section C-C Presek C-C 1:200 AC203-27 582_CCN3_2B_27_D_AC203_05
09.06.2014. 2 3 25 Building 27 Elevation Comparative Elevation Northeast Severoistocna fasada 1:200 AC301-27 582_CCN3_2B_27_D_AC301_05
09.06.2014. 2 3 26 Building 27 Elevation Comparative Elevation Northwest Severozapadna fasada 1:200 AC302-27 582_CCN3_2B_27_D_AC302_05
09.06.2014. 2 3 27 Building 27 Elevation Comparative Elevation Southwest Jugozapadna fasada 1:200 AC303-27 582_CCN3_2B_27_D_AC303_05
09.06.2014. 2 3 28 Building 27 Elevation Comparative Elevation Southeast Jugoistocna fasada 1:200 AC304-27 582_CCN3_2B_27_D_AC304_05
30_APT - PROJECT (PROPOSAL)+FINISHES /PROJEKAT I ZAVRŠNE OBRADE
09.06.2014. 2 4 29 Building 27 Site Plan Project Site plan-roof level Situacija - objekat 27 (osnova krova) 1:500 APT100-27 582_CCN3_2B_27_D_APT100_05
09.06.2014. 2 4 30 Building 27 Plan Project+Finishes Foundation level Osnova temelja 1:100 APT110-27 582_CCN3_2B_27_D_APT110_05
09.06.2014. 2 4 31 Building 27 Plan Project+Finishes Level -1 Osnova Nivo -1 1:200 APT101-27 582_CCN3_2B_27_D_APT101_05
09.06.2014. 2 4 32 Building 27 Plan Project+Finishes Level -1 / Part A Osnova Nivo -1/Deo A 1:50 APT101A-27 582_CCN3_2B_27_D_APT101_A_B_C_05
09.06.2014. 2 4 33 Building 27 Plan Project+Finishes Level -1 / Part B Osnova Nivo -1/Deo B 1:50 APT101B-27 582_CCN3_2B_27_D_APT101_A_B_C_05
09.06.2014. 2 4 34 Building 27 Plan Project+Finishes Level -1 / Part C Osnova Nivo -1/Deo C 1:50 APT101C-27 582_CCN3_2B_27_D_APT101_A_B_C_05
09.06.2014. 2 4 35 Building 27 Plan Project+Finishes Level ±0 Osnova Nivo ±0 1:200 APT102-27 582_CCN3_2B_27_D_APT102_05
09.06.2014. 2 4 36 Building 27 Plan Project+Finishes Level ±0 / Part A Osnova Nivo ±0/Deo A 1:50 APT102A-27 582_CCN3_2B_27_D_APT102_A_B_C_05
09.06.2014. 2 4 37 Building 27 Plan Project+Finishes Level ±0 / Part B Osnova Nivo ±0/Deo B 1:50 APT102B-27 582_CCN3_2B_27_D_APT102B_A_B_C_05
09.06.2014. 2 4 38 Building 27 Plan Project+Finishes Level ±0 / Part C Osnova Nivo ±0/Deo C 1:50 APT102C-27 582_CCN3_2B_27_D_APT102C_A_B_C_05
09.06.2014. 2 4 39 Building 27 Plan Project+Finishes Level +1 Osnova Nivo +1 1:200 APT103-27 582_CCN3_2B_27_D_APT103_05
09.06.2014. 2 4 40 Building 27 Plan Project+Finishes Level +1 / Part A Osnova Nivo +1/Deo A 1:50 APT103A-27 582_CCN3_2B_27_D_APT103_A_B_C_05
09.06.2014. 2 4 41 Building 27 Plan Project+Finishes Level +1 / Part B Osnova Nivo +1/Deo B 1:50 APT103B-27 582_CCN3_2B_27_D_APT103_A_B_C_05
09.06.2014. 2 4 42 Building 27 Plan Project+Finishes Level +1 / Part C Osnova Nivo +1/Deo C 1:50 APT103C-27 582_CCN3_2B_27_D_APT103_A_B_C_05
09.06.2014. 2 4 43 Building 27 Plan Project+Finishes Level +2 Osnova Nivo +2 1:200 APT104-27 582_CCN3_2B_27_D_APT104_05
09.06.2014. 2 4 44 Building 27 Plan Project+Finishes Level +2 / Part A Osnova Nivo +2/Deo A 1:50 APT104A-27 582_CCN3_2B_27_D_APT104_A_B_C_05
09.06.2014. 2 4 45 Building 27 Plan Project+Finishes Level +2 / Part B Osnova Nivo +2/Deo B 1:50 AP104B-27 582_CCN3_2B_27_D_AP104_A_B_C_05
09.06.2014. 2 4 46 Building 27 Plan Project+Finishes Level + 2 / Part C Osnova Nivo +2/Deo C 1:50 APT104C-27 582_CCN3_2B_27_D_APT104_A_B_C_05
09.06.2014. 2 4 47 Building 27 Plan Project+Finishes Roof level Osnova krova 1:100 APT105-27 582_CCN3_2B_27_D_APT105_05
09.06.2014. 2 4 48 Building 27 Section Project+Finishes Section AA Presek AA 1:50 APT201-27 582_CCN3_2B_27_D_APT201_05
09.06.2014. 2 4 49 Building 27 Section Project+Finishes Section BB Presek BB 1:50 APT202-27 582_CCN3_2B_27_D_APT202_05
09.06.2014. 2 4 50 Building 27 Section Project+Finishes Section CC Presek CC 1:50 APT203-27 582_CCN3_2B_27_D_APT203_05
09.06.2014. 2 4 51 Building 27 Section Project+Finishes Section DD Presek DD 1:50 APT204-27 582_CCN3_2B_27_D_APT204_05
09.06.2014. 2 4 52 Building 27 Elevation Project+Finishes Elevation NE Severoistocna fasada 1:50 APT301-27 582_CCN3_2B_27_D_APT301_05
09.06.2014. 2 4 53 Building 27 Elevation Project+Finishes Elevation SW Jugozapadna fasada 1:50 APT302-27 582_CCN3_2B_27_D_APT302_05
09.06.2014. 2 4 54 Building 27 Elevation Project+Finishes Elevation SE Jugoistocna fasada 1:50 APT303-27 582_CCN3_2B_27_D_APT303_05
09.06.2014. 2 4 55 Building 27 Elevation Project+Finishes Elevation NW Severozapadna fasada 1:50 APT304-27 582_CCN3_2B_27_D_APT304_05
40_AT- TYPO PLANS /YZAVRŠNE OBRADE PLAFONA I PODOVA
09.06.2014. 2 5 56 Building 27 Typo plan Suspended ceiling Level -1 Spušteni plafoni -Nivo -1 1:200 AT105-27 582_CCN3_2B_27_D_AT105_05
09.06.2014. 2 5 57 Building 27 Typo plan Suspended ceiling Level ±0 Spušteni plafoni -Nivo ±0 1:200 AT106-27 582_CCN3_2B_27_D_AT106_05
09.06.2014. 2 5 58 Building 27 Typo plan Suspended ceiling Level +1 Spušteni plafoni -Nivo +1 1:200 AT107-27 582_CCN3_2B_27_D_AT107_05
09.06.2014. 2 5 59 Building 27 Typo plan Suspended ceiling Level +2 Spušteni plafoni -Nivo +2 1:200 AT108-27 582_CCN3_2B_27_D_AT108_05
09.06.2014. 2 5 60 Building 27 Typo plan Flooring Level -1 Završne obrade podova -Nivo -1 1:200 AT109-27 582_CCN3_2B_27_D_AT109_05
09.06.2014. 2 5 61 Building 27 Typo plan Flooring Level ±0 Završne obrade podova -Nivo ±0 1:200 AT110-27 582_CCN3_2B_27_D_AT110_05
09.06.2014. 2 5 62 Building 27 Typo plan Flooring Level +1 Završne obrade podova -Nivo +1 1:200 AT111-27 582_CCN3_2B_27_D_AT111_05
09.06.2014. 2 5 63 Building 27 Typo plan Flooring Level +2 Završne obrade podova -Nivo +2 1:200 AT112-27 582_CCN3_2B_27_D_AT112_05
50_AA - ABACUS /ŠEME
09.06.2014. 2 5 64 Building 27 Abacus Walls - Šeme zidova 1:10 AA101-27 582_CCN3_2B_27_D_AA101_05
09.06.2014. 2 5 65 Building 27 Abacus Floor slabs - Šeme međuspratnih tavanica 1:10 AA102-27 582_CCN3_2B_27_D_AA102_05
09.06.2014. 2 5 66 67 68 Building 27 Abacus Internal doors and windows - Šeme unutrašnje stolarije / vrata i prozori 1:20 AA103-27 582_CCN3_2B_27_D_AA103_05
09.06.2014. 2 5 69 Building 27 Abacus External doors and windows - Šeme spoljne stolarije / vrata i prozori 1:20 AA104-27 582_CCN3_2B_27_D_AA104_05
09.06.2014. 2 5 70 Building 29 Abacus Ceilings - Detalji spuštenih plafona 1:5 AA105-27 582_CCN3_2B_27_D_AA105_05
09.06.2014. 2 5 71 Building 28 Abacus Railings - Šeme bravarije 1:20 AA106-27 582_CCN3_2B_27_D_AA106_05
60_AD - CONSTRUCTION DETAILS / KONSTRUKTIVNI DETALJI
09.06.2014. 2 5 72 Building 27 Details Exterlnal staircase ST3 - Spoljno stepenište ST3 1:20/… AD101-27 582_CCN3_2B_27_D_AD101_05
09.06.2014. 2 5 73 Building 27 Details Pedestrian bridges - Pasarele 1:20/… AD102-27 582_CCN3_2B_27_D_AD102_05
09.06.2014. 2 5 74 Building 27 Details Section-facade - Presek-fasada 1:20/… AD103-27 582_CCN3_2B_27_D_AD103_05
09.06.2014. 2 5 75 Building 27 Details Section-main entrance - Presek-glavni ulaz 1:20/… AD104-27 582_CCN3_2B_27_D_AD104_05
09.06.2014. 2 5 76 Building 27 Details Facade detail with partial detail of staircase ST2 - Detalj fasade sa parcijalnim detaljem stepeništa ST2 1:20/… AD105-27 582_CCN3_2B_27_D_AD105_05
09.06.2014. 2 5 77 Building 27 Details Detail of connection between staircase ST4 and building 27 - Detalj veze stepeništa ST4 i objekta 27 1:20/… AD106-27 582_CCN3_2B_27_D_AD106_05
09.06.2014. 2 5 78 Building 27 Details Construction detail Roof - Detalj krova 1:20/… AD107-27 582_CCN3_2B_27_D_AD107_05
DOCUMENT LIST
STAGE III: Design and Tender documents
Phase 2: Detailed Design and Tender Documents
Step A : Final Detailed Design Proposal
CLINICAL CENTER OF NIŠ - CCN
Niš

Date of Document
Volume Book Section Doc. No. Blg. Type English Description Level Serbian Description Scale Name
File Name
submmision
70_AR - TYPICAL ROOM DETAILS /DETALJI TIPIČNIH PROSTORIJA
09.06.2014. 2 5 79 Building 27 Typical Room Details OR Theatre ISO5 / Part A - Operaciona sala ISO5/Deo A 1:20/… AR101-27 582_CCN3_2B_27_D_AR101_05
09.06.2014. 2 5 80 Building 27 Typical Room Details OR Theatre ISO7 /Part B - Operaciona sala ISO7/Deo B 1:20/… AR102-27 582_CCN3_2B_27_D_AR102_05
09.06.2014. 2 5 81 Building 27 Typical Room Details Anaestesia/Recovery - Anestezija/oporavak 1:20/… AR103-27 582_CCN3_2B_27_D_AR103_05
09.06.2014. 2 5 82 Building 27 Typical Room Details ICUs room/ Part A - JIN prostorija/Deo A 1:20/… AR104-27 582_CCN3_2B_27_D_AR104_05
09.06.2014. 2 5 83 Building 27 Typical Room Details Emergency Reception - Recepcija urgentnog centra 1:20/… AR105-27 582_CCN3_2B_27_D_AR105_05
09.06.2014. 2 5 84 Building 27 Typical Room Details Emergency waiting area - Čekaonica urgentnog centra 1:20/… AR106-27 582_CCN3_2B_27_D_AR106_05
09.06.2014. 2 5 85 Building 27 Typical Room Details Consulting, examination, treatment room - Soba za pregled, konstultacije i tretman 1:20/… AR107-27 582_CCN3_2B_27_D_AR107_05
09.06.2014. 2 5 86 Building 27 Typical Room Details Ultrasound room - Prostorija za ultrazvuk 1:20/… AR108-27 582_CCN3_2B_27_D_AR108_05
09.06.2014. 2 5 87 Building 27 Typical Room Details CT room - Soba za skener 1:20/… AR109-27 582_CCN3_2B_27_D_AR109_05
09.06.2014. 2 5 88 Building 27 Typical Room Details Front desk - Recepcioni pult u holu 1:20/… AR110-27 582_CCN3_2B_27_D_AR110_05
09.06.2014. 2 5 89 Building 27 Typical Room Details Nurse's Station Desk - Pult stanice za medicinske sestre 1:20/… AR111-27 582_CCN3_2B_27_D_AR111_05
80_DS - ALL SYSTEMS INTEGRATION SUSPENDED CEILINGS /SINHRON SPUŠTENIH PLAFONA
09.06.2014. 2 5 90 Building 27 Plan All system integration suspended ceiling Level -1 Spušteni plafoni-sinhron -Nivo -1 1:100 DS101-27 582_CCN3_2B_27_D_DS101_05
09.06.2014. 2 5 91 Building 27 Plan All system integration suspended ceiling Level ±0 Spušteni plafoni -sinhron-Nivo ±0 1:100 DS102-27 582_CCN3_2B_27_D_DS102_05
09.06.2014. 2 5 92 Building 27 Plan All system integration suspended ceiling Level +1 Spušteni plafoni -sinhron-Nivo +1 1:100 DS103-27 582_CCN3_2B_27_D_DS103_05
09.06.2014. 2 5 93 Building 27 Plan All system integration suspended ceiling Level +2 Spušteni plafoni-sinhron -Nivo +2 1:100 DS104-27 582_CCN3_2B_27_D_DS104_05
20_BUILDING 28A /OBJEKAT 28A
10_APT - PROJECT (PROPOSAL)+FINISHES / PROJEKAT I ZAVRŠNE OBRADE
09.06.2014. 2 6 1 Building 28A Site Plan Project Site plan - building 28A Roof level Projekat -Situacija - objekat 28A (osnova krova) 1:500 APT100-28A 582_CCN3_2B_28A_D_APT100_05
09.06.2014. 2 6 2 Building 28A Plan Project+Finishes Foundation level/Parts A and B Osnova temelja/Delovi A i B 1:50 APT110AB-28A 582_CCN3_2B_28A_D_APT110A_B_C_D_05
09.06.2014. 2 6 3 Building 28A Plan Project+Finishes Foundation level/Parts C and D Osnova temelja/Deo C i D 1:50 APT110CD-28A 582_CCN3_2B_28A_D_APT110A_B_C_D_05
09.06.2014. 2 6 4 Building 28A Plan Project+Finishes Level -1 Nivo -1 1:200 APT101-28A 582_CCN3_2B_28A_D_APT101_05
09.06.2014. 2 6 5 Building 28A Plan Project+Finishes Level -1 / Parts A and B Nivo -1/Deo A i B 1:50 APT101AB-28A 582_CCN3_2B_28A_D_APT101A_B_C_D_05
09.06.2014. 2 6 6 Building 28A Plan Project+Finishes Level - 1 / Parts C and D Nivo -1/Deo C i D 1:50 APT101CD-28A 582_CCN3_2B_28A_D_APT101A_B_C_D_05
09.06.2014. 2 6 7 Building 28A Plan Project+Finishes Level ±0 Nivo ±0 1:200 APT102-28A 582_CCN3_2B_28A_D_APT102_05
09.06.2014. 2 6 8 Building 28A Plan Project+Finishes Level ±0 / Parts A and B Nivo ±0/Deo A i B 1:50 APT102AB-28A 582_CCN3_2B_28A_D_APT102A_B_C_D_05
09.06.2014. 2 6 9 Building 28A Plan Project+Finishes Level ±0 / Parts C and D Nivo ±0/Deo C i D 1:50 APT102CD-28A 582_CCN3_2B_28A_D_APT102A_B_C_D_05
09.06.2014. 2 6 10 Building 28A Plan Project+Finishes Level +1 Nivo +1 1:200 APT103-28A 582_CCN3_2B_28A_D_APT103_05
09.06.2014. 2 6 11 Building 28A Plan Project+Finishes Level +1 / Parts A and B Nivo +1/Deo A i B 1:50 APT103AB-28A 582_CCN3_2B_28A_D_APT103A_B_C_D_05
09.06.2014. 2 6 12 Building 28A Plan Project+Finishes Level +1 / Parts C and D Nivo +1/Deo C i D 1:50 APT103CD-28A 582_CCN3_2B_28A_D_APT103A_B_C_D_05
09.06.2014. 2 6 13 Building 28A Plan Project+Finishes Level +2 Nivo +2 1:200 APT104-28A 582_CCN3_2B_28A_D_APT104_05
09.06.2014. 2 6 14 Building 28A Plan Project+Finishes Level +2 / Parts A and B Nivo +2/Deo A i B 1:50 APT104AB-28A 582_CCN3_2B_28A_D_APT104A_B_C_D_05
09.06.2014. 2 6 15 Building 28A Plan Project+Finishes Level + 2 / Parts C and D Nivo +2/Deo C i D 1:50 APT104CD-28A 582_CCN3_2B_28A_D_APT104A_B_C_D_05
09.06.2014. 2 6 16 Building 28A Plan Project+Finishes Level +3 Nivo +3 1:200 APT105-28A 582_CCN3_2B_28A_D_APT105_05
09.06.2014. 2 6 17 Building 28A Plan Project+Finishes Level +3 / Parts A and B Nivo +3/Deo A i B 1:50 APT105AB-28A 582_CCN3_2B_28A_D_APT105A_B_C_D_05
09.06.2014. 2 6 18 Building 28A Plan Project+Finishes Level +3 / Parts C and D Nivo +3/Deo C i D 1:50 APT105CD-28A 582_CCN3_2B_28A_D_APT105A_B_C_D_05
09.06.2014. 2 6 19 Building 28A Plan Project+Finishes Level +4 Nivo +4 1:200 APT106-28A 582_CCN3_2B_28A_D_APT106_05
09.06.2014. 2 6 20 Building 28A Plan Project+Finishes Level +4 / Parts A and B Nivo +4/Deo A i B 1:50 APT106AB-28A 582_CCN3_2B_28A_D_APT106A_B_C_D_05
09.06.2014. 2 6 21 Building 28A Plan Project+Finishes Level +4 / Parts C and D Nivo +4/Deo C i D 1:50 APT106CD-28A 582_CCN3_2B_28A_D_APT106A_B_C_D_05
09.06.2014. 2 6 22 Building 28A Plan Project+Finishes Level +5 Nivo +5 1:200 APT107-28A 582_CCN3_2B_28A_D_APT107_05
09.06.2014. 2 6 23 Building 28A Plan Project+Finishes Level +5 / Parts A and B Nivo +5/Deo A i B 1:50 APT107A-28A 582_CCN3_2B_28A_D_APT107A_B_C_D_05
09.06.2014. 2 6 24 Building 28A Plan Project+Finishes Level +5 / Parts C and D Nivo +5/Deo C i D 1:50 APT107C-28A 582_CCN3_2B_28A_D_APT107A_B_C_D_05
09.06.2014. 2 6 25 Building 28A Plan Project+Finishes Technical level Tehnički nivo 1:200 APT108-28A 582_CCN3_2B_28A_D_APT108_05
09.06.2014. 2 6 26 Building 28A Plan Project+Finishes Technical level/ Parts A and B Tehnički nivo /Deo A i B 1:50 APT108AB-28A 582_CCN3_2B_28A_D_APT108A_B_C_D_05
09.06.2014. 2 6 27 Building 28A Plan Project+Finishes Technical level/ Parts C and D Tehnički nivo /Deo C i D 1:50 APT108CD-28A 582_CCN3_2B_28A_D_APT108A_B_C_D_05
09.06.2014. 2 6 28 Building 28A Plan Project+Finishes Roof level / Parts A and B Osnova krova/Deo A i B 1:50 APT109AB-28A 582_CCN3_2B_28A_D_APT109A_B_C_D_05
09.06.2014. 2 6 29 Building 28A Plan Project+Finishes Roof level / Parts C and D Osnova krova/Deo C i D 1:50 APT109CD-28A 582_CCN3_2B_28A_D_APT109A_B_C_D_05
09.06.2014. 2 6 30 Building 28A Section Project+Finishes Section AA Presek AA 1:50 APT201-28A 582_CCN3_2B_28A_D_APT201_05
09.06.2014. 2 6 31 Building 28A Section Project+Finishes Section CC Presek CC 1:50 APT202-28A 582_CCN3_2B_28A_D_APT202_05
09.06.2014. 2 6 32 Building 28A Section Project+Finishes Section FF Presek FF 1:50 APT203-28A 582_CCN3_2B_28A_D_APT203_05
09.06.2014. 2 6 33 Building 28A Elevation Project+Finishes Elevation NE Severoistocna fasada 1:50 APT301-28A 582_CCN3_2B_28A_D_APT301_05
09.06.2014. 2 6 34 Building 28A Elevation Project+Finishes Elevation NW Severozapadna fasada 1:50 APT302-28A 582_CCN3_2B_28A_D_APT302_05
09.06.2014. 2 6 35 Building 28A Elevation Project+Finishes Elevation SE Jugoistocna fasada 1:50 APT303-28A 582_CCN3_2B_28A_D_APT303_05
09.06.2014. 2 6 36 Building 28A Elevation Project+Finishes Elevation SW Jugozapadna fasada 1:50 APT304-28A 582_CCN3_2B_28A_D_APT304_05
20_AT- TYPO PLANS / ZAVRŠNE OBRADE PLAFONA I PODOVA
09.06.2014. 2 7 37 Building 28A Typo plan Suspended ceiling Level -1 Spušteni plafoni -Nivo -1 1:200 AT109-28A 582_CCN3_2B_28A_D_AT109_05
09.06.2014. 2 7 38 Building 28A Typo plan Suspended ceiling Level ±0 Spušteni plafoni -Nivo ±0 1:200 AT110-28A 582_CCN3_2B_28A_D_AT110_05
09.06.2014. 2 7 39 Building 28A Typo plan Suspended ceiling Level +1 Spušteni plafoni -Nivo +1 1:200 AT111-28A 582_CCN3_2B_28A_D_AT111_05
09.06.2014. 2 7 40 Building 28A Typo plan Suspended ceiling Level +2 Spušteni plafoni -Nivo +2 1:200 AT112-28A 582_CCN3_2B_28A_D_AT112_05
09.06.2014. 2 7 41 Building 28A Typo plan Suspended ceiling Level +3 Spušteni plafoni -Nivo +3 1:200 AT113-28A 582_CCN3_2B_28A_D_AT113_05
09.06.2014. 2 7 42 Building 28A Typo plan Suspended ceiling Level +4 Spušteni plafoni -Nivo +4 1:200 AT114-28A 582_CCN3_2B_28A_D_AT114_05
09.06.2014. 2 7 43 Building 28A Typo plan Suspended ceiling Level +5 Spušteni plafoni -Nivo +5 1:200 AT115-28A 582_CCN3_2B_28A_D_AT115_05
09.06.2014. 2 7 44 Building 28A Typo plan Flooring Level -1 Završne obrade podova -Nivo -1 1:200 AT116-28A 582_CCN3_2B_28A_D_AT116_05
09.06.2014. 2 7 45 Building 28A Typo plan Flooring Level ±0 Završne obrade podova -Nivo ±0 1:200 AT117-28A 582_CCN3_2B_28A_D_AT117_05
09.06.2014. 2 7 46 Building 28A Typo plan Flooring Level +1 Završne obrade podova -Nivo +1 1:200 AT118-28A 582_CCN3_2B_28A_D_AT118_05
09.06.2014. 2 7 47 Building 28A Typo plan Flooring Level +2 Završne obrade podova -Nivo +2 1:200 AT119-28A 582_CCN3_2B_28A_D_AT119_05
09.06.2014. 2 7 48 Building 28A Typo plan Flooring Level +3 Završne obrade podova -Nivo +3 1:200 AT120-28A 582_CCN3_2B_28A_D_AT120_05
09.06.2014. 2 7 49 Building 28A Typo plan Flooring Level +4 Završne obrade podova -Nivo +4 1:200 AT121-28A 582_CCN3_2B_28A_D_AT121_05
09.06.2014. 2 7 50 Building 28A Typo plan Flooring Level +5 Završne obrade podova -Nivo +5 1:200 AT122-28A 582_CCN3_2B_28A_D_AT122_05
09.06.2014. 2 7 51 Building 28A Typo plan Flooring Technical level Završne obrade podova -Tehnički nivo 1:200 AT123-28A 582_CCN3_2B_28A_D_AT123_05
DOCUMENT LIST
STAGE III: Design and Tender documents
Phase 2: Detailed Design and Tender Documents
Step A : Final Detailed Design Proposal
CLINICAL CENTER OF NIŠ - CCN
Niš

Date of Document
Volume Book Section Doc. No. Blg. Type English Description Level Serbian Description Scale Name
File Name
submmision
30_AA - ABACUS / ŠEME
09.06.2014. 2 7 52 Building 28A Abacus Walls - Šeme zidova 1:20 AA101-28A 582_CCN3_2B_28A_D_AA101_05
09.06.2014. 2 7 53 Building 28A Abacus Floor slabs - Šeme međuspratnih tavanica 1:20 AA102-28A 582_CCN3_2B_28A_D_AA102_05
09.06.2014. 2 7 54 55 56 Building 28A Abacus Internal doors and windows - Šeme unutrašnje stolarije / vrata i prozori 1:20 AA103-28A 582_CCN3_2B_28A_D_AA103_05
09.06.2014. 2 7 57 58 59 Building 28A Abacus External doors and windows - Šeme spoljne stolarije / vrata i prozori 1:20 AA104-28A 582_CCN3_2B_28A_D_AA104_05
09.06.2014. 2 7 60 Building 28A Abacus Ceilings - Detalji spuštenih plafona 1:20 AA105-28A 582_CCN3_2B_28A_D_AA105_05
09.06.2014. 2 7 61 Building 28A Abacus Railings - Šeme bravarije 1:20 AA106-28A 582_CCN3_2B_28A_D_AA106_05
40_AD - CONSTRUCTION DETAILS / KONSTRUKTIVNI DETALJI
09.06.2014. 2 7 62 Building 28A Details Partial section-facade - Parcijalni presek kroz fasadu 1:20/… AD103-28A 582_CCN3_2B_28A_D_AD103_05
09.06.2014. 2 7 63 Building 28A Details Partial section-atrium facade - Parcijalni presek-fasada atrijuma 1:20/… AD104-28A 582_CCN3_2B_28A_D_AD104_05
09.06.2014. 2 7 64 Building 28A Details Corridor - Unutrašnja topla veza 1:20/… AD105-28A 582_CCN3_2B_28A_D_AD105_05
09.06.2014. 2 7 65 Building 28A Details Building 28A and corridor joint - Veza Objekta 28A i veznog objekta 1:20/… AD106-28A 582_CCN3_2B_28A_D_AD106_05
09.06.2014. 2 7 66 Building 28A Details Connecting object canopy - Nadstrešnica na veznom objektu 1:20/… AD107-28A 582_CCN3_2B_28A_D_AD107_05
09.06.2014. 2 7 67 Building 28A Details Main entrance-draught lobby - Glavni ulaz-vetrobran 1:20/… AD108-28A 582_CCN3_2B_28A_D_AD108_05
09.06.2014. 2 7 68 Building 28A Details Pedestrian bridges - Pasarele 1:20/… AD109-28A 582_CCN3_2B_28A_D_AD109_05
50_AR - TYPICAL ROOM DETAILS / DETALJI TIPIČNIH PROSTORIJA
09.06.2014. 2 7 73 Building 28A Typical Room Details Isolation single bedroom - Soba za izolaciju jednokrevetna 1:20 AR101-28A 582_CCN3_2B_28A_D_AR101_05
09.06.2014. 2 7 74 Building 28A Typical Room Details Double bedroom (ward unit) - Dvokrevetna soba (jedinica) 1:20 AR102-28A 582_CCN3_2B_28A_D_AR102_05
09.06.2014. 2 7 75 Building 28A Typical Room Details Multi-bedroom: HDU - Višekrevetna soba poluintenzivna nega 1:20 AR103-28A 582_CCN3_2B_28A_D_AR103_05
09.06.2014. 2 7 76 Building 28A Typical Room Details Staff restroom - Soba za odmor osoblja 1:20 AR104-28A 582_CCN3_2B_28A_D_AR104_05
09.06.2014. 2 7 77 Building 28A Typical Room Details Wc: patient (ensuite) - WC za pacijente 1:20 AR105-28A 582_CCN3_2B_28A_D_AR105_05
09.06.2014. 2 7 78 Building 28A Typical Room Details Examination/treatment room - Soba za pregled 1:20 AR106-28A 582_CCN3_2B_28A_D_AR106_05
09.06.2014. 2 7 79 Building 28A Typical Room Details ICUs room/ Part B/PLAN - JIN prostorija/Deo B/OSNOVA 1:20 AR107-28A 582_CCN3_2B_28A_D_AR107_05
ICUs room/ Part B/SUSPENDED CEILINGS
09.06.2014. 2 7 79A Building 28A Typical Room Details - JIN prostorija/Deo B/SPUŠTENI PLAFONI 1:20 AR107-28A 582_CCN3_2B_28A_D_AR107_05

09.06.2014. 2 7 79B Building 28A Typical Room Details ICUs room/ Part B/ELEVATIONS - JIN prostorija/Deo B/IZGLEDI 1:20 AR107-28A 582_CCN3_2B_28A_D_AR107_05
09.06.2014. 2 7 80 Building 28A Typical Room Details Assisted bathroom - Kupatilo za hendikepirane 1:20 AR108-28A 582_CCN3_2B_28A_D_AR108_05
09.06.2014. 2 7 81 Building 28A Details Main hall - Cafeteria - Glavni hol-kafeterija 1:20 AR109A-28A 582_CCN3_2B_28A_D_AR109_05
09.06.2014. 2 7 81A Building 28A Details Main hall - Cafeteria/SUSPENDED CEILINGS PLAN - Glavni hol-kafeterija/OSNOVA SPUŠTENIH PLAFONA 1:20 AR109B-28A 582_CCN3_2B_28A_D_AR109_05
09.06.2014. 2 7 82 Building 28A Details Nurse's Station - Stanica za medicinske sestre 1:20 AR110-28A 582_CCN3_2B_28A_D_AR110_05
09.06.2014. 2 7 83 Building 28A Details Front desk - Recepcioni pult u holu 1:20 AR111-28A 582_CCN3_2B_28A_D_AR111_05
09.06.2014. 2 7 84 Building 28A Details Nurse's Station Desk - Pult stanice za medicinske sestre 1:20 AR112-28A 582_CCN3_2B_28A_D_AR112_05
60_DS - ALL SYSTEMS INTEGRATION SUSPENDED CEILINGS / SINHRON SPUŠTENIH PLAFONA
09.06.2014. 2 7 85 Building 28A Plan All system integration suspended ceiling Level -1 Spušteni plafoni-sinhron -Nivo -1 1:100 DS101-28A 582_CCN3_2B_28A_D_DS101_05
09.06.2014. 2 7 86 Building 28A Plan All system integration suspended ceiling Level ±0 Spušteni plafoni -sinhron-Nivo ±0 1:100 DS102-28A 582_CCN3_2B_28A_D_DS102_05
09.06.2014. 2 7 87 Building 28A Plan All system integration suspended ceiling Level +1 Spušteni plafoni -sinhron-Nivo +1 1:100 DS103-28A 582_CCN3_2B_28A_D_DS103_05
09.06.2014. 2 7 88 Building 28A Plan All system integration suspended ceiling Level +2 Spušteni plafoni-sinhron -Nivo +2 1:100 DS104-28A 582_CCN3_2B_28A_D_DS104_05
09.06.2014. 2 7 89 Building 28A Plan All system integration suspended ceiling Level +3 Spušteni plafoni-sinhron -Nivo +3 1:100 DS105-28A 582_CCN3_2B_28A_D_DS105_05
09.06.2014. 2 7 90 Building 28A Plan All system integration suspended ceiling Level +4 Spušteni plafoni-sinhron -Nivo +4 1:100 DS106-28A 582_CCN3_2B_28A_D_DS106_05
09.06.2014. 2 7 91 Building 28A Plan All system integration suspended ceiling Level +5 Spušteni plafoni-sinhron -Nivo +5 1:100 DS107-28A 582_CCN3_2B_28A_D_DS107_05
30_TECHNICAL BUILDING T1 / TEHNIČKI BLOK T1
10_AG - ARCHITECTURAL GENERAL DRAWINGS AND REPORTS / OPŠTA DOKUMENTACIJA ARHITEKTONSKOG DELA PROJEKTA
General documentation: Company registration, Decisions on Opšta dokumentacija: Registracija firme, Rešenje o imenovanju
09.06.2014. 2 8 General Document Document appointment of responsible designers, Licences of responsible - odgovornih projektanata, Licence odgovornih projektanata, Izjava o - - -
designers, Statement of syncronization of design, etc. usaglašenosti projektne dokumentacije, itd.
AG001_T1
09.06.2014. 2 8 General Document Document Design Brief ffor technical building T1 - Projektni zadatak za tehnički objekat T1 - ccn_terms of reference 27&28A&T1&T2_2013_04_15

AG002-T1 582_CCN3_2B_T1_R_AG002_05_eng
09.06.2014. 2 8 General Document Report Technical report for technical building T1 - Tehnicki opis za tehnički objekat T1 -
582_CCN3_2B_T1_R_AG002_05_srp
AG003-T1
09.06.2014. 2 8 General Document Report Summary of areas for technical building T1 - Rekapitulacija povrsina za tehnički objekat T1 - 582_CCN3_2B_T1_R_AG003_05

AG004-T1 582_CCN3_2B_T1 & T2_R_AG004_05_eng


09.06.2014. 2 8 General Document Report General conditions for developing for technical building T1 - Opsti uslovi za izvodjenje radova za tehnički objekat T1 -
582_CCN3_2B_T1 & T2_R_AG004_05_srp
AG005-T1 582_CCN3_2B_T1_R_AG005 _05_eng
09.06.2014. 2 8 General Document Report Report on safety at work for technical building T1 - Prilog o zaštiti na radu za tehnički objekat T1 -
582_CCN3_2B_T1_R_AG005 _05_srp
2 30_AG - ARCHITECTURAL BILL OF QUANTITIES /PREDMER I PREDRAČUN RADOVA
09.06.2014. 2 8 General Document Report Bill of Quantities for technical building T1 - Predmer i predračun radova za tehnički objekat T1 - AG006-T1 582_CCN3_2B_T1_R_AG006_05
DOCUMENT LIST
STAGE III: Design and Tender documents
Phase 2: Detailed Design and Tender Documents
Step A : Final Detailed Design Proposal
CLINICAL CENTER OF NIŠ - CCN
Niš

Date of Document
Volume Book Section Doc. No. Blg. Type English Description Level Serbian Description Scale Name
File Name
submmision
30_AB - ATP PROJECT (PROPOSAL)+FINISHES / PROJEKAT I ZAVRŠNE OBRADE
09.06.2014. 2 8 1 Technical block T1 Plan Project+Finishes Site plan Situacija 1:500 AB101-T1 582_CCN3_2B_T1_D_AB101_05
09.06.2014. 2 8 2 Technical block T1 Plan Project+Finishes Foundation plan Osnova temelja 1:50 AB101A-T1 582_CCN3_2B_T1_D_AB101A_05
09.06.2014. 2 8 3 Technical block T1 Plan Project+Finishes Level 0 Osnova prizemlja 1:50 AB101B-T1 582_CCN3_2B_T1_D_AB101B_05
09.06.2014. 2 8 4 Technical block T1 Plan Project+Finishes Roof level Osnova krova 1:50 AB101C-T1 582_CCN3_2B_T1_D_AB101C_05
09.06.2014. 2 8 5 Technical block T1 Section Project+Finishes Cross section 1-1 Poprečni presek 1-1 1:50 AB201A-T1 582_CCN3_2B_T1_D_AB201A_05
09.06.2014. 2 8 6 Technical block T1 Section Project+Finishes Cross section 2-2 Poprečni presek 2-2 1:50 AB201B-T1 582_CCN3_2B_T1_D_AB201B_05
09.06.2014. 2 8 7 Technical block T1 Section Project+Finishes Cross section 3-3 Poprečni presek 3-3 1:50 AB201C-T1 582_CCN3_2B_T1_D_AB201C_05
09.06.2014. 2 8 8 Technical block T1 Section Project+Finishes Cross section 4-4 Poprečni presek 4-4 1:50 AB201D-T1 582_CCN3_2B_T1_D_AB201D_05
09.06.2014. 2 8 9 Technical block T1 Section Project+Finishes Cross section 5-5 Poprečni presek 5-5 1:50 AB201E-T1 582_CCN3_2B_T1_D_AB201E_05
09.06.2014. 2 8 10 Technical block T1 Section Project+Finishes Longitudinal section 6-6 Podužni presek 6-6 1:50 AB201F-T1 582_CCN3_2B_T1_D_AB201F_05
09.06.2014. 2 8 11 Technical block T1 Section Project+Finishes Longitudinal section 7-7 Podužni presek 7-7 1:50 AB201G-T1 582_CCN3_2B_T1_D_AB201G_05
09.06.2014. 2 8 12 Technical block T1 Elevation Project+Finishes Southwest Elevation Jugozapadni izgled 1:50 AB301A-T1 582_CCN3_2B_T1_D_AB301A_05
09.06.2014. 2 8 13 Technical block T1 Elevation Project+Finishes Northeast Elevation Severoistočni izgled 1:50 AB301B-T1 582_CCN3_2B_T1_D_AB301B_05
09.06.2014. 2 8 14 Technical block T1 Elevation Project+Finishes Southeast Elevation Jugoistočni izgled 1:50 AB301C-T1 582_CCN3_2B_T1_D_AB301C_05
09.06.2014. 2 8 15 Technical block T1 Elevation Project+Finishes Northwest Elevation Severozapadni izgled 1:50 AB301D-T1 582_CCN3_2B_T1_D_AB301D_05
Schedules - doors, windows,
09.06.2014. 2 8 16 Technical block T1 Schedules Doors, Windows, Railings etc. Šeme stolarije i bravarije 1:25 AB400-T1 582_CCN3_2B_T1_AB400_05
railings
40_TECHNICAL BUILDING T2 /TEHNIČKI BLOK T2
10_AG - ARCHITECTURAL GENERAL DRAWINGS AND REPORTS
General documentation: Company registration, Decisions on Opšta dokumentacija: Registracija firme, Rešenje o imenovanju
09.06.2014. 2 9 General Document Document appointment of responsible designers, Licences of responsible - odgovornih projektanata, Licence odgovornih projektanata, Izjava o - - -
designers, Statement of syncronization of design, etc. usaglašenosti projektne dokumentacije, itd.
AG001_T2
09.06.2014. 2 9 General Document Document Design Brief ffor technical building T2 - Projektni zadatak za tehnički objekat T2 - ccn_terms of reference 27&28A&T1&T2_2013_04_15

AG002-T2 582_CCN3_2B_T2_R_AG002_05_eng
09.06.2014. 2 9 General Document Report Technical report for technical building T2 - Tehnicki opis za tehnički objekat T2 -
582_CCN3_2B_T2_R_AG002_05_srp
AG003-T2
09.06.2014. 2 9 General Document Report Summary of areas for technical building T2 - Rekapitulacija povrsina za tehnički objekat T2 - 582_CCN3_2B_T2_R_AG003_05

AG004-T2 582_CCN3_2B_T1 & T2_R_AG004_05_eng


09.06.2014. 2 9 General Document Report General conditions for developing for technical building T2 - Opsti uslovi za izvodjenje radova za tehnički objekat T2 -
582_CCN3_2B_T1 & T2_R_AG004_05_srp
AG005-T2 582_CCN3_2B_T2_R_AG005 _05_eng
09.06.2014. 2 9 General Document Report Report on safety at work for technical building T2 - Prilog o zaštiti na radu za tehnički objekat T2 -
582_CCN3_2B_T2_R_AG005 _05_srp

30_AG - ARCHITECTURAL BILL OF QUANTITIES


09.06.2014. 2 9 General Document Report Bill of Quantities for technical building T2 - Predmer i predračun radova za tehnički objekat T2 - AG006-T2 582_CCN3_2B_T2_R_AG006_05

30_AB - ATP PROJECT (PROPOSAL)+FINISHES


09.06.2014. 2 9 1 Technical block T2 Plan Project+Finishes Site plan Situacija 1:200 AB102-T2 582_CCN3_2B_T2_D_AB102_05
09.06.2014. 2 9 2 Technical block T2 Plan Project+Finishes Foundation plan Osnova temelja 1:50 AB102A-T2 582_CCN3_2B_T2_D_AB102A_05
09.06.2014. 2 9 3 Technical block T2 Plan Project+Finishes Level 0 Osnova prizemlja 1:50 AB102B-T2 582_CCN3_2B_T2_D_AB102B_05
09.06.2014. 2 9 4 Technical block T2 Plan Project+Finishes Roof level Osnova krova 1:50 AB102C-T2 582_CCN3_2B_T2_D_AB102C_05
09.06.2014. 2 9 5 Technical block T2 Section Project+Finishes Cross section 1-1 Poprečni presek 1-1 1:50 AB202A-T2 582_CCN3_2B_T2_D_AB202A_05
09.06.2014. 2 9 6 Technical block T2 Section Project+Finishes Longitudinal section 2-2 Podužni presek 2-2 1:50 AB202B-T2 582_CCN3_2B_T2_D_AB202B_05
09.06.2014. 2 9 7 Technical block T2 Section Project+Finishes Longitudinal section 3-3 Podužni presek 3-3 1:50 AB202C-T2 582_CCN3_2B_T2_D_AB202C_05
09.06.2014. 2 9 8 Technical block T2 Elevation Project+Finishes Elevation Jugoistočni izgled 1:50 AB302A-T2 582_CCN3_2B_T2_D_AB302A_05
09.06.2014. 2 9 9 Technical block T2 Elevation Project+Finishes Elevation Severoistočni izgled 1:50 AB302B-T2 582_CCN3_2B_T2_D_AB302B_05
09.06.2014. 2 9 10 Technical block T2 Elevation Project+Finishes Elevation Severozapadni izgled 1:50 AB302C-T2 582_CCN3_2B_T2_D_AB302C_05
09.06.2014. 2 9 11 Technical block T2 Elevation Project+Finishes Elevation Jugozapadni izgled 1:50 AB302D-T2 582_CCN3_2B_T2_D_AB302D_05
Schedules - doors, windows,
09.06.2014. 2 9 12 Technical block T2 Schedules Doors, Windows, Railings etc. Šeme stolarije i bravarije 1:25 AB400-T2 582_CCN3_2B_T2_AB402_05
railings
DOCUMENT LIST STAGE III:
Design and Tender documents Phase 2: Detailed
Design and Tender Documents Step B : Final Detailed
Design CLINICAL CENTER OF NIS - CCN Nis

Spec Chap ID Rev Building Document Type Description Serbian Description Level Scale FILE NAME File type

3_S - STRUCTURAL AND CIVIL WORKS


1_BUILDING 27 (27)
10_SG - STRUCTURAL GENERAL DRAWINGS AND REPORTS
S G 001-27 00 Building 27 Report General Documents Opšta dokumenta - 582_CCN3_2B_27_R_SG001_00 .pdf
S G 002-27 00 Building 27 Report Brief of structural design Projektni zadatak - 582_CCN3_2B_27_R_SG002_00 .pdf
S G 003-27 02 Building 27 Report Technical report Tehnički opis - 582_CCN3_2B_27_R_SG003_02 .pdf
S G 004-27 01 Building 27 Report Tehnical conditions Tehnički uslovi - 582_CCN3_2B_27_R_SG004_01 .pdf
S G 005-27 02 Building 27 Report Structural analysis - part 1. Statički proračun - deo 1. - 582_CCN3_2B_27_R_SG005_02 .pdf

11_SG - STRUCTURAL GENERAL DRAWINGS AND REPORTS


S G 005-27 02 Building 27 Report Structural analysis - part 2. Statički proračun -deo 2. - 582_CCN3_2B_27_R_SG005_02 .pdf
S G 101-27 03 Building 27 Plan Structural disposition (POS-100) Plan pozicija (POS-100) Foundation level 1:200 582_CCN3_2B_27_D_SG101_03 .dwg
S G 102-27 02 Building 27 Plan Structural disposition (POS 0) Plan pozicija (POS 0) Level ±0 1:200 582_CCN3_2B_27_D_SG102_02 .dwg
S G 103-27 02 Building 27 Plan Structural disposition (POS 100) Plan pozicija (POS 100) Level +1 1:200 582_CCN3_2B_27_D_SG103_02 .dwg
S G 104-27 02 Building 27 Plan Structural disposition (POS 200) Plan pozicija (POS 200) Level +2 1:200 582_CCN3_2B_27_D_SG104_02 .dwg
S G 105-27 04 Building 27 Plan Structural disposition (POS 300) Plan pozicija (POS 300) Roof level 1:200 582_CCN3_2B_27_D_SG105_04 .dwg
S G 201-27 01 Building 27 Section Structural section Presek A-A Section AA 1:200 582_CCN3_2B_27_D_SG201_01 .dwg
S G 202-27 01 Building 27 Section Structural section Presek B-B Section BB 1:200 582_CCN3_2B_27_D_SG202_01 .dwg
20_SF - STRUCTURAL FORMWORKS-PLAN POSITION
S F 100-27 01 Building 27 Plan Genaral layout Situacija Level 0 1:1000 582_CCN3_2B_27_D_SF100_01 .dwg
S F 200-27 02 Building 27 Plan Concrete structure-Formwork-Foundation Oplata temelja Foundation level 1:200 582_CCN3_2B_27_D_SF200_02 .dwg
S F 201-27 01 Building 27 Plan Concrete structure-Formwork-Walls (POS ZAM, ZA22, ZA24, ZAL) Oplata zidova (POS ZAM, ZA22, ZA24, ZAL) Level -1 / Roof level 1:50 582_CCN3_2B_27_D_SF201_01 .dwg
S F 202-27 01 Building 27 Plan Concrete structure-Formwork-Walls (POS ZBP, ZB22, ZB22') Oplata zidova (POS ZBP, ZB22, ZB22') Level -1 / Roof level 1:50 582_CCN3_2B_27_D_SF202_01 .dwg
S F 203-27 01 Building 27 Plan Concrete structure-Formwork-Walls (POS ZB29, ZB29', ZBS, ZBV) Oplata zidova (POS ZB29, ZB29', ZBS, ZBV) Level -1 / Roof level 1:50 582_CCN3_2B_27_D_SF203_01 .dwg
S F 204-27 01 Building 27 Plan Concrete structure-Formwork-Walls (ZL10a, ZL10b, ZL10c, ZL10d) Oplata zidova (ZL10a, ZL10b, ZL10c, ZL10d) Level -1 / Roof level 1:50 582_CCN3_2B_27_D_SF204_01 .dwg
S F 205-27 01 Building 27 Plan Concrete structure-Formwork-Walls (ZL11a, ZL11b, ZL11c, ZL11d) Oplata zidova (ZL11a, ZL11b, ZL11c, ZL11d) Level -1 / Level +2 1:50 582_CCN3_2B_27_D_SF205_01 .dwg
S F 206-27 01 Building 27 Plan Concrete structure-Formwork-Walls (ZL12a, ZL12b, ZL12c, ZL12d) Oplata zidova (ZL12a, ZL12b, ZL12c, ZL12d) Level -1 / Roof level 1:50 582_CCN3_2B_27_D_SF206_01 .dwg
S F 207-27 01 Building 27 Plan Concrete structure-Formwork-Walls (ZL13a, ZL13b, ZL13c, ZL13d) Oplata zidova (ZL13a, ZL13b, ZL13c, ZL13d) Level -1 / Roof level 1:50 582_CCN3_2B_27_D_SF207_01 .dwg
S F 208-27 01 Building 27 Plan Concrete structure-Formwork-Walls (ZL15a, ZL15b, ZL15c, ZL15d) Oplata zidova (ZL15a, ZL15b, ZL15c, ZL15d) Level -1 / Roof level 1:50 582_CCN3_2B_27_D_SF208_01 .dwg
S F 301-27 00 Building 27 Plan Concrete structure-Formwork-Staircase (POS ST 2) Oplata stepeništa (POS ST 2) Level -1 / Level ±0 1:50 582_CCN3_2B_27_D_SF301_00 .dwg
S F 302-27 01 Building 27 Plan Concrete structure-Formwork-Staircase (POS ST 3) Oplata stepeništa (POS ST 3) Level -1 / Level +1 1:50 582_CCN3_2B_27_D_SF302_01 .dwg
S F 303-27 01 Building 27 Plan Concrete structure-Formwork-Staircase (POS ST 4) Oplata stepeništa (POS ST 4) Level -1 / Level +2 1:50 582_CCN3_2B_27_D_SF303_01 .dwg
S F 401-27 00 Building 27 Plan Concrete structure-Formwork- Footbridge and pedestrian ramp Oplata pešačkog mosta i pešačke rampe Level ±0 1:50 582_CCN3_2B_27_D_SF401_00 .dwg
30_SR - STRUCTURAL REINFORCEMENT
S R 101-27 01 Building 27 Plan Concrete structure-Reinforcement plan - strengthening the foundations (POS-100) Plan armature ojačanja temelja Foundation level 1:50 582_CCN3_2B_27_D_SR101_01 .dwg
S R 201-27 01 Building 27 Plan Concrete structure-Reinforcement-Walls (ZL10a, ZL10b, ZL10c, ZL10d) Armatura zidova (ZL10a, ZL10b, ZL10c, ZL10d) Level -1 / Roof level 1:50 582_CCN3_2B_27_D_SR201_01 .dwg
S R 202-27 01 Building 27 Plan Concrete structure-Reinforcement-Walls (ZL11a, ZL11b, ZL11c, ZL11d) Armatura zidova (ZL11a, ZL11b, ZL11c, ZL11d) Level -1 / Level +2 1:50 582_CCN3_2B_27_D_SR202_01 .dwg
S R 203-27 01 Building 27 Plan Concrete structure-Reinforcement-Walls (ZL12a, ZL12b, ZL12c, ZL12d) Armatura zidova (ZL12a, ZL12b, ZL12c, ZL12d) Level -1 / Roof level 1:50 582_CCN3_2B_27_D_SR203_01 .dwg
S R 204-27 01 Building 27 Plan Concrete structure-Reinforcement-Walls (ZL13a, ZL13b, ZL13c, ZL13d) Armatura zidova (ZL13a, ZL13b, ZL13c, ZL13d) Level -1 / Roof level 1:50 582_CCN3_2B_27_D_SR204_01 .dwg
S R 205-27 01 Building 27 Plan Concrete structure-Reinforcement-Walls (ZL15a, ZL15b, ZL15c, ZL15d) Armatura zidova (ZL15a, ZL15b, ZL15c, ZL15d) Level -1 / Roof level 1:50 582_CCN3_2B_27_D_SR205_01 .dwg
S R 206-27 01 Building 27 Plan Concrete structure-Reinforcement-Walls (ZA22, ZA24, ZAM) Armatura zidova (ZA22, ZA24, ZAM) Level -1 / Roof level 1:50 582_CCN3_2B_27_D_SR206_01 .dwg
S R 207-27 01 Building 27 Plan Concrete structure-Reinforcement-Walls (ZBP, ZB22, ZB22') Armatura zidova (ZBP, ZB22, ZB22') Level -1 / Roof level 1:50 582_CCN3_2B_27_D_SR207_01 .dwg
S R 208-27 01 Building 27 Plan Concrete structure-Reinforcement-Walls (ZB29', ZBS, ZBV) Armatura zidova (ZB29', ZBS, ZBV) Level -1 / Roof level 1:50 582_CCN3_2B_27_D_SR208_01 .dwg
S R 209-27 02 Building 27 Plan Concrete structure-Reinforcement-Walls (ZAL, ZB29, ZBW1, ZBW2) Armatura zidova (ZAL, ZB29, ZBW1, ZBW2) Level -1 / Roof level 1:50 582_CCN3_2B_27_D_SR209_02 .dwg
S R 301-27 00 Building 27 Plan Concrete structure-Reinforcement-Staircase (POS ST 2) Armatura stepeništa (POS ST 2) Level -1 / Level ±0 1:50 582_CCN3_2B_27_D_SR301_00 .dwg
S R 302-27 01 Building 27 Plan Concrete structure-Reinforcement-Staircase (POS ST 3) Armatura stepeništa (POS ST 3) Level -1 / Level +1 1:50 582_CCN3_2B_27_D_SR302_01 .dwg
S R 303-27 01 Building 27 Plan Concrete structure-Reinforcement-Staircase (POS ST 4) Armatura stepeništa (POS ST 4) Level -1 / Level +2 1:50 582_CCN3_2B_27_D_SR303_01 .dwg
S R 401-27 00 Building 27 Plan Concrete structure-Reinforcement- Footbridge and pedestrian ramp Armatura pešačkog mosta i pešačke rampe Level ±0 1:50 582_CCN3_2B_27_D_SR401_00 .dwg
S R 501-27 03 Building 27 Text Concrete structure-Slabs-Reinforcement specifications & recapitulation Specifikacija armature - 582_CCN3_2B_27_R_SR501_03 .pdf

40_SS - STRUCTURAL STEEL CONSTRUCTION


S S 101-27 01 Building 27 Structural details Steel structure -Technical room and Steel bracing - Dispozition Čelična konstrukcija - Tehničke prostorije i Vertikalni spregovi- Dispozicija Level -1 to Roof level 1:50 582_CCN3_2B_27_D_SS101_01 .dwg
S S 102-27 00 Building 27 Structural details Steel structure -Technical room - Details Čelična konstrukcija - Tehničke prostorije - Detalji Level -1 to Roof level 1:10 582_CCN3_2B_27_D_SS102_00 .dwg
S S 103-27 02 Building 27 Structural details Steel structure -Closing of openings - Dispozition (POS 0) Čelična konstrukcija - Zatvaranje otvora - Dispozicija - POS 0 Level ±0 1:50 582_CCN3_2B_27_D_SS103_02 .dwg
S S 104-27 00 Building 27 Structural details Steel structure -Closing of openings - Details (POS 0) Čelična konstrukcija - Zatvaranje otvora - Detalji - POS 0 Level ±0 1:10 582_CCN3_2B_27_D_SS104_00 .dwg
S S 105-27 03 Building 27 Structural details Steel structure - Eaves - Dispozition - (POS N1) Čelična konstrukcija - Nadstrešnica POS N1 iznad POS 0 - Dispozicija Level ±0 1:50 582_CCN3_2B_27_D_SS105_03 .dwg
S S 106-27 01 Building 27 Structural details Steel structure - Eaves - Details - (POS N1) Čelična konstrukcija - Nadstrešnica POS N1 iznad POS 0 - Detalji Level ±0 1:10 582_CCN3_2B_27_D_SS106_01 .dwg
S S 107-27 00 Building 27 Structural details Steel structure -Closing of openings - Dispozition (POS 100) Čelična konstrukcija - Zatvaranje otvora - Dispozicija - POS 100 Level +1 1:50 582_CCN3_2B_27_D_SS107_00 .dwg
S S 108-27 00 Building 27 Structural details Steel structure -Closing of openings - Details (POS 100) Čelična konstrukcija - Zatvaranje otvora - Detalji - POS 100 Level +1 1:10 582_CCN3_2B_27_D_SS108_00 .dwg
S S 109-27 00 Building 27 Structural details Steel structure -Closing of openings - Dispozition (POS 200) Čelična konstrukcija - Zatvaranje otvora - Dispozicija - POS 200 Level +2 1:50 582_CCN3_2B_27_D_SS109_00 .dwg
S S 110-27 00 Building 27 Structural details Steel structure -Closing of openings - Details (POS 200) Čelična konstrukcija - Zatvaranje otvora - Detalji - POS 200 Level +2 1:10 582_CCN3_2B_27_D_SS110_00 .dwg
S S 111-27 02 Building 27 Structural details Steel structure -Closing of openings (POS 300) Čelična konstrukcija - Zatvaranje otvora POS 300 Roof level 1:50 582_CCN3_2B_27_D_SS111_02 .dwg
S S 112-27 00 Building 27 Structural details Steel structure -Steel roof for technical space AHU - Dispozition Čelična konstrukcija - Dispozicija krova tehničke etaže na POS 300 Roof level 1:75 582_CCN3_2B_27_D_SS112_00 .dwg
S S 113-27 00 Building 27 Structural details Steel structure -Steel roof for technical space AHU - Details 1 Čelična konstrukcija - Krov tehničke etaže na POS 300 - Detalji 1 Roof level 1:10 582_CCN3_2B_27_D_SS113_00 .dwg
S S 114-27 00 Building 27 Structural details Steel structure -Steel roof for technical space AHU - Details 2 Čelična konstrukcija - Krov tehničke etaže na POS 300 - Detalji 2 Roof level 1:10 582_CCN3_2B_27_D_SS114_00 .dwg
S S 115-27 00 Building 27 Structural details Steel structure -Steel roof for technical space AHU - Details 3 Čelična konstrukcija - Krov tehničke etaže na POS 300 - Detalji 3 Roof level 1:10 582_CCN3_2B_27_D_SS115_00 .dwg
S S 116-27 01 Building 27 Structural details Steel structure -Support for devices for ICU equipment Čelična konstrukcija - Nosači ICU opreme Level -1 to Roof level 1:50 582_CCN3_2B_27_D_SS116_01 .dwg
S S 117-27 00 Building 27 Structural details Steel structure -Facade for staircase ST3-Dispozition and sections Čelična konstrukcija -Fasada za stepenište ST3-Dispozicija I preseci Level -1 to Roof level 1:50 582_CCN3_2B_27_D_SS117_00 .dwg
S S 118-27 00 Building 27 Structural details Steel structure -Facade for staircase ST3-Details Čelična konstrukcija - Fasada za stepenište ST3 -Detalji Level -1 to Roof level 01:10 582_CCN3_2B_27_D_SS118_00 .dwg
S S 119-27 00 Building 27 Structural details Steel structure -Facade for staircase ST4-Dispozition and sections Čelična konstrukcija -Fasada za stepenište ST4-Dispozicija I preseci Level -1 to Roof level 1:50 582_CCN3_2B_27_D_SS119_00 .dwg
S S 120-27 00 Building 27 Structural details Steel structure -Facade for staircase ST4-Details Čelična konstrukcija - Fasada za stepenište ST4 -Detalji Level -1 to Roof level 01:10 582_CCN3_2B_27_D_SS120_00 .dwg
S S 201-27 03 Building 27 Text Steel specification & recapitulation Specifikacija i rekapitulacija čelika - 582_CCN3_2B_27_R_SS201_03 .pdf
DOCUMENT LIST STAGE III:
Design and Tender documents Phase 2: Detailed
Design and Tender Documents Step B : Final Detailed
Design CLINICAL CENTER OF NIS - CCN Nis

Spec Chap ID Rev Building Document Type Description Serbian Description Level Scale FILE NAME File type

2_BUILDING 28A (28A)


10_SG - STRUCTURAL GENERAL DRAWINGS AND REPORTS
S G 001-28A 00 Building 28A Report General Documents Opšta dokumenta - 582_CCN3_2B_28A_R_SG001_00 .pdf
S G 002-28A 00 Building 28A Report Brief of structural design Projektni zadatak - 582_CCN3_2B_28A_R_SG002_00 .pdf
S G 003-28A 00 Building 28A Report Technical report Tehnički opis - 582_CCN3_2B_28A_R_SG003_00 .pdf
S G 004-28A 00 Building 28A Report Tehnical conditions Tehnički uslovi - 582_CCN3_2B_28A_R_SG004_00 .pdf
S G 005-28A 00 Building 28A Report Structural analysis - pages 1-473 Statički proračun-strane 1-458 - 582_CCN3_2B_28A_R_SG005_00 .pdf
11_SG - STRUCTURAL GENERAL DRAWINGS AND REPORTS
S G 005-28A 00 Building 28A Report Structural analysis - pages 459-723 Statički proračun-strane 459-723 - 582_CCN3_2B_28A_R_SG005_00 .pdf
S G 101-28A 00 Building 28A Plan Structural disposition :POS 700 Plan pozicija :POS 700 Roof level 1:250 582_CCN3_2B_28A_D_SG101_00 .dwg
S G 102-28A 00 Building 28A Plan Structural disposition :POS 600 Plan pozicija :POS 600 Technical level 1:250 582_CCN3_2B_28A_D_SG102_00 .dwg
S G 103-28A 01 Building 28A Plan Structural disposition: POS 500 Plan pozicija: POS 500 Level +5 1:250 582_CCN3_2B_28A_D_SG103_01 .dwg
S G 104-28A 01 Building 28A Plan Structural disposition :POS 400 Plan pozicija :POS 400 Level +4 1:250 582_CCN3_2B_28A_D_SG104_01 .dwg
S G 105-28A 01 Building 28A Plan Structural disposition :POS 300 Plan pozicija :POS 300 Level +3 1:250 582_CCN3_2B_28A_D_SG105_01 .dwg
S G 106-28A 01 Building 28A Plan Structural disposition: POS 200 Plan pozicija: POS 200 Level +2 1:250 582_CCN3_2B_28A_D_SG106_01 .dwg
S G 107-28A 00 Building 28A Plan Structural disposition: POS 100 Plan pozicija: POS 100 Level +1 1:250 582_CCN3_2B_28A_D_SG107_00 .dwg
S G 108-28A 00 Building 28A Plan Structural disposition: POS 0 Plan pozicija: POS 0 Level ±0 1:250 582_CCN3_2B_28A_D_SG108_00 .dwg
S G 109-28A 00 Building 28A Plan Structural disposition: POS -100 Plan pozicija: POS -100 Foundation level (Level -1) 1:250 582_CCN3_2B_28A_D_SG109_00 .dwg
S G 201-28A 00 Building 28A Section Structural section Presek Section AA 1:250 582_CCN3_2B_28A_D_SG201_00 .dwg
S G 202-28A 00 Building 28A Section Structural section Presek Section BB 1:250 582_CCN3_2B_28A_D_SG202_00 .dwg
20_SF - STRUCTURAL FORMWORKS
S F 100-28A 01 Building 28A Plan Genaral layout Situacija Level 0 1:1000 582_CCN3_2B_28A_D_SF100_01 .dwg
S F 101-28A 02 Building 28A Plan Concrete structure-Slabs:POS -100 :FOUNDATION SLAB |FORMWORK Plan oplate POS -100 :TEMELJNA PLOČA Foundation level (Level -1) 1:100 582_CCN3_2B_28A_D_SF101_02 .dwg
S F 102-28A 00 Building 28A Plan Concrete structure-Slabs:POS 0 :FORMWORK Plan oplatePOS 0 Level ±0 1:100 582_CCN3_2B_28A_D_SF102_00 .dwg
S F 103-28A 01 Building 28A Plan Concrete structure-Slabs: POS 100 :FORMWORK Plan oplate POS 100 Level +1 1:100 582_CCN3_2B_28A_D_SF103_01 .dwg
S F 104-28A 01 Building 28A Plan Concrete structure-Slabs: POS 200 :FORMWORK Plan oplate POS 200 Level +2 1:100 582_CCN3_2B_28A_D_SF104_01 .dwg
S F 105-28A 01 Building 28A Plan Concrete structure-Slabs: POS 300 :FORMWORK Plan oplate POS 300 Level +3 1:100 582_CCN3_2B_28A_D_SF105_01 .dwg
S F 106-28A 01 Building 28A Plan Concrete structure-Slabs: POS 400 :FORMWORK Plan oplate POS 400 Level +4 1:100 582_CCN3_2B_28A_D_SF106_01 .dwg
S F 107-28A 01 Building 28A Plan Concrete structure-Slabs: POS 500 :FORMWORK Plan oplate POS 500 Level +5 1:100 582_CCN3_2B_28A_D_SF107_01 .dwg
S F 108-28A 01 Building 28A Plan Concrete structure-Slabs: POS 600 :FORMWORK Plan oplate POS 600 Technical level 1:100 582_CCN3_2B_28A_D_SF108_01 .dwg
S F 109-28A 00 Building 28A Plan Concrete structure-Slabs: POS 700 :FORMWORK Plan oplate POS 700 Roof l level 1:100 582_CCN3_2B_28A_D_SF109_00 .dwg
S F 110-28A 00 Building 28A Plan Concrete structure-Slabs: Connection building :FORMWORK Plan oplate ploča: Vezni deo Level -1/ Level +2 1:50 582_CCN3_2B_28A_D_SF110_00 .dwg
30_SL - STRUCTURAL SLAB REINFORCEMENT PART 1/4
S L 101A-28A 01 Building 28A Plan Concrete structure-Slabs: POS -100 :Reinforcement Bottom / Part A Plan armature ploče POS -100 :Donja zona / Deo A Foundation level (Level -1) 1:50 582_CCN3_2B_28A_D_SL101A_01 .dwg
S L 101A'-28A 00 Building 28A Plan Concrete structure-Slabs: POS -100 :Reinforcement Top / Part A Plan armature ploče POS -100 :Gornja zona / Deo A Foundation level (Level -1) 1:50 582_CCN3_2B_28A_D_SL101A'_00 .dwg
S L 101A''-28A 00 Building 28A Plan Concrete structure-Slabs: POS -100 :Beams Reinforcement /Part A Plan armature ploče POS -100 :Armatura greda / DeoA Foundation level (Level -1) 1:50 582_CCN3_2B_28A_D_SL101A''_00 .dwg
S L 101B-28A 01 Building 28A Plan Concrete structure-Slabs: POS -100 :Reinforcement Bottom / Part B Plan armature ploče POS -100 :Donja zona / Deo B Foundation level (Level -1) 1:50 582_CCN3_2B_28A_D_SL101B_01 .dwg
S L 101B'-28A 00 Building 28A Plan Concrete structure-Slabs: POS -100 :Reinforcement Top / Part B Plan armature ploče POS -100 :Gornja zona / Deo B Foundation level (Level -1) 1:50 582_CCN3_2B_28A_D_SL101B'_00 .dwg
S L 101B''-28A 01 Building 28A Plan Concrete structure-Slabs: POS -100 :Beams Reinforcement /Part B Plan armature ploče POS -100 :Armatura greda / DeoB Foundation level (Level -1) 1:50 582_CCN3_2B_28A_D_SL101B''_01 .dwg
S L 101B'''-28A 00 Building 28A Plan Concrete structure-Slabs: POS -100 :Beams Reinforcement /Connection Building Plan armature ploče POS -100 :Armatura greda / Vezna kuca Foundation level (Level -1) 1:51 582_CCN3_2B_28A_D_SL101B'''_00
S L 101C-28A 00 Building 28A Plan Concrete structure-Slabs: POS -100 :Reinforcement Bottom / Part C Plan armature ploče POS -100 :Donja zona / Deo C Foundation level (Level -1) 1:50 582_CCN3_2B_28A_D_SL101C_00 .dwg
S L 101C'-28A 00 Building 28A Plan Concrete structure-Slabs: POS -100 :Reinforcement Top / Part C Plan armature ploče POS -100 :Gornja zona / Deo C Foundation level (Level -1) 1:50 582_CCN3_2B_28A_D_SL101C'_00 .dwg
S L 101C''-28A 00 Building 28A Plan Concrete structure-Slabs: POS -100 :Beams Reinforcement /Part C Plan armature ploče POS -100 :Armatura greda / DeoC Foundation level (Level -1) 1:50 582_CCN3_2B_28A_D_SL101C''_00 .dwg
S L 101D-28A 00 Building 28A Plan Concrete structure-Slabs: POS -100 :Reinforcement Bottom / Part D Plan armature ploče POS -100 :Donja zona / Deo D Foundation level (Level -1) 1:50 582_CCN3_2B_28A_D_SL101D_00 .dwg
S L 101D'-28A 00 Building 28A Plan Concrete structure-Slabs: POS -100 :Reinforcement Top / Part D Plan armature ploče POS -100 :Gornja zona / Deo D Foundation level (Level -1) 1:50 582_CCN3_2B_28A_D_SL101D'_00 .dwg
S L 101D''-28A 00 Building 28A Plan Concrete structure-Slabs: POS -100 :Beams Reinforcement /Part D Plan armature ploče POS -100 :Armatura greda / DeoD Foundation level (Level -1) 1:50 582_CCN3_2B_28A_D_SL101D''_00 .dwg
S L 201-28A 02 Building 28A Text Concrete structure-Slabs-Reinforcement specifications- Slabs Section 30_SL Specifikacija armature -Ploče Sveska 30_SL - 582_CCN3_2B_28A_R_SL201_02 .pdf
31_SL - STRUCTURAL SLAB REINFORCEMENT PART 2/4
S L 102A-28A 00 Building 28A Plan Concrete structure-Slabs: POS 0 :Reinforcement Bottom / Part A Plan armature ploče POS 0 :Donja zona / Deo A Level ±0 1:50 582_CCN3_2B_28A_D_SL102A_00 .dwg
S L 102A-28A 00 Building 28A Plan Concrete structure-Slabs: POS 0 :Reinforcement Top / Part A Plan armature ploče POS 0 :Gornja zona / Deo A Level ±0 1:50 582_CCN3_2B_28A_D_SL102A'_00 .dwg
S L 102B-28A 00 Building 28A Plan Concrete structure-Slabs: POS 0 :Reinforcement Bottom / Part B Plan armature ploče POS 0 :Donja zona / Deo B Level ±0 1:50 582_CCN3_2B_28A_D_SL102B_00 .dwg
S L 102B'-28A 00 Building 28A Plan Concrete structure-Slabs: POS 0 :Reinforcement Top / Part B Plan armature ploče POS 0 :Gornja zona / Deo B Level ±0 1:50 582_CCN3_2B_28A_D_SL102B'_00 .dwg
S L 102C-28A 00 Building 28A Plan Concrete structure-Slabs: POS 0 :Reinforcement Bottom / Part C Plan armature ploče POS 0 :Donja zona / Deo C Level ±0 1:50 582_CCN3_2B_28A_D_SL102C_00 .dwg
S L 102C'-28A 00 Building 28A Plan Concrete structure-Slabs: POS 0 :Reinforcement Top / Part C Plan armature ploče POS 0 :Gornja zona / Deo C Level ±0 1:50 582_CCN3_2B_28A_D_SL102C'_00 .dwg
S L 102D-28A 00 Building 28A Plan Concrete structure-Slabs: POS 0 :Reinforcement Bottom / Part D Plan armature ploče POS 0 :Donja zona / Deo D Level ±0 1:50 582_CCN3_2B_28A_D_SL102D_00 .dwg
S L 102D'-28A 00 Building 28A Plan Concrete structure-Slabs: POS 0 :Reinforcement Top / Part D Plan armature ploče POS 0 :Gornja zona / Deo D Level ±0 1:50 582_CCN3_2B_28A_D_SL102D'_00 .dwg
S L 103A-28A 01 Building 28A Plan Concrete structure-Slabs: POS 100 :Reinforcement Bottom / Part A Plan armature ploče POS 100 :Donja zona / Deo A Level +1 1:50 582_CCN3_2B_28A_D_SL103A_01 .dwg
S L 103A'-28A 00 Building 28A Plan Concrete structure-Slabs: POS 100 :Reinforcement Top / Part A Plan armature ploče POS 100 :Gornja zona / Deo A Level +1 1:50 582_CCN3_2B_28A_D_SL103A'_00 .dwg
S L 103B-28A 00 Building 28A Plan Concrete structure-Slabs: POS 100 :Reinforcement Bottom / Part B Plan armature ploče POS 100 :Donja zona / Deo B Level +1 1:50 582_CCN3_2B_28A_D_SL103B_00 .dwg
S L 103B'-28A 00 Building 28A Plan Concrete structure-Slabs: POS 100 :Reinforcement Top / Part B Plan armature ploče POS 100 :Gornja zona / Deo B Level +1 1:50 582_CCN3_2B_28A_D_SL103B'_00 .dwg
S L 103C-28A 01 Building 28A Plan Concrete structure-Slabs: POS 100 :Reinforcement Bottom / Part C Plan armature ploče POS 100 :Donja zona / Deo C Level +1 1:50 582_CCN3_2B_28A_D_SL103C_01 .dwg
S L 103C'-28A 00 Building 28A Plan Concrete structure-Slabs: POS 100 :Reinforcement Top / Part C Plan armature ploče POS 100 :Gornja zona / Deo C Level +1 1:50 582_CCN3_2B_28A_D_SL103C'_00 .dwg
S L 103D-28A 00 Building 28A Plan Concrete structure-Slabs: POS 100 :Reinforcement Bottom / Part D Plan armature ploče POS 100 :Donja zona / Deo D Level +1 1:50 582_CCN3_2B_28A_D_SL103D_00 .dwg
S L 103D'-28A 00 Building 28A Plan Concrete structure-Slabs: POS 100 :Reinforcement Top / Part D Plan armature ploče POS 100 :Gornja zona / Deo D Level +1 1:50 582_CCN3_2B_28A_D_SL103D'_00 .dwg
S L 202-28A 01 Building 28A Text Concrete structure-Slabs-Reinforcement specifications- Slabs Section 31_SL Specifikacija armature -Ploče Sveska 31_SL - 582_CCN3_2B_28A_R_SL202_01 .pdf
DOCUMENT LIST STAGE III:
Design and Tender documents Phase 2: Detailed
Design and Tender Documents Step B : Final Detailed
Design CLINICAL CENTER OF NIS - CCN Nis

Spec Chap ID Rev Building Document Type Description Serbian Description Level Scale FILE NAME File type

32_SL - STRUCTURAL SLAB REINFORCEMENT PART 3/4


S L 104A-28A 01 Building 28A Plan Concrete structure-Slabs: POS 200 :Reinforcement Bottom / Part A Plan armature ploče POS 200 :Donja zona / Deo A Level +2 1:50 582_CCN3_2B_28A_D_SL104A_01 .dwg
S L 104A'-28A 00 Building 28A Plan Concrete structure-Slabs: POS 200 :Reinforcement Top / Part A Plan armature ploče POS 200 :Gornja zona / Deo A Level +2 1:50 582_CCN3_2B_28A_D_SL104A'_00 .dwg
S L 104B-28A 00 Building 28A Plan Concrete structure-Slabs: POS 200 :Reinforcement Bottom / Part B Plan armature ploče POS 200 :Donja zona / Deo B Level +2 1:50 582_CCN3_2B_28A_D_SL104B_00 .dwg
S L 104B'-28A 00 Building 28A Plan Concrete structure-Slabs: POS 200 :Reinforcement Top / Part B Plan armature ploče POS 200 :Gornja zona / Deo B Level +2 1:50 582_CCN3_2B_28A_D_SL104B'_00 .dwg
S L 104C-28A 01 Building 28A Plan Concrete structure-Slabs: POS 200 :Reinforcement Bottom / Part C Plan armature ploče POS 200 :Donja zona / Deo C Level +2 1:50 582_CCN3_2B_28A_D_SL104C_01 .dwg
S L 104C'-28A 00 Building 28A Plan Concrete structure-Slabs: POS 200 :Reinforcement Top / Part C Plan armature ploče POS 200 :Gornja zona / Deo C Level +2 1:50 582_CCN3_2B_28A_D_SL104C'_00 .dwg
S L 104D-28A 00 Building 28A Plan Concrete structure-Slabs: POS 200 :Reinforcement Bottom / Part D Plan armature ploče POS 200 :Donja zona / Deo D Level +2 1:50 582_CCN3_2B_28A_D_SL104D_00 .dwg
S L 104D'-28A 00 Building 28A Plan Concrete structure-Slabs: POS 200 :Reinforcement Top / Part D Plan armature ploče POS 200 :Gornja zona / Deo D Level +2 1:50 582_CCN3_2B_28A_D_SL104D'_00 .dwg
S L 105A-28A 01 Building 28A Plan Concrete structure-Slabs: TYPICAL FLOOR :Reinforcement Bottom / Part A Plan armature ploče TIPSKI SPRAT :Donja zona / Deo A Level +3 /Level +5 1:50 582_CCN3_2B_28A_D_SL105A_01 .dwg
S L 105A'-28A 01 Building 28A Plan Concrete structure-Slabs: TYPICAL FLOOR :Reinforcement Top / Part A Plan armature ploče TIPSKI SPRAT :Gornja zona / Deo A Level +3 /Level +5 1:50 582_CCN3_2B_28A_D_SL105A'_01 .dwg
S L 105B-28A 00 Building 28A Plan Concrete structure-Slabs: TYPICAL FLOOR :Reinforcement Bottom / Part B Plan armature ploče TIPSKI SPRAT :Donja zona / Deo B Level +3 /Level +5 1:50 582_CCN3_2B_28A_D_SL105B_00 .dwg
S L 105B'-28A 00 Building 28A Plan Concrete structure-Slabs: TYPICAL FLOOR :Reinforcement Top / Part B Plan armature ploče TIPSKI SPRAT :Gornja zona / Deo B Level +3 /Level +5 1:50 582_CCN3_2B_28A_D_SL105B'_00 .dwg
S L 105C-28A 01 Building 28A Plan Concrete structure-Slabs: TYPICAL FLOOR :Reinforcement Bottom / Part C Plan armature ploče TIPSKI SPRAT :Donja zona / Deo C Level +3 /Level +5 1:50 582_CCN3_2B_28A_D_SL105C_01 .dwg
S L 105C'-28A 00 Building 28A Plan Concrete structure-Slabs: TYPICAL FLOOR :Reinforcement Top / Part C Plan armature ploče TIPSKI SPRAT :Gornja zona / Deo C Level +3 /Level +5 1:50 582_CCN3_2B_28A_D_SL105C'_00 .dwg
S L 105D-28A 00 Building 28A Plan Concrete structure-Slabs: TYPICAL FLOOR :Reinforcement Bottom / Part D Plan armature ploče TIPSKI SPRAT :Donja zona / Deo D Level +3 /Level +5 1:50 582_CCN3_2B_28A_D_SL105D_00 .dwg
S L 105D'-28A 00 Building 28A Plan Concrete structure-Slabs: TYPICAL FLOOR :Reinforcement Top / Part D Plan armature ploče TIPSKI SPRAT :Gornja zona / Deo D Level +3 /Level +5 1:50 582_CCN3_2B_28A_D_SL105D'_00 .dwg
S L 203-28A 01 Building 28A Text Concrete structure-Slabs-Reinforcement specifications- Slabs Section 32_SL Specifikacija armature -Ploče Sveska 32-SL - 582_CCN3_2B_28A_R_SL203_01 .pdf

33_SL - STRUCTURAL SLAB REINFORCEMENT PART 4/4


S L 108A-28A 01 Building 28A Plan Concrete structure-Slabs: POS 600 :Reinforcement Bottom / Part A Plan armature ploče POS 600 :Donja zona / Deo A Technical level 1:50 582_CCN3_2B_28A_D_SL108A_01 .dwg
S L 108A'-28A 01 Building 28A Plan Concrete structure-Slabs: POS 600 :Reinforcement Top / Part A Plan armature ploče POS 600 :Gornja zona / Deo A Technical level 1:50 582_CCN3_2B_28A_D_SL108A'_01 .dwg
S L 108B-28A 00 Building 28A Plan Concrete structure-Slabs: POS 600 :Reinforcement Bottom / Part B Plan armature ploče POS 600 :Donja zona / Deo B Technical level 1:50 582_CCN3_2B_28A_D_SL108B_00 .dwg
S L 108B'-28A 00 Building 28A Plan Concrete structure-Slabs: POS 600 :Reinforcement Top / Part B Plan armature ploče POS 600 :Gornja zona / Deo B Technical level 1:50 582_CCN3_2B_28A_D_SL108B'_00 .dwg
S L 108C-28A 00 Building 28A Plan Concrete structure-Slabs: POS 600 :Reinforcement Bottom / Part C Plan armature ploče POS 600 :Donja zona / Deo C Technical level 1:50 582_CCN3_2B_28A_D_SL108C_00 .dwg
S L 108C'-28A 00 Building 28A Plan Concrete structure-Slabs: POS 600 :Reinforcement Top / Part C Plan armature ploče POS 600 :Gornja zona / Deo C Technical level 1:50 582_CCN3_2B_28A_D_SL108C'_00 .dwg
S L 108D-28A 00 Building 28A Plan Concrete structure-Slabs: POS 600 :Reinforcement Bottom / Part D Plan armature ploče POS 600 :Donja zona / Deo D Technical level 1:50 582_CCN3_2B_28A_D_SL108D_00 .dwg
S L 108D'-28A 00 Building 28A Plan Concrete structure-Slabs: POS 600 :Reinforcement Top / Part D Plan armature ploče POS 600 :Gornja zona / Deo D Technical level 1:50 582_CCN3_2B_28A_D_SL108D'_00 .dwg
S L 109A-28A 00 Building 28A Plan Concrete structure-Slabs: POS 700 :Reinforcement Bottom / Part A Plan armature ploče POS 700 :Donja zona / Deo A Roof level 1:50 582_CCN3_2B_28A_D_SL109A_00 .dwg
S L 109A'-28A 00 Building 28A Plan Concrete structure-Slabs: POS 700 :Reinforcement Top / Part A Plan armature ploče POS 700 :Gornja zona / Deo A Roof level 1:50 582_CCN3_2B_28A_D_SL109A'_00 .dwg
S L 110A-28A 00 Building 28A Plan Concrete structure-Slabs: Connection Building:Reinforcement Part A Plan armature ploča: Vezni deo:Armatura deo A Level-1/Level +2 1:50 582_CCN3_2B_28A_D_SL110A_00 .dwg
S L 110B-28A 00 Building 28A Plan Concrete structure-Slabs: Connection Building:Reinforcement Part B Plan armature ploče Vezni deo:Armatura deo B Level-1/Level +2 1:50 582_CCN3_2B_28A_D_SL110B_00 .dwg
S L 204-28A 00 Building 28A Text Concrete structure-Slabs-Reinforcement specifications- Slabs Section 33_SL Specifikacija armature -Ploče Svska 33_SL - 582_CCN3_2B_28A_R_SL204_00 .pdf
40_SC- STRUCTURAL COLUMNS REINFORCEMENT
S C 101-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns: SA10,SJ3 Plan armature stubova: SA10,SJ3 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC101_00 .dwg
S C 102-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns: SA13,SJ2 Plan armature stubova: SA13,SJ2 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC102_00 .dwg
S C 103-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns: SA2,SJ13 Plan armature stubova: SA2,SJ13 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC103_00 .dwg
S C 104-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns: SA3 Plan armature stubova: SA3 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC104_00 .dwg
S C 105-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns; SA4,SJ10 Plan armature stubova; SA4,SJ10 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC105_00 .dwg
S C 106-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns 6:SA5,SA8,SA9,SJ4,SJ7,SJ8,SJ9 Plan armature stubova:SA5,SA8,SA9,SJ4,SJ7,SJ8,SJ9 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC106_00 .dwg
S C 107-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns: SB2,SI2,SB13 i SI13 Plan armature stubova: SB2,SI2,SB13 i SI13 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC107_00 .dwg
S C 108-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns-; SB3,SB4,SB5,SB8,SB9,SC8, Plan armature stubova; SB3,SB4,SB5,SB8,SB9,SC8, Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC108_00 .dwg
SC9,SC10,SC13,SH7,SH8,SH9,SH10,SH13,SI3,SI4,SI7,SI82 SC9,SC10,SC13,SH7,SH8,SH9,SH10,SH13,SI3,SI4,SI7,SI82
S C 109-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns; SC1 i SH1 Plan armature stubova-tip 9; SC1 i SH1 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC109_00 .dwg
S C 110-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns; SC5,SH4 Plan armature stubova-tip 10; SC5,SH4 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC110_00 .dwg
S C 111-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns; SD10 i SG10 Plan armature stubova-tip 11; SD10 i SG10 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC111_00 .dwg
S C 112-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns: SD12,SG12 Plan armature stubova-tip 12: SD12,SG12 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC112_00 .dwg
S C 113-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns: SD13 i SG13 Plan armature stubova-tip 13: SD13 i SG13 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC113_00 .dwg
S C 114-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns: SD3 i SG3 Plan armature stubova-tip 14: SD3 i SG3 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC114_00 .dwg
S C 115-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns; SD4,SD5 i SG4 Plan armature stubova; SD4,SD5 i SG4 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC115_00 .dwg
S C 116-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns; SD6 i SG6 Plan armature stubova; SD6 i SG6 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC116_00 .dwg
S C 117-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns; SD9 i SG9 Plan armature stubova; SD9 i SG9 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC117_00 .dwg
S C 118-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns: SE12 i SF12 Plan armature stubova: SE12 i SF12 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC118_00 .dwg
S C 119-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns;SE2,SF2,SE4,SF4,SE5 i SF5 Plan armature stubova;SE2,SF2,SE4,SF4,SE5 i SF5 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC119_00 .dwg
S C 120-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns: SE9 i SF9 Plan armature stubova: SE9 i SF9 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC120_00 .dwg
S C 121-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns; SF8 Plan armature stubova; SF8 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC121_00 .dwg
S C 122-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns: SGF6 Plan armature stubova: SGF6 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC122_00 .dwg
S C 123-28A 00 Building 28A Details Concrete structure-Reinforcement- Columns; SGF7 Plan armature stubova; SGF7 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SC123_00 .dwg
S C 124-28A 01 Building 28A Details Concrete structure-Reinforcement- Columns-Connection Building Plan armature stubova-Vezni deo Level -1 / Level +2 1:50 582_CCN3_2B_28A_D_SC124_01 .dwg
S C 201-28A 01 Building 28A Text Concrete structure-Reinforcement specifications- Columns Specifikacija armature -Stubovi - 582_CCN3_2B_28A_R_SC201_01 .pdf
DOCUMENT LIST STAGE III:
Design and Tender documents Phase 2: Detailed
Design and Tender Documents Step B : Final Detailed
Design CLINICAL CENTER OF NIS - CCN Nis

Spec Chap ID Rev Building Document Type Description Serbian Description Level Scale FILE NAME File type

50_SW- WALLS REINFORCEMENT AND FORMWORKS PART 1/3


S W 101-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls ZD Plan oplate i armature zidova ZD Level -1 1:50 582_CCN3_2B_28A_D_SW101_00 .dwg
S W 102-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls ZG Plan oplate i armature zidova ZG Level -1 1:50 582_CCN3_2B_28A_D_SW102_00 .dwg
S W 103-28A 01 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls ZJa,Zjb, ZAa & ZAb Plan oplate i armature zidova ZJa,Zjb, ZAa i ZAb Level -1 1:50 582_CCN3_2B_28A_D_SW103_01 .dwg
S W 104-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls Z1a', ZG/F1, ZZ1-ZZ4 Plan oplate i armature zidova Z1a', ZG/F1, ZZ1-ZZ4 Level -1 1:50 582_CCN3_2B_28A_D_SW104_00 .dwg
S W 105-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls Z9 & Z12 Plan oplate i armature zidova Z9 & Z12 Level -1 1:50 582_CCN3_2B_28A_D_SW105_00 .dwg
S W 106-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls Z3,ZUz1&ZUz2 Plan oplate i armature zidova Z3,ZUz1&ZUz2 Level -1 1:50 582_CCN3_2B_28A_D_SW106_00 .dwg
S W 107-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls Z1b', ZE/F,Z1c & ZR1 Plan oplate i armature zidova Z1b', ZE/F,Z1c & ZR1 Level -1 1:50 582_CCN3_2B_28A_D_SW107_00 .dwg
S W 108-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls ZD Plan oplate i armature zidova ZD Level -1 / Roof level 1:50 582_CCN3_2B_28A_D_SW108_00 .dwg
S W 109-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls ZG Plan oplate i armature zidova ZG Level -1 / Roof level 1:50 582_CCN3_2B_28A_D_SW109_00 .dwg
S W 110-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls Z1a Plan oplate i armature zidova Z1a Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW110_00 .dwg
S W 111-28A 01 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls Z1b Plan oplate i armature zidova Z1b Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW111_01 .dwg
S W 112-28A 01 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls Z7a & ZF/G Plan oplate i armature zidova Z7a & ZF/G Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW112_01 .dwg
S W 113-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls Z6,ZE/D Plan oplate i armature zidova Z6,ZE/D Level -1 / Roof level 1:50 582_CCN3_2B_28A_D_SW113_00 .dwg
S W 114-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls ZC Plan oplate i armature zidova ZC Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW114_00 .dwg
S W 115-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls ZB Plan oplate i armature zidova ZB Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW115_00 .dwg
S W 116-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls ZH Plan oplate i armature zidova ZH Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW116_00 .dwg
S W 201-28A 02 Building 28A Text Concrete structure-Reinforcement specifications- Walls Section 50_SW Specifikacija armature -Zidovi Sveska 50_SW - 582_CCN3_2B_28A_R_SW201_02 .pdf
51_SW- WALLS REINFORCEMENT AND FORMWORKS PART 2/3
S W 117-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls ZI Plan oplate i armature zidova ZI Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW117_00 .dwg
S W 118-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls Z5a&Z5b Plan oplate i armature zidova Z5a&Z5b Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW118_00 .dwg
S W 119-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls Z7b,Z7c Plan oplate i armature zidova Z7b,Z7c Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW119_00 .dwg
S W 120-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls Z11a,Z11b Plan oplate i armature zidova Z11a,Z11b Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW120_00 .dwg
S W 121-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls Z11c,Z11d Plan oplate i armature zidova Z11c,Z11d Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW121_00 .dwg
S W 122-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls Z2a Plan oplate i armature zidova Z2a Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW122_00 .dwg
S W 123-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Walls Z2b Plan oplate i armature zidova Z2b Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW123_00 .dwg
S W 124-28A 01 Building 28A Details Concrete structure-Formwork- Walls/ Stairs 3 (JSt3) Plan oplate zidova/ Stepenište 3 (JSt3) Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW124_01 .dwg
S W 125-28A 01 Building 28A Details Concrete structure-Reinforcement- Walls/ Stairs 3 (JSt3) Plan armature zidova/ Stepenište 3 (JSt3) Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW125_01 .dwg
S W 126-28A 00 Building 28A Details Concrete structure-Formwork- Walls/ Stairs 2 & Stairs 4 (JSt2 & JSt4) Plan oplate zidova/ Stepenište 2 i Stepenište 4 (JSt2 i JSt4) Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW126_00 .dwg
S W 127-28A 00 Building 28A Details Concrete structure-Reinforcement- Walls/ Stairs 2 & Stairs 4 (JSt2 & JSt4) Plan armature zidova/ Stepenište 2 i Stepenište 4(JSt2 i JSt4) Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW127_00 .dwg
S W 128-28A 00 Building 28A Details Concrete structure-Reinforcement- Stairs StUl Plan armature- Stepenište StUl Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW128_00 .dwg
S W 129-28A 01 Building 28A Details Concrete structure-Reinforcement- Stairs 3 (JSt3) Concrete structure-Reinforcement- Stairs 3 (JSt3) Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW129_01 .dwg
S W 130-28A 00 Building 28A Details Concrete structure-Reinforcement- Stairs 2 & Stairs 4 (JSt2&JSt4) Plan armature- Stepenište 2 & Stepenište 4 (JSt2&JSt4) Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW130_00 .dwg
S W 131-28A 01 Building 28A Details Concrete structure-Formwork- Walls/ Elevators 1 (JLf1) Plan oplate zidova/ Lift 1 (JLf1) Level -1 / Roof level 1:50 582_CCN3_2B_28A_D_SW131_01 .dwg
S W 132-28A 01 Building 28A Details Concrete structure-Reinforcement- Walls/ Elevators 1 (JLf1) Plan armature zidova/ Lift 1 (JLf1) Level -1 / Roof level 1:50 582_CCN3_2B_28A_D_SW132_01 .dwg
S W 202-28A 01 Building 28A Text Concrete structure-Reinforcement specifications- Walls Section 51_SW Specifikacija armature -Zidovi Sveska 51_SW - 582_CCN3_2B_28A_R_SW202_01 .pdf
52_SW- WALLS REINFORCEMENT AND FORMWORKS PART 3/3
S W 133-28A 01 Building 28A Details Concrete structure-Formwork- Walls/ Elevators 2 & 3 (JLf2 & JLf3) & Z14a (Z14b) Plan oplate zidova/ Lift 2 & 3 (JLf2 & JLf3) & Z14a (Z14b) Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW133_01 .dwg
S W 134-28A 01 Building 28A Details Concrete structure-Reinforcement- Walls/ Elevators 2 & 3 (JLf2 & JLf3) & Z14a (Z14b) Plan armature zidova/ Lift 2 & 3 (JLf2 & JLf3) & Z14a (Z14b) Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW134_01 .dwg
S W 135-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Stairs 5 Plan oplate i armature- Stepeništa 5 Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW135_00 .dwg
S W 136-28A 00 Building 28A Details Concrete structure-Formwork&Reinforcement- Stairs 6 Plan oplate i armature- Stepeništa 6 Level -1 / Level 0 1:50 582_CCN3_2B_28A_D_SW136_00 .dwg
S W 137-28A 01 Building 28A Details Concrete structure-Formwork - Walls Connection Building Plan oplate zidova-Vezni deo Level -1 / Level 2 1:50 582_CCN3_2B_28A_D_SW137_01 .dwg
S W 138-28A 01 Building 28A Details Concrete structure-Reinforcement - Walls Connection Building Plan armature zidova-Vezni deo Level -1 / Level 2 1:50 582_CCN3_2B_28A_D_SW138_01 .dwg
S W 139-28A 00 Building 28A Details Concrete structure-Formwork- Walls/ Stairs 1 (JSt1) Plan oplate zidova/ Stepenište 1 (JSt1) Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW139_00
S W 140-28A 00 Building 28A Details Concrete structure-Reinforcement- Walls/ Stairs 1 (JSt1) Plan armature zidova/ Stepenište 1 (JSt1) Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW140_00
S W 141-28A 00 Building 28A Details Concrete structure-Reinforcement- Stairs 1 (JSt1) Concrete structure-Reinforcement- Stairs 1 (JSt1) Level -1 / Technical level 1:50 582_CCN3_2B_28A_D_SW141_00
S W 203-28A 01 Building 28A Text Concrete structure-Reinforcement specifications- Walls Section 52_SW Specifikacija armature -Zidovi Sevska 52_SW - 582_CCN3_2B_28A_R_SW203_01 .pdf
60_SS- STRUCTURAL STEEL CONSTRUCTION
S S 101-28A 00 Building 28A Plan Steel structure - Main entrance - Disposition Čelična konstrukcija - Glavni ulaz - Dispozicija Level ±0 1:50 582_CCN3_2B_28A_D_SS101_00 .dwg
S S 102-28A 00 Building 28A Details Steel structure - Main entrance - Details Čelična konstrukcija - Glavni ulaz - Detalji 1:10 582_CCN3_2B_28A_D_SS102_00 .dwg
S S 103-28A 00 Building 28A Plan Steel structure - Corridor axis 9-12 - Disposition Čelična konstrukcija - Koridor od ose 9 do ose 12 - Dispozicija Level -1 / Level +2 1:50 582_CCN3_2B_28A_D_SS103_00 .dwg
S S 104-28A 00 Building 28A Details Steel structure - Corridor axis 9-12-Details Čelična konstrukcija-- Koridor od ose 9 do ose 12-Detalji 1:10 582_CCN3_2B_28A_D_SS104_00 .dwg
S S 105-28A 00 Building 28A Plan Steel structure - Tehnical roof rooms - Disposition Čelična konstrukcija - Konstrukcija na tehničkom krovu - Dispozicija Roof level 1:100 582_CCN3_2B_28A_D_SS105_00 .dwg
S S 106-28A 00 Building 28A Details Steel structure - Tehnical roof rooms - Details Čelična konstrukcija - Konstrukcija na tehničkom krovu - Detalji 1:10 582_CCN3_2B_28A_D_SS106_00 .dwg
S S 107-28A 00 Building 28A Plan Steel structure - Pedestrian bridges - Disposition Čelična konstrukcija - Pasarela - Dispozicija Level ±0 / Level +2 01:50 582_CCN3_2B_28A_D_SS107_00 .dwg
S S 108-28A 00 Building 28A Details Steel structure - Pedestrian bridges - Details Čelična konstrukcija - Pasarela - Detalji 1:10 582_CCN3_2B_28A_D_SS108_00 .dwg
S S 109-28A 00 Building 28A Plan/Details Steel structure-Canopy on connection building Čelična konstrukcija - Nadstrešnica na veznoj kući Level 1 1:50/10 582_CCN3_2B_28A_D_SS109_00 .dwg
S S 201-28A 00 Building 28A Text Steel structure - Material specifications Čelična konstrukcija - Specifikacija Materijala - 582_CCN3_2B_28A_R_SS201_00 .pdf
70_SP- EXCAVATION PROTECTION
S P 001-28A 00 Building 28A Report General Documents Opšta dokumentacija - 582_CCN3_2B_28A_R_SP001_00 .pdf
S P 002-28A 00 Building 28A Report Technical report Tehnički opis - 582_CCN3_2B_28A_R_SP002_00 .pdf
S P 003-28A 00 Building 28A Report Tehnical conditions Tehnički uslovi - 582_CCN3_2B_28A_R_SP003_00 .pdf
S P 004-28A 00 Building 28A Report Bill of Quantities Predemer i predračun - 582_CCN3_2B_28A_R_SP004_00 .pdf
S P 005-28A 00 Building 28A Report Structural analysis Statički proračun - 582_CCN3_2B_28A_R_SP005_00 .pdf
S P 100-28A 00 Building 28A Plan Excavation Plan Plan iskopa 1:200 582_CCN3_2B_28A_D_SP100_00
S P 101-28A 00 Building 28A Plan Excavation Protection- Formwork-Retaining Wall PZ3 and Pile Wall Obezbedjenje iskopa - Plan oplate Potpornog zida PZ3 i Zida od šipova 1:50 582_CCN3_2B_28A_D_SP101_00 .dwg
S P 102-28A 01 Building 28A Details Excavation Protection- Reinforcement-Pile Wall Obezbedjenje iskopa - Armature- Zida od šipova 1:50 582_CCN3_2B_28A_D_SP102_01 .dwg
S P 103-28A 00 Building 28A Details Excavation Protection- Reinforcement plan of Retaining Wall PZ3 Obezbedjenje iskopa - Plan armature Potpornog zida PZ3 1:50 582_CCN3_2B_28A_D_SP103_00 .dwg
S P 104-28A 00 Building 28A Plan Excavation Protection- Formwork- plan of Retaining Wall ZSP1 Obezbedjenje iskopa - Plan oplate Potpornog zida ZSP1 01:50 582_CCN3_2B_28A_D_SP104_00 .dwg
S P 105-28A 00 Building 28A Details Excavation Protection- Reinforcement plan of Retaining Wall ZSP1 Obezbedjenje iskopa - Plan armature Potpornog zida ZSP1 1:50 582_CCN3_2B_28A_D_SP105_00 .dwg
S P 201-28A 01 Building 28A Text Excavation Protection- Material specifications Obezbedjenje iskopa - Specifikacija Materijala - 582_CCN3_2B_28A_R_SP201_01 .pdf
DOCUMENT LIST STAGE III:
Design and Tender documents Phase 2: Detailed
Design and Tender Documents Step B : Final Detailed
Design CLINICAL CENTER OF NIS - CCN Nis

Spec Chap ID Rev Building Document Type Description Serbian Description Level Scale FILE NAME File type

3_BUILDING T1 (T1)
70_SG - STRUCTURAL DATA FOR OBJECT T1
S G 001-T1 00 Building T1 Report General Documents Opšta dokumenta - 582_CCN3_2B_T1_R_SG001_00 .pdf
S G 002-T1 00 Building T1 Report Brief of structural design Projektni zadatak - 582_CCN3_2B_T1_R_SG002_00 .pdf
S G 003-T1 00 Building T1 Report Technical report Tehnički opis - 582_CCN3_2B_T1_R_SG003_00 .pdf
S G 004-T1 00 Building T1 Report Tehnical conditions Tehnički uslovi - 582_CCN3_2B_T1_R_SG004_00 .pdf
S G 005-T1 00 Building T1 Report Structural analysis Statički proračun - 582_CCN3_2B_T1_R_SG005_00 .pdf
S G 100-T1 01 Building T1 Plan Genaral layout Situacija Level 0 1:1000 582_CCN3_2B_T1_D_SG100_01 .dwg
S G 101-T1 01 Building T1 Plan Concrete structure-Plan position (POS -50 and POS 0) Plan pozicija (POS -50 i POS 0) Ground level 1:50 582_CCN3_2B_T1_D_SG101_01 .dwg
S F 102-T1 01 Building T1 Plan Concrete structure-Formwork-Walls (POS ZA, ZA',ZD,Z2,Z3,ZB,ZB',Z7,Z8,ZC',ZC) Oplata zidova (POS ZA, ZA',ZD,Z2,Z3,ZB,ZB',Z7,Z8,ZC',ZC) Ground level / Roof level 1:50 582_CCN3_2B_T1_D_SF102_01 .dwg
Concrete structure-Formwork-Walls (POS Z3', Z4, Z5, Z5'',Z1,Z6,Z4', Z5'), cross sections 1-1 to 6-6 and Plan position Oplata zidova (POS Z3', Z4, Z5, Z5'',Z1,Z6,Z4', Z5'), preseci 1-1 do 6-6 i Planovi pozicija POS -54 i
S F 103-T1 02 Building T1 Plan Ground level / Roof level 1:50 582_CCN3_2B_T1_D_SF103_02 .dwg
POS -54 and POS 01 POS 01
S R 201-T1 02 Building T1 Plan Concrete structure-Anchor plan for walls and plan of reinforcement for slabs POS -54 and POS 01 Plan ankera za zidove i plan armature ploča POS -54 i POS 01 Ground level 1:50 582_CCN3_2B_T1_D_SR201_02 .dwg

S R 301-T1 01 Building T1 Plan Concrete structure-Plan of reinforcement for slabs POS -50 Plan armature ploče POS -50 Ground level 1:50 582_CCN3_2B_T1_D_SR301_01 .dwg

S R 302-T1 01 Building T1 Plan Concrete structure-Plan of reinforcement for slabs POS 0 Plan armature ploče POS 0 Roof level 1:50 582_CCN3_2B_T1_D_SR302_01 .dwg

S R 303-T1 01 Building T1 Plan Concrete structure-Plan of reinforcement for walls POS Z2, Z3, ZB, ZB', Z7, Z8, ZC, ZC', Z4, Z4', Z5 Plan armature zidova Z2, Z3, ZB, ZB', Z7, Z8, ZC, ZC', Z4, Z4', Z5 Ground level / Roof level 1:50 582_CCN3_2B_T1_D_SR303_01 .dwg

S R 304-T1 02 Building T1 Plan Concrete structure-Plan of reinforcement for walls POS ZA, ZA', ZA'', ZB'', ZD, Z1, Z1'', Z3', Z5', Z5'', Z6 Plan armature zidova ZA, ZA', ZA'', ZB'', ZD, Z1, Z1'', Z3', Z5', Z5'', Z6 Ground level / Roof level 1:50 582_CCN3_2B_T1_D_SR304_02 .dwg

S R 401-T1 02 Building T1 Text Concrete structure-Reinforcement specifications Specifikacija armature - 582_CCN3_2B_T1_R_SR401_02 .pdf

4_BUILDING T2 (T2)
80_SG - STRUCTURAL DATA FOR OBJECT T2
S G 001-T2 01 Building T2 Report General Documents Opšta dokumenta - 582_CCN3_2B_T2_R_SG001_01 .pdf
S G 002-T2 01 Building T2 Report Brief of structural design Projektni zadatak - 582_CCN3_2B_T2_R_SG002_01 .pdf
S G 003-T2 01 Building T2 Report Technical report Tehnički opis - 582_CCN3_2B_T2_R_SG003_01 .pdf
S G 004-T2 01 Building T2 Report Tehnical conditions Tehnički uslovi - 582_CCN3_2B_T2_R_SG004_01 .pdf
S G 005-T2 02 Building T2 Report Structural analysis Statički proračun - 582_CCN3_2B_T2_R_SG005_02 .pdf
S G 100-T2 01 Building T2 Plan Genaral layout Situacija Level 0 1:1000 582_CCN3_2B_T2_D_SG100_01 .dwg
S G 101-T2 02 Building T2 Plan Concrete structure - Plan position Plan pozicija Ground level 1:50 582_CCN3_2B_T2_D_SG101_02 .dwg
S R 102-T2 02 Building T2 Structural details Concrete structure - Reinforcement plan for foundations Plan armatute temelja Ground level 1:50 582_CCN3_2B_T2_D_SR102_02 .dwg
S R 103-T2 02 Building T2 Structural details Concrete structure - Formwork and reinforcement plan for walls, beams and columns Plan oplate i armature zidova, greda i stubova Ground level / Roof level 1:50 582_CCN3_2B_T2_D_SR103_02 .dwg
S S 104-T2 02 Building T2 Structural details Steel structure of roof Čelična konstrukcija krova Roof level 1:50 582_CCN3_2B_T2_D_SS104_02 .dwg
S R 201-T2 02 Building T2 Text Concrete structure - Reinforcement specifications Specifikacija armature - 582_CCN3_2B_T2_R_SR201_02 .pdf
S S 202-T2 01 Building T2 Text Steel structure - Material specifications Čelična konstrukcija-Specifikacija Materijala - 582_CCN3_2B_T2_R_SS202_01 .pdf

5_TOPOGRAPHIC SURVEY PLAN (TSP)


10_TG - TOPOGRAPHIC SURVEY_ GENERAL DRAWINGS AND REPORTS
T G 001-A 00 All Buildings Report General Documents Opšta dokumenta - 582_CCN3_2B_A_R_TG001_00 .pdf
T G 002-A 00 All Buildings Report Brief of structural design Projektni zadatak - 582_CCN3_2B_A_R_TG002_00 .pdf
T G 003-A 00 All Buildings Report Technical report Tehnički opis - 582_CCN3_2B_A_R_TG003_00 .pdf
T G 004-A 00 All Buildings Report Bill Of Quantities Predmer i predračun - 582_CCN3_2B_A_R_TG004_00 .pdf
T G 005-A 00 All Buildings Plan Genaral layout-Position of benchmark Situacija-Položaj repera Level 0 1:500 582_CCN3_2B_A_D_TG005_00 .dwg
DOCUMENT LIST
STAGE III: Design and Tender documents
Phase 2: Detailed Design and Tender Documents
Step B : Final Detailed Design
CLINICAL CENTER OF NIŠ - CCN
Niš

Date of Document
Volume Book Section Prog. Blg. Type English Description Level Serbian Description Scale File Name
submission Name
WATER AND SEWAGE INSTALLATIONS
BUILDING 27
WATER AND SEWAGE REPORTS
4 01 1 001 Building 27 Report Technical report Tehnički opis - MW001-27 582_CCN3_2B_27_R_MW001_02
4 01 1 002 Building 27 Report Bill of quantity Predmer i predračun radova - MW002-27 582_CCN3_2B_27_R_MW002_02
4 01 1 003 Building 27 Report Technical specification Tehnička specifikacija - MW003-27 582_CCN3_2B_27_R_MW003_02
WATER AND SEWAGE DRAWINGS
4 01 1 004 Building 27 Plan Site plan Situacija 1:500 MW100-27 582_CCN3_2B_27_D_MW100_02
4 01 1 005 Building 27 Plan Rainwater and sewage system below slab - foundation plan Level -1 Sistemi odvođenja atmosferskih voda i kanalizacije donji razvod - temelji 1:100 MW101A-27 582_CCN3_2B_27_D_MW101A_02
4 01 1 006 Building 27 Plan Rainwater and sewage system below slab - foundation plan Level -1 Sistemi odvođenja atmosferskih voda i kanalizacije donji razvod - temelji 1:100 MW101B-27 582_CCN3_2B_27_D_MW101B_02
4 01 1 007 Building 27 Plan Rainwater and sewage system below slab - ceiling distribution Level -1 Sistemi odvođenja atmosferskih voda i kanalizacije - plafonski razvod 1:100 MW102A-27 582_CCN3_2B_27_D_MW102A_02
4 01 1 008 Building 27 Plan Rainwater and sewage system below slab - ceiling distribution Level -1 Sistemi odvođenja atmosferskih voda i kanalizacije - plafonski razvod 1:100 MW102B-27 582_CCN3_2B_27_D_MW102B_02
4 01 1 009 Building 27 Plan Domestic water supply ceiling distribution Level -1 Sistemi vodovoda plafonski razvod 1:100 MW103A-27 582_CCN3_2B_27_D_MW103A_02
4 01 1 010 Building 27 Plan Domestic water supply ceiling distribution Level -1 Sistemi vodovoda plafonski razvod 1:100 MW103B-27 582_CCN3_2B_27_D_MW103B_02
4 01 1 011 Building 27 Plan Rainwater and sewage system Level ±0 Sistemi odvođenja atmosferskih voda i kanalizacije 1:100 MW104A-27 582_CCN3_2B_27_D_MW104A_02
4 01 1 012 Building 27 Plan Rainwater and sewage system Level ±0 Sistemi odvođenja atmosferskih voda i kanalizacije 1:100 MW104B-27 582_CCN3_2B_27_D_MW104B_02
4 01 1 013 Building 27 Plan Domestic water supply Level ±0 Sistemi vodovoda 1:100 MW105A-27 582_CCN3_2B_27_D_MW105A_02
4 01 1 014 Building 27 Plan Domestic water supply Level ±0 Sistemi vodovoda 1:100 MW105B-27 582_CCN3_2B_27_D_MW105B_02
4 01 1 015 Building 27 Plan Domestic water supply, rainwater and sewage system Level +1 Sistemi vodovoda, odvođenja atmosferskih voda i kanalizacije 1:100 MW106A-27 582_CCN3_2B_27_D_MW106A_02
4 01 1 016 Building 27 Plan Domestic water supply, rainwater and sewage system Level +1 Sistemi vodovoda, odvođenja atmosferskih voda i kanalizacije 1:100 MW106B-27 582_CCN3_2B_27_D_MW106B_02
4 01 1 017 Building 27 Plan Domestic water supply, rainwater and sewage system Level +2 Sistemi vodovoda, odvođenja atmosferskih voda i kanalizacije 1:100 MW107A-27 582_CCN3_2B_27_D_MW107A_02
4 01 1 018 Building 27 Plan Domestic water supply, rainwater and sewage system Level +2 Sistemi vodovoda, odvođenja atmosferskih voda i kanalizacije 1:100 MW107B-27 582_CCN3_2B_27_D_MW107B_02
4 01 1 019 Building 27 Plan Domestic water supply, rainwater and sewage system Roof level Sistemi vodovoda, odvođenja atmosferskih voda i kanalizacije 1:100 MW108A-27 582_CCN3_2B_27_D_MW108A_02
4 01 1 020 Building 27 Plan Domestic water supply, rainwater and sewage system Roof level Sistemi vodovoda, odvođenja atmosferskih voda i kanalizacije 1:100 MW108B-27 582_CCN3_2B_27_D_MW108B_02
4 01 1 021 Building 27 Scheme Domestic water supply isometric diagrams Level -1 Izometrijska šema vode MW401-27 582_CCN3_2B_27_D_MW401_02
4 01 1 022 Building 27 Scheme Domestic water supply isometric diagrams Level ±0 Izometrijska šema vode MW402-27 582_CCN3_2B_27_D_MW402_02
4 01 1 023 Building 27 Scheme Domestic water supply isometric diagrams Level +1 Izometrijska šema vode MW403-27 582_CCN3_2B_27_D_MW403_02
4 01 1 024 Building 27 Scheme Domestic water supply isometric diagrams Level +2 Izometrijska šema vode MW404-27 582_CCN3_2B_27_D_MW404_02
4 01 1 025 Building 27 Scheme Vertical section of sewage stacks Vertikalni preseci kanalizacionih vertikala - MW405-27 582_CCN3_2B_27_D_MW405_02
4 01 1 026 Building 27 Scheme Vertical section of sewage stacks Vertikalni preseci kanalizacionih vertikala - MW406-27 582_CCN3_2B_27_D_MW406_02
4 01 1 027 Building 27 Scheme Vertical section of sewage stacks Vertikalni preseci kanalizacionih vertikala - MW407-27 582_CCN3_2B_27_D_MW407_02
4 01 1 028 Building 27 Scheme Vertical section of sewage stacks Vertikalni preseci kanalizacionih vertikala - MW408-27 582_CCN3_2B_27_D_MW408_02
4 01 1 029 Building 27 Scheme Longitudinal section of sewage stacks Podužni preseci kanalizacionih vertikala - MW409-27 582_CCN3_2B_27_D_MW409_02
4 01 1 030 Building 27 Scheme Vertical section of rain water stacks Vertikalni preseci kišnih vertikala - MW410-27 582_CCN3_2B_27_D_MW410_02
4 01 1 031 Building 27 Scheme Details - Water supply schemes - Details 1& 2 Detalji - Šeme vode - Detalj 1 i 2 - MW411-27 582_CCN3_2B_27_D_MW411_02
4 01 1 032 Building 27 Scheme Details - Water supply schemes - Details 3 & 4 Detalji - Šeme vode - Detalj 3 i 4 - MW412-27 582_CCN3_2B_27_D_MW412_02
4 01 1 033 Building 27 Scheme Details - Water supply schemes - Details 5 & 6 Detalji - Šeme vode - Detalj 5 i 6 - MW413-27 582_CCN3_2B_27_D_MW413_02
4 01 1 034 Building 27 Scheme Details - Water supply schemes - Details 7, 8 & 9 Detalji - Šeme vode - Detalj 7, 8 i 9 - MW414-27 582_CCN3_2B_27_D_MW414_02
4 01 1 035 Building 27 Scheme Details - Water supply schemes - Details 10 Detalji - Šeme vode - Detalj 10 - MW415-27 582_CCN3_2B_27_D_MW415_02
4 01 1 036 Building 27 Scheme Details - Water supply schemes - Details 11,12, 13 & 14 Detalji - Šeme vode - Detalj 11,12, 13 i 14 - MW416-27 582_CCN3_2B_27_D_MW416_02
4 01 1 037 Building 27 Scheme Details - Water supply schemes - Details 15, 16 & 17 Detalji - Šeme vode - Detalj 15, 16 i 17 - MW417-27 582_CCN3_2B_27_D_MW417_02
4 01 1 038 Building 27 Scheme Details - Water supply schemes - Details 18,19, 20 & 21 Detalji - Šeme vode - Detalj 18,19, 20 i 21 - MW418-27 582_CCN3_2B_27_D_MW418_02
4 01 1 039 Building 27 Scheme Details - Water supply schemes - Details 22, 23 & 24 Detalji - Šeme vode - Detalj 22, 23 i 24 - MW419-27 582_CCN3_2B_27_D_MW419_02
4 01 1 040 Building 27 Scheme Details - Water supply schemes - Details 22, 23 & 24 Presek kanalizacije ispod pasarele - MW420-27 582_CCN3_2B_27_D_MW420_02
4 01 1 041 Building 27 Scheme Layout - Details Dispozicija - Detalji - MW501-27 582_CCN3_2B_27_D_MW501_02
BUILDING 28A
WATER AND SEWAGE REPORTS
4 01 1 001 Building 28A Report Technical report Tehnički opis - MW001-28A 582_CCN3_2B_28A_R_MW001_02
4 01 1 002 Building 28A Report Bill of quantity Predmer i predračun radova - MW002-28A 582_CCN3_2B_28A_R_MW002_02
4 01 1 003 Building 28A Report Technical specification Tehnička specifikacija - MW003-28A 582_CCN3_2B_28A_R_MW003_02
WATER AND SEWAGE DRAWINGS
4 01 1 004 Building 28A Plan Site plan Situacija 1:500 MW100-28A 582_CCN3_2B_28A_D_MW100_02
4 01 1 005 Building 28A Plan Rainwater and sewage system below slab - foundation plan Level -1 Sistemi odvođenja atmosferskih voda i kanalizacije donji razvod - temelji 1:100 MW101A-28A 582_CCN3_2B_28A_D_MW101A_02

4 01 1 006 Building 28A Plan Rainwater and sewage system below slab - ceiling distribution Level -1 Sistemi odvođenja atmosferskih voda i kanalizacije plafonski razvod 1:100 MW101B-28A 582_CCN3_2B_28A_D_MW101B_02

4 01 1 007 Building 28A Plan Domestic water supply ceiling distribution Level -1 Sistemi vodovoda plafonski razvod 1:100 MW101C-28A 582_CCN3_2B_28A_D_MW101C_02
4 01 1 008 Building 28A Plan Rainwater and sewage system Level ±0 Sistemi odvođenja atmosferskih voda i kanalizacije 1:100 MW102A-28A 582_CCN3_2B_28A_D_MW102A_02
4 01 1 009 Building 28A Plan Domestic water supply Level ±0 Sistemi vodovoda 1:100 MW102B-28A 582_CCN3_2B_28A_D_MW102B_02
4 01 1 010 Building 28A Plan Rainwater and sewage system Level +1 Sistemi odvođenja atmosferskih voda i kanalizacije 1:100 MW103A-28A 582_CCN3_2B_28A_D_MW103A_02
4 01 1 011 Building 28A Plan Domestic water supply Level +1 Sistemi vodovoda 1:100 MW103B-28A 582_CCN3_2B_28A_D_MW103B_02
4 01 1 012 Building 28A Plan Domestic water supply, rainwater and sewage system Level +2 Sistemi vodovoda, odvođenja atmosferskih voda i kanalizacije 1:100 MW104-28A 582_CCN3_2B_28A_D_MW104_02
4 01 1 013 Building 28A Plan Domestic water supply, rainwater and sewage system Level +3 Sistemi vodovoda, odvođenja atmosferskih voda i kanalizacije 1:100 MW105-28A 582_CCN3_2B_28A_D_MW105_02
4 01 1 014 Building 28A Plan Domestic water supply, rainwater and sewage system Level +4 Sistemi vodovoda, odvođenja atmosferskih voda i kanalizacije 1:100 MW106-28A 582_CCN3_2B_28A_D_MW106_02
4 01 1 015 Building 28A Plan Domestic water supply, rainwater and sewage system Level +5 Sistemi vodovoda, odvođenja atmosferskih voda i kanalizacije 1:100 MW107-28A 582_CCN3_2B_28A_D_MW107_02
4 01 1 016 Building 28A Plan Domestic water supply, rainwater and sewage system Technical floor Sistemi vodovoda, odvođenja atmosferskih voda i kanalizacije 1:100 MW108-28A 582_CCN3_2B_28A_D_MW108_02
4 01 1 017 Building 28A Plan Domestic water supply, rainwater and sewage system Roof Sistemi vodovoda, odvođenja atmosferskih voda i kanalizacije 1:100 MW109-28A 582_CCN3_2B_28A_D_MW109_02
4 01 1 018 Building 28A Scheme Domestic water supply isometric diagrams Level -1 Izometrijska šema vode MW201-28A 582_CCN3_2B_28A_D_MW201_02
4 01 1 019 Building 28A Scheme Domestic water supply isometric diagrams Level ±0 Izometrijska šema vode MW202-28A 582_CCN3_2B_28A_D_MW202_02
4 01 1 020 Building 28A Scheme Domestic water supply isometric diagrams Level +1 Izometrijska šema vode MW203-28A 582_CCN3_2B_28A_D_MW203_02
4 01 1 021 Building 28A Scheme Domestic water supply isometric diagrams Level +2 Izometrijska šema vode MW204-28A 582_CCN3_2B_28A_D_MW204_02
4 01 1 022 Building 28A Scheme Domestic water supply isometric diagrams Level +3 Izometrijska šema vode MW205-28A 582_CCN3_2B_28A_D_MW205_02
4 01 1 023 Building 28A Scheme Domestic water supply isometric diagrams Level +4 Izometrijska šema vode MW206-28A 582_CCN3_2B_28A_D_MW206_02
4 01 1 024 Building 28A Scheme Domestic water supply isometric diagrams Level +5 Izometrijska šema vode MW207-28A 582_CCN3_2B_28A_D_MW207_02
4 01 1 025 Building 28A Scheme Domestic water supply isometric diagrams Technical floor Izometrijska šema vode MW208-28A 582_CCN3_2B_28A_D_MW208_02
4 01 1 026 Building 28A Scheme Vertical section of sewage stacks Vertikalni preseci kanalizacionih vertikala - MW416-28A 582_CCN3_2B_28A_D_MW416_02
Date of Document
Volume Book Section Prog. Blg. Type English Description Level Serbian Description Scale File Name
submission Name
4 01 1 027 Building 28A Scheme Vertical section of sewage stacks Vertikalni preseci kanalizacionih vertikala - MW417-28A 582_CCN3_2B_28A_D_MW417_02
4 01 1 028 Building 28A Scheme Vertical section of sewage stacks Vertikalni preseci kanalizacionih vertikala - MW418-28A 582_CCN3_2B_28A_D_MW418_02
4 01 1 029 Building 28A Scheme Vertical section of sewage stacks Vertikalni preseci kanalizacionih vertikala - MW419-28A 582_CCN3_2B_28A_D_MW419_02
4 01 1 030 Building 28A Scheme Vertical section of sewage stacks Vertikalni preseci kanalizacionih vertikala - MW420-28A 582_CCN3_2B_28A_D_MW420_02
4 01 1 031 Building 28A Scheme Vertical section of sewage stacks Vertikalni preseci kanalizacionih vertikala - MW421-28A 582_CCN3_2B_28A_D_MW421_02
4 01 1 032 Building 28A Scheme Vertical section of sewage stacks Vertikalni preseci kanalizacionih vertikala - MW422-28A 582_CCN3_2B_28A_D_MW422_02
4 01 1 033 Building 28A Scheme Vertical section of sewage stacks Podužni preseci kanalizacije - MW423-28A 582_CCN3_2B_28A_D_MW423_02
4 01 1 034 Building 28A Scheme Vertical section of sewage stacks Podužni preseci kanalizacije - MW424-28A 582_CCN3_2B_28A_D_MW424_02
4 01 1 035 Building 28A Scheme Vertical section of sewage stacks - The lower distribution level -1 Podužni preseci kanalizacije - Donji razvod na nivou -1 - MW425-28A 582_CCN3_2B_28A_D_MW425_02
4 01 1 036 Building 28A Scheme Vertical section of rain water stacks poduzni preseci kišnih vertikala - MW426-28A 582_CCN3_2B_28A_D_MW426_02
4 01 1 037 Building 28A Scheme Scheme - Details 1 & 2 Šema - Detalji 1 i 2 - MW427-28A 582_CCN3_2B_28A_D_MW427_02
4 01 1 038 Building 28A Scheme Scheme - Details 3, 4 & 5 Šema - Detalji 3, 4 i 5 - MW428-28A 582_CCN3_2B_28A_D_MW428_02
4 01 1 039 Building 28A Scheme Scheme - Details 6 & 7 Šema - Detalji 6 i 7 - MW429-28A 582_CCN3_2B_28A_D_MW429_02
4 01 1 040 Building 28A Scheme Scheme - Details 8 & 9 Šema - Detalji 8 i 9 - MW430-28A 582_CCN3_2B_28A_D_MW430_02
4 01 1 041 Building 28A Scheme Scheme - Details 10 Šema - Detalji 10 - MW431-28A 582_CCN3_2B_28A_D_MW431_02
4 01 1 042 Building 28A Scheme Scheme - Details 11 & 12 Šema - Detalji 11 i 12 - MW432-28A 582_CCN3_2B_28A_D_MW432_02
4 01 1 043 Building 28A Scheme Scheme - Details 12 & 13 Šema - Detalji 12 i 13 - MW433-28A 582_CCN3_2B_28A_D_MW433_02
4 01 1 044 Building 28A Scheme Scheme - Details 15, 16, 17 & 18 Šema - Detalji 15, 16, 17 i 18 - MW434-28A 582_CCN3_2B_28A_D_MW434_02
4 01 1 045 Building 28A Scheme Scheme - Details 19, 21 & 24 Šema - Detalji 19, 21 i 24 - MW435-28A 582_CCN3_2B_28A_D_MW435_02
4 01 1 046 Building 28A Scheme Scheme - Details 22, 25 & 26 Šema - Detalji 22, 25 i 29 - MW436-28A 582_CCN3_2B_28A_D_MW436_02
4 01 1 047 Building 28A Scheme Scheme - Details 26, 27 & 28 Šema - Detalji 26, 27 i 28 - MW437-28A 582_CCN3_2B_28A_D_MW437_02
4 01 1 048 Building 28A Scheme Scheme - Details 4 & 4' Šema - Detalji 4 i 4' - MW438-28A 582_CCN3_2B_28A_D_MW438_02
4 01 1 049 Building 28A Scheme Scheme - Details 5 & 5' Šema - Detalji 5 i 5' - MW439-28A 582_CCN3_2B_28A_D_MW439_02
4 01 1 050 Building 28A Scheme Washbasin detail Šema - Detalji umivaonika - MW440-28A 582_CCN3_2B_28A_D_MW440_02
4 01 1 051 Building 28A Scheme Layout, Details Dipozicija, Detalji - MW501-28A 582_CCN3_2B_28A_D_MW501_02
TECHNICAL BLOCK T1
WATER AND SEWAGE REPORTS
4 01 1 001 Technical block T1 Report Technical report Tehnički opis - MW001-T1 582_CCN3_2B_T1_R_MW001_02
4 01 1 002 Technical block T1 Report Bill of quantity Predmer i predračun radova - MW002-T1 582_CCN3_2B_T1_R_MW002_02
4 01 1 003 Technical block T1 Report Technical specification Tehnička specifikacija - MW003-T1 582_CCN3_2B_T1_R_MW003_02
WATER AND SEWAGE DRAWINGS
4 01 1 004 Technical block T1 Plan Site plan Situacija 1:200 MW100-T1 582_CCN3_2B_T1_D_MW100_02
4 01 1 005 Technical block T1 Plan Domestic water supply, rainwater and sewage system Level ±0 Sistemi vodovoda, odvodjenja atmosferskih voda i kanalizacije 1:50 MW101-T1 582_CCN3_2B_T1_D_MW101_02
4 01 1 006 Technical block T1 Plan Rainwater and sewage system Roof Level Sistemi odvođenja atmosferskih voda i kanalizacije 1:50 MW102-T1 582_CCN3_2B_T1_D_MW102_02
4 01 1 007 Technical block T1 Plan Longitudinal sections of drainage network and Water scheme Podužni profili kanalizacione mreže i šema vode - MW401-T1 582_CCN3_2B_T1_D_MW401_02
TECHNICAL BLOCK T2
WATER AND SEWAGE REPORTS
4 01 1 001 Technical block T2 Report Technical report Tehnički opis - MW001-T2 582_CCN3_2B_T2_R_MW001_02
4 01 1 002 Technical block T2 Report Bill of quantity Predmer i predračun radova - MW002-T2 582_CCN3_2B_T2_R_MW002_02
4 01 1 003 Technical block T2 Report Technical specification Tehnička specifikacija - MW003-T2 582_CCN3_2B_T2_R_MW003_02
WATER AND SEWAGE DRAWINGS
4 01 1 004 Technical block T2 Plan Site plan Situacija 1:200 MW100-T2 582_CCN3_2B_T2_D_MW100_02
4 01 1 005 Technical block T2 Plan Domestic water supply, rainwater and sewage system Level ±0 Sistemi vodovoda, odvodjenja atmosferskih voda i kanalizacije 1:50 MW101-T2 582_CCN3_2B_T2_D_MW101_02
4 01 1 006 Technical block T2 Plan Rainwater and sewage system Roof Level Sistemi odvođenja atmosferskih voda i kanalizacije 1:50 MW102-T2 582_CCN3_2B_T2_D_MW102_02
4 01 1 007 Technical block T2 Plan Longitudinal sections of drainage network and Water scheme Podužni profili kanalizacione mreže i šema vode - MW401-T2 582_CCN3_2B_T2_D_MW401_02
DOCUMENT LIST STAGE III: Design and Tender documents Phase 2: Detailed Design and Tender Documents Step B : Draft Detailed Design Proposal CLINICAL CENTER OF NIS - CCN Nis
BUILDING 27

Document
Deliver on Volume Book Section Prog. Building Type English Description Level Serbian Description Scale File Name
Name

5 VOLUME 5 - ELECTRICAL INSTALLATIONS


5 BOOK 1 - DETAILED DESIGN OF LOW VOLTAGE INSTALLATION IN BUILDING 27
5 COPYBOOK 1 - TEXTUAL DOCUMENTATION
5 Part 1 - General Documents
Building 27 Report The decision on registration of a project organization Rešenje o registraciji projektne organizacije
Building 27 Report The decision on appointment of responsible designer Rešenje o imenovanju odgovornog projektanta
Building 27 Report License of responsible designer and a certificate of membership IKS Licenca odgovornog projektanta i potvrda članstva IKS
Building 27 Report Statement by the responsible project compliance Izjava odgovornog projektanta o poštovanju propisa
Building 27 Report Consent of the Client / Investor with the technical documentation Saglasnost Naručioca / Investitora sa Tehničkom dokumentacijom
Building 27 Report Statement of Compliance responsible mutual designers Izjava o medjusobnoj usaglašenosti odgovornih projektanata
5 Part 2 - Project Brief
Building 27 Report Project brief Projektni zadatak
5 Part 3 - Technical reports
Building 27 Report Technical description Tehnički opis EI001-27 582_CCN3_2B_27_R_EI001_05
Building 27 Report Technical Calculations Tehnički proračuni - EI002-27 582_CCN3_2B_27_R_EI002_05

Building 27 Report General and technical requirements for performing electric power installation Tehnički uslovi EI003-27 582_CCN3_2B_27_R_EI003_05

Building 27 Report Report on safety and health at work work Prilog o bezbednosti i zdravlju na radu EI004-27 582_CCN3_2B_27_R_EI004_05
Building 27 Report List of used technical standards and norms regulations Spisak primenjenih stadnarda, propisa i literature EI005-27 582_CCN3_2B_27_R_EI005_05
Building 27 Report Cable list Kabl lista EI006-27 582_CCN3_2B_27_R_EI006_05
5 COPYBOOK 2 - BILL OF QUANTITIES
Report Technical Specifications Tehnička specifikacija EI000-27 582_CCN3_2B_27_R_EI000_05
Building 27 Report BoQ - Bill of Quantities Predmer i predračun radova EI020-27 582_CCN3_2B_27_R_EI020_06
5 COPYBOOK 3 - GRAPHICAL PART - LAYOUTS
Site Plan Situacija EI010 582_CCN3_2B_27_D_EI010_05
General legend Opšta legenda EI011 582_CCN3_2B_27_D_EI011_05

Building 27 Diagram General LV distribution diagram Glavna šema NN razvoda - EI401-27 582_CCN3_2B_27_D_EI401_05
Building 27 Diagram Earthing and LPS Blok šema uzemljenja i izjednačenja potencijala - EI402-27 582_CCN3_2B_27_D_EI402_05

Building 27 Plan Electrical distribution Level -1 - PART A Elektroenergetski razvod 1:100 EI101A-27 582_CCN3_2B_27_D_EI101_05
Building 27 Plan Electrical distribution Level -1 - PART B Elektroenergetski razvod 1:100 EI101B-27 582_CCN3_2B_27_D_EI101_05
Building 27 Plan Electrical distribution Level +0 - PART A Elektroenergetski razvod 1:100 EI102A-27 582_CCN3_2B_27_D_EI102_05
Building 27 Plan Electrical distribution Level +0 - PART B Elektroenergetski razvod 1:100 EI102B-27 582_CCN3_2B_27_D_EI102_05
Building 27 Plan Electrical distribution Level +1 - PART A Elektroenergetski razvod 1:100 EI103A-27 582_CCN3_2B_27_D_EI103_05
Building 27 Plan Electrical distribution Level +1 - PART B Elektroenergetski razvod 1:100 EI103B-27 582_CCN3_2B_27_D_EI103_05
Building 27 Plan Electrical distribution Level +2 - PART A Elektroenergetski razvod 1:100 EI104A-27 582_CCN3_2B_27_D_EI104_05
Building 27 Plan Electrical distribution Level +2 - PART B Elektroenergetski razvod 1:100 EI104B-27 582_CCN3_2B_27_D_EI104_05
Building 27 Plan Electrical distribution Roof level / Part A Elektroenergetski razvod 1:100 EI105A-27 582_CCN3_2B_27_D_EI105_05

Building 27 Plan Light installation Level -1 / Part A Instalacija osvetljenja 1:100 EI106A-27 582_CCN3_2B_27_D_EI106_05
Building 27 Plan Light installation Level -1 / Part B Instalacija osvetljenja 1:100 EI106B-27 582_CCN3_2B_27_D_EI106_05
Building 27 Plan Light installation Level ±0 / Part A Instalacija osvetljenja 1:100 EI107A-27 582_CCN3_2B_27_D_EI107_05
Building 27 Plan Light installation Level ±0 / Part B Instalacija osvetljenja 1:100 EI107B-27 582_CCN3_2B_27_D_EI107_05
Building 27 Plan Light installation Level +1 / Part A Instalacija osvetljenja 1:100 EI108A-27 582_CCN3_2B_27_D_EI108_05
Building 27 Plan Light installation Level +1 / Part B Instalacija osvetljenja 1:100 EI108B-27 582_CCN3_2B_27_D_EI108_05
Building 27 Plan Light installation Level +2 / Part A Instalacija osvetljenja 1:100 EI109A-27 582_CCN3_2B_27_D_EI109_05
Building 27 Plan Light installation Level +2 / Part B Instalacija osvetljenja 1:100 EI109B-27 582_CCN3_2B_27_D_EI109_05
Building 27 Plan Light installation Roof level / Part A Instalacija osvetljenja 1:100 EI110A-27 582_CCN3_2B_27_D_EI110_05
Building 27 Plan Light installation Roof level / Part B Instalacija osvetljenja 1:100 EI110B-27 582_CCN3_2B_27_D_EI110_05

Building 27 Plan Power socket outlets Level -1 / Part A Instalacija el. uticnica 1:100 EI111A-27 582_CCN3_2B_27_D_EI111_05
Building 27 Plan Power socket outlets Level -1 / Part B Instalacija el. uticnica 1:100 EI111B-27 582_CCN3_2B_27_D_EI111_05
Building 27 Plan Power socket outlets Level ±0 / Part A Instalacija el. uticnica 1:100 EI112A-27 582_CCN3_2B_27_D_EI112_05
Building 27 Plan Power socket outlets Level ±0 / Part B Instalacija el. uticnica 1:100 EI112B-27 582_CCN3_2B_27_D_EI112_05
Building 27 Plan Power socket outlets Level +1 / Part A Instalacija el. uticnica 1:100 EI113A-27 582_CCN3_2B_27_D_EI113_05
Building 27 Plan Power socket outlets Level +1 / Part B Instalacija el. uticnica 1:100 EI113B-27 582_CCN3_2B_27_D_EI113_05
Building 27 Plan Power socket outlets Level +2 / Part A Instalacija el. uticnica 1:100 EI114A-27 582_CCN3_2B_27_D_EI114_05
Building 27 Plan Power socket outlets Level +2 / Part B Instalacija el. uticnica 1:100 EI114B-27 582_CCN3_2B_27_D_EI114_05

Building 27 Diagram Earthing and LPS Foundation Gromobran i uzemljenje - temelj - EI103.1A-27 582_CCN3_2B_27_D_EI103.1A_05
Building 27 Diagram Earthing and Lightning Protection Foundation Gromobran i uzemljenje - temelj - EI103.1B-27 582_CCN3_2B_27_D_EI103.1B_05
Building 27 Diagram Earthing and Lightning Protection Facade 1 Gromobran i uzemljenje - fasada 1 - EI103.2-27 582_CCN3_2B_27_D_EI103.2_05
Building 27 Diagram Earthing and Lightning Protection Facade 2 Gromobran i uzemljenje - fasada 2 - EI103.3-27 582_CCN3_2B_27_D_EI103.3_05
Building 27 Diagram Earthing and Lightning Protection Facade 3 Gromobran i uzemljenje - fasada 3 - EI103.4-27 582_CCN3_2B_27_D_EI103.4_05
Building 27 Diagram Earthing and Lightning Protection Facade 4 Gromobran i uzemljenje - fasada 4 - EI103.5-27 582_CCN3_2B_27_D_EI103.5_05
Building 28 Diagram Earthing and Lightning Protection Roof Level Gromobran i uzemljenje - krov - EI103.6-27 582_CCN3_2B_27_D_EI103.6_05
DOCUMENT LIST STAGE III: Design and Tender documents Phase 2: Detailed Design and Tender Documents Step B : Draft Detailed Design Proposal CLINICAL CENTER OF NIS - CCN Nis
BUILDING 27

Document
Deliver on Volume Book Section Prog. Building Type English Description Level Serbian Description Scale File Name
Name

Building 27 Details Electrical installation Detalji - EI201-27 582_CCN3_2B_27_D_EI201_05


Building 27 Details Fron view of distribution boards Detalji - Prednji izgledi ormana - EI202-27 582_CCN3_2B_27_D_EI202_05
Building 27 Details Sections Detalji - Preseci - EI203-27 582_CCN3_2B_27_D_EI203_05
5 COPYBOOK 4 - GRAPHICAL PART - DISTRIBUTION BOARD
Building 27 Scheme Switchboards (SMDB_...) Single line diagram Jednopolne šeme glavnih razvodnih ormana (GRO/SMDB) - EB400-27 582_CCN3_2B_27_D_EB400_05
EB401-EB4..
Building 27 Scheme Typical Final Distribution Boards (FDB) Single line diagram Jednopolne šeme tipskih krajnjih razvodnih tabli (RT/FDB) - EF400-27 582_CCN3_2B_27_D_EF400_05
EF401-EF4..
Building 28 Scheme Typical Final Distribution Boards (FDB) - ICU Single line diagram Jednopolne šeme tipskih krajnjih razvodnih tabli (RT/FDB) - Intentivna nega - EF400.1-28 582_CCN3_2B_27_D_EF400.1_05
EF401.1-EF4..
Building 29 Scheme Typical Final Distribution Boards (FDB) - OP rooms Single line diagram Jednopolne šeme tipskih krajnjih razvodnih tabli (RT/FDB) - Operacione sale - EF400.2-29 582_CCN3_2B_27_D_EF400.2_06
EF401.2-EF4..
5 BOOK 2 - DETAILED DESIGN OF COMMUNICATION AND SIGNAL INSTALLATION IN BUILDING 27
5 COPYBOOK 1 - TEXTUAL DOCUMENTATION
5 Part 1 - General Documents
Building 27 Report The decision on registration of a project organization Rešenje o registraciji projektne organizacije
Building 27 Report The decision on appointment of responsible designer Rešenje o imenovanju odgovornog projektanta
Building 27 Report License of responsible designer and a certificate of membership IKS Licenca odgovornog projektanta i potvrda članstva IKS
Building 27 Report Statement by the responsible project compliance Izjava odgovornog projektanta o poštovanju propisa
Building 27 Report Consent of the Client / Investor with the technical documentation Saglasnost Naručioca / Investitora sa Tehničkom dokumentacijom
Building 27 Report Statement of Compliance responsible mutual designers Izjava o medjusobnoj usaglašenosti odgovornih projektanata
5 Part 2 - Project Brief
Building 27 Project brief Projektni zadatak
5 Part 3 - Technical reports
Building 27 Report Technical description Tehnički opis EC001-27 582_CCN3_2B_27_R_EC001_08
Building 27 Report Calculations Tehnički proračuni - EC002-27 582_CCN3_2B_27_R_EC002_08
Building 27 Report Technical conditions Tehnički uslovi EC003-27 582_CCN3_2B_27_R_EC003_08
Building 27 Report Safety on work report Prilog o bezbednosti i zdravlju na radu EC004-27 582_CCN3_2B_27_R_EC004_08
Building 27 Report Cable list Kabl lista EC005-27 582_CCN3_2B_27_R_EC005_08
Building 27 Report List of regulations and standards Spisak primenjenih stadnarda, propisa i literature EC006-27 582_CCN3_2B_27_R_EC006_08
5 COPYBOOK 2 - BILL OF QUANTITIES
Building 27 Report Technical Specifications Tehnička specifikacija EC000-27 582_CCN3_2B_27_R_EC000_08
Building 27 Report BoQ - Telecommunication and signaling installation Predmer i predračun radova EC020-27 582_CCN3_2B_27_R_EC020_08
5 COPYBOOK 3 - STRUCTURED CABLING SYSTEM
Site Plan Situacija EC010 582_CCN3_2B_27_D_EC010_08

Building 27 Diagram Block diagram – campus network – SCS system Block diagram Blok šema kompleksa – SKS sisem - EC401.1-27 582_CCN3_2B_27_D_EC401_08
Building 27 Diagram Block diagram – campus network – PBX system Block diagram Blok šema kompleksa – Telefonski sistem - EC401.2-27 582_CCN3_2B_27_D_EC401_08
Building 27 Diagram Main diagram – SCS system Main diagram Blok šema SKS sistema - EC401A-27 582_CCN3_2B_27_D_EC401_08
Building 27 Diagram Block diagram – BD-MDF Block diagram SKS sistem – blok šema L-1 - BD, MDF EC401B-27 582_CCN3_2B_27_D_EC401_08
Building 27 Diagram Block diagram – L-01 Block diagram Level -1 SKS sistem – blok šema L-1 - EC401C-27 582_CCN3_2B_27_D_EC401_08
Building 27 Diagram Block diagram – L+00 Block diagram Level ±0 SKS sistem – blok šema L±0 - EC401D-27 582_CCN3_2B_27_D_EC401_08
Building 27 Diagram Block diagram – L+01 Block diagram Level +1 SKS sistem – blok šema L+1 - EC401E-27 582_CCN3_2B_27_D_EC401_08
Building 27 Diagram Block diagram – L+02 Block diagram Level +2 SKS sistem – blok šema L+2 - EC401F-27 582_CCN3_2B_27_D_EC401_08
Building 27 Diagram Block diagram – SCS system - Active equipment Main diagram Blok šema - aktivna oprema EC401G-27 582_CCN3_2B_27_D_EC401_08
Building 27 Diagram Block diagram – Connection with existing PABX Main diagram Blok šema - veza sa telefonskom centralom EC401H-27 582_CCN3_2B_27_D_EC401_08

Building 27 Plan Comm. system - Structured cabling for telephone and data Level -1 / Part A SKS sistem Nivo -1 / Deo A 1:100 EC101A-27 582_CCN3_2B_27_D_EC101_08
Building 27 Plan Comm. system - Structured cabling for telephone and data Level -1 / Part B SKS sistem Nivo -1 / Deo B 1:100 EC101B-27 582_CCN3_2B_27_D_EC101_08
Building 27 Plan Comm. system - Structured cabling for telephone and data Level ±0 / Part A SKS sistem Nivo ±0 / Deo A 1:100 EC102A-27 582_CCN3_2B_27_D_EC102_08
Building 27 Plan Comm. system - Structured cabling for telephone and data Level ±0 / Part B SKS sistem Nivo ±0 / Deo B 1:100 EC102B-27 582_CCN3_2B_27_D_EC102_08
Building 27 Plan Comm. system - Structured cabling for telephone and data Level +1 / Part A SKS sistem Nivo +1 / Deo A 1:100 EC103A-27 582_CCN3_2B_27_D_EC103_08
Building 27 Plan Comm. system - Structured cabling for telephone and data Level +1 / Part B SKS sistem Nivo +1 / Deo B 1:100 EC103B-27 582_CCN3_2B_27_D_EC103_08
Building 27 Plan Comm. system - Structured cabling for telephone and data Level +2 / Part A SKS sistem Nivo +2 / Deo A 1:100 EC104A-27 582_CCN3_2B_27_D_EC104_08
Building 27 Plan Comm. system - Structured cabling for telephone and data Level +2 / Part B SKS sistem Nivo +2 / Deo B 1:100 EC104B-27 582_CCN3_2B_27_D_EC104_08
Building 27 Plan Cable trays for communication and signal installations Level -1 / Part A Kablovski regali telekomunikacionih i signalnih instalacija 1:100 EC121A-27 582_CCN3_2B_27_D_EC121_08
Building 27 Plan Cable trays for communication and signal installations Level -1 / Part B Kablovski regali telekomunikacionih i signalnih instalacija 1:100 EC121B-27 582_CCN3_2B_27_D_EC121_08
Building 27 Plan Cable trays for communication and signal installations Level ±0 / Part A Kablovski regali telekomunikacionih i signalnih instalacija 1:100 EC122A-27 582_CCN3_2B_27_D_EC122_08
Building 27 Plan Cable trays for communication and signal installations Level ±0 / Part B Kablovski regali telekomunikacionih i signalnih instalacija 1:100 EC122B-27 582_CCN3_2B_27_D_EC122_08
Building 27 Plan Cable trays for communication and signal installations Level +1 / Part A Kablovski regali telekomunikacionih i signalnih instalacija 1:100 EC123A-28 582_CCN3_2B_27_D_EC123_08
Building 27 Plan Cable trays for communication and signal installations Level +1 / Part B Kablovski regali telekomunikacionih i signalnih instalacija 1:100 EC123B-28 582_CCN3_2B_27_D_EC123_08
Building 27 Plan Cable trays for communication and signal installations Level +2 / Part A Kablovski regali telekomunikacionih i signalnih instalacija 1:100 EC124A-29 582_CCN3_2B_27_D_EC124_08
Building 27 Plan Cable trays for communication and signal installations Level +2 / Part B Kablovski regali telekomunikacionih i signalnih instalacija 1:100 EC124B-29 582_CCN3_2B_27_D_EC124_08
DOCUMENT LIST STAGE III: Design and Tender documents Phase 2: Detailed Design and Tender Documents Step B : Draft Detailed Design Proposal CLINICAL CENTER OF NIS - CCN Nis
BUILDING 27

Document
Deliver on Volume Book Section Prog. Building Type English Description Level Serbian Description Scale File Name
Name

5 COPYBOOK 4 - NURSE CALL, INTERCOM AND DECT SYSTEM


Site Plan Situacija EC010 582_CCN3_2B_27_D_EC010_08

Building 27 Diagram Diagram of nurse call system L-1, L±0 Level -1, ±0 Šema razvoda instalacije bolničke signalizacije L-1, L±0 - EC402A-27 582_CCN3_2B_27_D_EC402A_08
Building 27 Diagram Diagram of nurse call system L+1, L+2 Level +1, +2 Šema razvoda instalacije bolničke signalizacije L+1, L+2 - EC402B-27 582_CCN3_2B_27_D_EC402B_08
Building 27 Diagram Diagram of Intercom system Main diagram Šema razvoda instalacije interkoma - EC402C-27 582_CCN3_2B_27_D_EC402C_08
Building 27 Diagram Diagram of DECT system Main diagram Šema razvoda instalacije DECT sistema - EC402D-27 582_CCN3_2B_27_D_EC402D_08

Building 27 Plan Comm. system - Nurse call, intercom and DECT systems Level -1 / Part A Bolnička signalizacija , Interkom i DECT Nivo -1 / Deo A 1:100 EC105A-27 582_CCN3_2B_27_D_EC105_08
Building 27 Plan Comm. system - Nurse call, intercom and DECT systems Level -1 / Part B Bolnička signalizacija , Interkom i DECT Nivo -1 / Deo B 1:100 EC105B-27 582_CCN3_2B_27_D_EC105_08
Building 27 Plan Comm. system - Nurse call, intercom and DECT systems Level ±0 / Part A Bolnička signalizacija , Interkom i DECT Nivo ±0 / Deo A 1:100 EC106A-27 582_CCN3_2B_27_D_EC106_08
Building 27 Plan Comm. system - Nurse call, intercom and DECT systems Level ±0 / Part B Bolnička signalizacija , Interkom i DECT Nivo ±0 / Deo B 1:100 EC106B-27 582_CCN3_2B_27_D_EC106_08
Building 27 Plan Comm. system - Nurse call, intercom and DECT systems Level +1 / Part A Bolnička signalizacija , Interkom i DECT Nivo +1 / Deo A 1:100 EC107A-27 582_CCN3_2B_27_D_EC107_08
Building 27 Plan Comm. system - Nurse call, intercom and DECT systems Level +1 / Part B Bolnička signalizacija , Interkom i DECT Nivo +1 / Deo B 1:100 EC107B-27 582_CCN3_2B_27_D_EC107_08
Building 27 Plan Comm. system - Nurse call, intercom and DECT systems Level +2 / Part A Bolnička signalizacija , Interkom i DECT Nivo +2 / Deo A 1:100 EC108A-27 582_CCN3_2B_27_D_EC108_08
Building 27 Plan Comm. system - Nurse call, intercom and DECT systems Level +2 / Part B Bolnička signalizacija , Interkom i DECT Nivo +2 / Deo B 1:100 EC108B-27 582_CCN3_2B_27_D_EC108_08
5 COPYBOOK 5 - SATELITE MASTER TV - MASTER CLOCK SYSTEM
Site Plan Situacija EC010 582_CCN3_2B_27_D_EC010_08

Building 27 Diagram Comm. system - SMATV system Main diagram SMATV sistem glavna blok šema - EC403A-27 582_CCN3_2B_27_D_EC403_08
Building 27 Diagram Comm. system - SMATV system - L-01 and L+00 Main diagram SMATV sistem - L-01 and L+00 - EC403B-27 582_CCN3_2B_27_D_EC403_09
Building 27 Diagram Comm. system - SMATV system - L+01 and L+02 Main diagram SMATV sistem - L+01 and L+02 - EC403C-27 582_CCN3_2B_27_D_EC403_10
Building 27 Diagram Comm. system - Master clock system Main diagram Šema razvoda instalacije centralnog sata - EC404-27 582_CCN3_2B_27_D_EC404_08

Building 27 Plan Communication systems (SMATV, Master clock system) Level -1 / Part A Distribucija TV signala i centralni sat Nivo -1 / Deo A 1:100 EC109A-27 582_CCN3_2B_27_D_EC109_08
Building 27 Plan Communication systems (SMATV, Master clock system) Level -1 / Part B Distribucija TV signala i centralni sat Nivo -1 / Deo B 1:100 EC109B-27 582_CCN3_2B_27_D_EC109_08
Building 27 Plan Communication systems (SMATV, Master clock system) Level ±0 / Part A Distribucija TV signala i centralni sat Nivo ±0 / Deo A 1:100 EC110A-27 582_CCN3_2B_27_D_EC110_08
Building 27 Plan Communication systems (SMATV, Master clock system) Level ±0 / Part B Distribucija TV signala i centralni sat Nivo ±0 / Deo B 1:100 EC110B-27 582_CCN3_2B_27_D_EC110_08
Building 27 Plan Communication systems (SMATV, Master clock system) Level +1 / Part A Distribucija TV signala i centralni sat Nivo +1 / Deo A 1:100 EC111A-27 582_CCN3_2B_27_D_EC111_08
Building 27 Plan Communication systems (SMATV, Master clock system) Level +1 / Part B Distribucija TV signala i centralni sat Nivo +1 / Deo B 1:100 EC111B-27 582_CCN3_2B_27_D_EC111_08
Building 27 Plan Communication systems (SMATV, Master clock system) Level +2 / Part A Distribucija TV signala i centralni sat Nivo +2 / Deo A 1:100 EC112A-27 582_CCN3_2B_27_D_EC112_08
Building 27 Plan Communication systems (SMATV, Master clock system) Level +2 / Part B Distribucija TV signala i centralni sat Nivo +2 / Deo B 1:100 EC112B-27 582_CCN3_2B_27_D_EC112_08
5 COPYBOOK 6 - SECURITY SYSTEMS: CCTV, ACCESS CONTROL AND INTRUSION DETECTION, AV DOOR ENTRY SYSTEM
Site Plan Situacija EC010 582_CCN3_2B_27_D_EC010_08

Building 27 Diagram Security system - Access control and intrusion detection systems Main diagram Tehnički sistemi zaštite, Kontrola pristupa i protiv-provala - EC406-27 582_CCN3_2B_27_D_EC406_08
Building 27 Diagram Block diagram - campus network CCTV cables Main diagram Blok šema kompleksa - CCTV - kablovska instalacija - EC407A-27 582_CCN3_2B_27_D_EC407_08
Building 27 Diagram Security system - Closed circuit television systems Main diagram Tehnički sistemi zaštite-CCTV - EC407B-27 582_CCN3_2B_27_D_EC407_08
Building 27 Diagram Security system - Audio/Video entry system Main diagram Šema razvoda instalacije audio i video interfona - EC408-27 582_CCN3_2B_27_D_EC408_08

Building 27 Plan system) Level -1 / Part A Tehnički sistemi zaštite-medicinski CCTV i CCTV za operacione sale 1:100 EC113A-27 582_CCN3_2B_27_D_EC113_08
y y ( y y
Building 27 Plan system) Level -1 / Part B Tehnički sistemi zaštite-medicinski CCTV i CCTV za operacione sale 1:100 EC113B-27 582_CCN3_2B_27_D_EC113_08
y y ( y y
Building 27 Plan system) Level ±0 / Part A Tehnički sistemi zaštite-medicinski CCTV i CCTV za operacione sale 1:100 EC114A-27 582_CCN3_2B_27_D_EC114_08
(
Building 27 Plan system) Level ±0 / Part B Tehnički sistemi zaštite-medicinski CCTV i CCTV za operacione sale 1:100 EC114B-27 582_CCN3_2B_27_D_EC114_08
Building 27 Plan system) Level +1 / Part A Tehnički sistemi zaštite-medicinski CCTV i CCTV za operacione sale 1:100 EC115A-27 582_CCN3_2B_27_D_EC115_08
Building 27 Plan system) Level +1 / Part B Tehnički sistemi zaštite-medicinski CCTV i CCTV za operacione sale 1:100 EC115B-27 582_CCN3_2B_27_D_EC115_08
Building 27 Plan system) Level +2 / Part A Tehnički sistemi zaštite-medicinski CCTV i CCTV za operacione sale 1:100 EC116A-27 582_CCN3_2B_27_D_EC116_08
Building 27 Plan system) Level +2 / Part B Tehnički sistemi zaštite-medicinski CCTV i CCTV za operacione sale 1:100 EC116B-27 582_CCN3_2B_27_D_EC116_08
5 BOOK 3 - DETAILED DESIGN OF SAFETY SYSTEMS: FIRE DETECTION AND SOUND DIFFUSION
5 COPYBOOK 1 - TEXTUAL DOCUMENTATION
5 Part 1 - General Documents
Building 27 Report The decision on registration of a project organization Rešenje o registraciji projektne organizacije
Building 27 Report The decision on appointment of responsible designer Rešenje o imenovanju odgovornog projektanta
Building 27 Report License of responsible designer and a certificate of membership IKS Licenca odgovornog projektanta i potvrda članstva IKS
Building 27 Report Statement by the responsible project compliance Izjava odgovornog projektanta o poštovanju propisa
Building 27 Report Consent of the Client / Investor with the technical documentation Saglasnost Naručioca / Investitora sa Tehničkom dokumentacijom
Building 27 Report Statement of Compliance responsible mutual designers Izjava o medjusobnoj usaglašenosti odgovornih projektanata
5 Part 2 - Project Brief
Building 27 Project brief Projektni zadatak
5 Part 3 - Technical reports
Building 27 Report Technical description Tehnički opis ES001-27 582_CCN3_2B_27_R_ES001_08
Building 27 Report Calculations Tehnički proračuni - ES002-27 582_CCN3_2B_27_R_ES002_08
Building 27 Report Technical conditions Tehnički uslovi ES003-27 582_CCN3_2B_27_R_ES003_08
Building 27 Report Safety on work report Prilog o bezbednosti i zdravlju na radu ES004-27 582_CCN3_2B_27_R_ES004_08
Building 27 Report List of regulations and standards Spisak primenjenih stadnarda, propisa i literature ES005-27 582_CCN3_2B_27_R_ES005_08
DOCUMENT LIST STAGE III: Design and Tender documents Phase 2: Detailed Design and Tender Documents Step B : Draft Detailed Design Proposal CLINICAL CENTER OF NIS - CCN Nis
BUILDING 27

Document
Deliver on Volume Book Section Prog. Building Type English Description Level Serbian Description Scale File Name
Name

5 Part 4 - BoQ
Report Technical Specifications Tehnička specifikacija ES000-27 582_CCV3_2B_27_R_ES000_08
Building 27 Report BoQ - Safety systems Predmer i predračun radova ES020-27 582_CCV3_2B_27_R_ES020_08
5 BOOK 3 - DETAILED DESIGN OF SAFETY SYSTEMS: FIRE DETECTION AND SOUND DIFFUSION
5 COPYBOOK 2 - GRAPHICAL DOCUMENTATION
Site Plan Situacija ES010 582_CCN3_2B_27_R_ES010_08
General legend Legenda ES011 582_CCN3_2B_27_R_ES011_08

Building 27 Diagram Vertical digram of Fire detection system and extinguishing system Diagram Šema vertikalnog razvoda instalacije automatske dojave požara i gašenja - ES401A-27 582_CCN3_2B_27_D_ES401A_08
Building 27 Diagram Diagram of Fire detection system and extinguishing system L-1, L+0 Diagram Šema razvoda instalacije automatske dojave požara i gašenja nivoi -1 i +0 - ES401B-27 582_CCN3_2B_27_D_ES401B_08
Diagram of Fire detection system and extinguishing system L+1, L+2, Technical floor Diagram Šema razvoda instalacije automatske dojave požara i gašenja nivoi +1,+2 i Tehnička
Building 27 Diagram etaža - ES401C-27 582_CCN3_2B_27_D_ES401C_08

Building 27 Diagram Safety system - Fire detection - Executive functions-Level -1 Level -1 Dojava požara - izvršne funkcije - Nivo -1 ES401D-27 582_CCN3_2B_27_D_ES401D_08
Building 27 Diagram Safety system - Fire detection - Executive functions-Level+0 Level +0 Dojava požara - izvršne funkcije - Nivo +0 ES401E-27 582_CCN3_2B_27_D_ES401E_08
Building 27 Diagram Safety system - Fire detection - Executive functions-Level+1 Level +1 Dojava požara - izvršne funkcije - Nivo +1 ES401F-27 582_CCN3_2B_27_D_ES401F_08
Building 27 Diagram Safety system - Fire detection - Executive functions-Level+2, L+3 Level +2, +3 Dojava požara - izvršne funkcije - Nivo +2, +3 ES401G-27 582_CCN3_2B_27_D_ES401G_08
Building 27 Detail Alarm plan Detalj Alarmni plan ES401H-27 582_CCN3_2B_27_D_ES401H_08
Building 27 Detail Detail - Fire detector mounting, and passing of cables through fire wall Detalj Detalj montaže javljača i prolaska kablova kroz požarni zid ES401I-27 582_CCN3_2B_27_D_ES401I_08
Building 27 Detail Detail - Typical single line diagram of dampers power supply and controling Detalj Tipska šema napajanja i upravljanja klapnama ES401J-27 582_CCN3_2B_27_D_ES401J_08
Building 27 Detail Detail - Typical distribution boards for executive functions of FD system Detalj Tipski ormani za smeštaj opreme za izvršne funkcije sistema dojave požara ES401K.1-27 582_CCN3_2B_27_D_ES401K.1_08
Building 27 Detail Detail - Typical distribution boards for executive functions of FD system Detalj Tipski ormani za smeštaj opreme za izvršne funkcije sistema dojave požara ES401K.2-27 582_CCN3_2B_27_D_ES401K.2_08
Building 27 Detail Distribution board for shuting down power supply in building Detalj Orman za gašenje napajanja u objektu ES401L-27 582_CCN3_2B_27_D_ES401L_08

Building 27 Diagram Safety system -Vertical digram of Sound diffusion system Diagram Šema vertikalnog razvoda instalacije ozvučenja - ES402A-27 582_CCN3_2B_27_D_ES402A_08

Building 27 Diagram Block diagram-sound diffusion system Diagram Šema razvoda instalacije ozvučenja - ES402B-27 582_CCN3_2B_27_D_ES402B_08

Building 27 Plan Safety system - Fire detection system, Sound diffusion system Level -1 / Part A Sistemi automatske dojave i gašenja požara i ozvučenja - Nivo -1 / Deo A 1:100 ES101A-27 582_CCN3_2B_27_D_ES101_08
Building 27 Plan Safety system - Fire detection system, Sound diffusion system Level -1 / Part B Sistemi automatske dojave i gašenja požara i ozvučenja - Nivo -1 / Deo B 1:100 ES101B-27 582_CCN3_2B_27_D_ES101_08
Building 27 Plan Safety system - Fire detection system, Sound diffusion system Level ±0 / Part A Sistemi automatske dojave i gašenja požara i ozvučenja - Nivo ±0 / Deo A 1:100 ES102A-27 582_CCN3_2B_27_D_ES102_08
Building 27 Plan Safety system - Fire detection system, Sound diffusion system Level ±0 / Part B Sistemi automatske dojave i gašenja požara i ozvučenja - Nivo ±0 / Deo B 1:100 ES102B-27 582_CCN3_2B_27_D_ES102_08
Building 27 Plan Safety system - Fire detection system, Sound diffusion system Level +1 / Part A Sistemi automatske dojave i gašenja požara i ozvučenja - Nivo +1 / Deo A 1:100 ES103A-27 582_CCN3_2B_27_D_ES103_08
Building 27 Plan Safety system - Fire detection system, Sound diffusion system Level +1 / Part B Sistemi automatske dojave i gašenja požara i ozvučenja - Nivo +1 / Deo B 1:100 ES103B-27 582_CCN3_2B_27_D_ES103_08
Building 27 Plan Safety system - Fire detection system, Sound diffusion system Level +2 / Part A Sistemi automatske dojave i gašenja požara i ozvučenja - Nivo +2 / Deo A 1:100 ES104A-27 582_CCN3_2B_27_D_ES104_08
Building 27 Plan Safety system - Fire detection system, Sound diffusion system Level +2 / Part B Sistemi automatske dojave i gašenja požara i ozvučenja - Nivo +2 / Deo B 1:100 ES104B-27 582_CCN3_2B_27_D_ES104_08
Building 27 Plan Safety system - Fire detection system, Sound diffusion system Roof level / Part A Sistemi automatske dojave i gašenja požara i ozvučenja - osnova krova / Deo A 1:100 ES105A-27 582_CCN3_2B_27_D_ES105_08
Building 27 Plan Safety system - Fire detection system, Sound diffusion system Roof level / Part B Sistemi automatske dojave i gašenja požara i ozvučenja - osnova krova / Deo B 1:100 ES105B-27 582_CCN3_2B_27_D_ES105_08

Building 27 Plan Safety system - Fire detection - Executive functions Level -1 / Part A Dojava požara-izvršne funkcije - Nivo -1 / Deo A 1:100 ES106A-27 582_CCN3_2B_27_D_ES106_08
Building 27 Plan Safety system - Fire detection - Executive functions Level -1 / Part B Dojava požara-izvršne funkcije - Nivo -1 / Deo B 1:100 ES106B-27 582_CCN3_2B_27_D_ES106_08
Building 27 Plan Safety system - Fire detection - Executive functions Level ±0 / Part A Dojava požara-izvršne funkcije - Nivo ±0 / Deo A 1:100 ES107A-27 582_CCN3_2B_27_D_ES107_08
Building 27 Plan Safety system - Fire detection - Executive functions Level ±0 / Part B Dojava požara-izvršne funkcije - Nivo ±0 / Deo B 1:100 ES107B-27 582_CCN3_2B_27_D_ES107_08
Building 27 Plan Safety system - Fire detection - Executive functions Level +1 / Part A Dojava požara-izvršne funkcije - Nivo +1 / Deo A 1:100 ES108A-27 582_CCN3_2B_27_D_ES108_08
Building 27 Plan Safety system - Fire detection - Executive functions Level +1 / Part B Dojava požara-izvršne funkcije - Nivo +1 / Deo B 1:100 ES108B-27 582_CCN3_2B_27_D_ES108_08
Building 27 Plan Safety system - Fire detection - Executive functions Level +2 / Part A Dojava požara-izvršne funkcije - Nivo +2 / Deo A 1:100 ES109A-27 582_CCN3_2B_27_D_ES109_08
Building 27 Plan Safety system - Fire detection - Executive functions Level +2 / Part B Dojava požara-izvršne funkcije - Nivo +2 / Deo B 1:100 ES109B-27 582_CCN3_2B_27_D_ES109_08
Building 27 Plan Safety system - Fire detection - Executive functions Roof level / Part A Dojava požara-izvršne funkcije - osnova krova / Deo A 1:100 ES110A-27 582_CCN3_2B_27_D_ES110_08
Building 27 Plan Safety system - Fire detection - Executive functions Roof level / Part B Dojava požara-izvršne funkcije - osnova krova / Deo B 1:100 ES110B-27 582_CCN3_2B_27_D_ES110_08
5 BOOK 4 - DETAILED DESIGN OF BMS IN BUILDING 27
5 COPYBOOK 1 - TEXTUAL AND GRAPHICAL DOCUMENTATION
5 Part 1 - General Documents
Building 27 Report The decision on registration of a project organization Rešenje o registraciji projektne organizacije
Building 27 Report The decision on appointment of responsible designer Rešenje o imenovanju odgovornog projektanta
Building 27 Report License of responsible designer and a certificate of membership IKS Licenca odgovornog projektanta i potvrda članstva IKS
Building 27 Report Statement by the responsible project compliance Izjava odgovornog projektanta o poštovanju propisa
Building 27 Report Consent of the Client / Investor with the technical documentation Saglasnost Naručioca / Investitora sa Tehničkom dokumentacijom
Building 27 Report Statement of Compliance responsible mutual designers Izjava o medjusobnoj usaglašenosti odgovornih projektanata
5 Part 2 - Project Brief
Building 27 Project brief Projektni zadatak
DOCUMENT LIST STAGE III: Design and Tender documents Phase 2: Detailed Design and Tender Documents Step B : Draft Detailed Design Proposal CLINICAL CENTER OF NIS - CCN Nis
BUILDING 27

Document
Deliver on Volume Book Section Prog. Building Type English Description Level Serbian Description Scale File Name
Name

5 Part 3 - Technical reports


Building 27 Report Technical description Tehnički opis - EH001-27 582_CCN3_2B_27_R_EH001_05
Building 27 Report Calculations Proračuni - EH002-27 582_CCN3_2B_27_R_EH002_05
Building 27 Report Technical conditions Tehnički uslovi - EH003-27 582_CCN3_2B_27_R_EH003_05
Building 27 Report Safety on work report Prilog o bezbednosti i zdravlju na radu - EH004-27 582_CCN3_2B_27_R_EH004_05
Building 27 Report List of regulations and standards Spisak korišćenih standarda, propisa i literature - EH005-27 582_CCN3_2B_27_R_EH005_05
Building 28 Report Technical Specifications Tehnička specifikacija EH000-27 582_CCN3_2B_27_R_EH000_05
Building 27 Report BoQ - Building Management System Predmer i predračun radova EH020-27 582_CCN3_2B_27_R_EH020_05
5 COPYBOOK 2 - GRAPHICAL DOCUMENTATION

Building 27 Diagram General BMS diagram Diagram Principska šema povezivanja BMS - EH400-27 582_CCN3_2B_27_D_EH400_05
Building 27 Details General BMS Diagram L-01 Diagram Principska šema povezivanja BMS, L-01 EH401-27 582_CCN3_2B_27_D_EH401_405_05
Building 27 Details General BMS Diagram L+00 Diagram Principska šema povezivanja BMS, L+00 EH402-27 582_CCN3_2B_27_D_EH401_405_05
Building 27 Details General BMS Diagram L+01 Diagram Principska šema povezivanja BMS, L+01 EH403-27 582_CCN3_2B_27_D_EH401_405_05
Building 27 Details General BMS Diagram L+02 Diagram Principska šema povezivanja BMS, L+02 EH404-27 582_CCN3_2B_27_D_EH401_405_05
Building 27 Details General BMS Diagram L+03 Diagram Principska šema povezivanja BMS, L+03 EH405-27 582_CCN3_2B_27_D_EH401_405_05

Building 27 Plan Communication system L-01 Level -1 / Part A Sistem za komunikaciju L-01 1:100 EH106A-27 582_CCN3_2B_27_D_EH106_05
Building 27 Plan Communication system L-01 Level -1 / Part B Sistem za komunikaciju L-01 1:100 EH1061B-27 582_CCN3_2B_27_D_EH106_05
Building 27 Plan Communication system L+00 Level ±0 / Part A Sistem za komunikaciju L+00 1:100 EH107A-27 582_CCN3_2B_27_D_EH107_05
Building 27 Plan Communication system L+00 Level ±0 / Part B Sistem za komunikaciju L+00 1:100 EH107B-27 582_CCN3_2B_27_D_EH107_05
Building 27 Plan Communication system L+01 Level +1 / Part A Sistem za komunikaciju L+01 1:100 EH108A-27 582_CCN3_2B_27_D_EH108_05
Building 27 Plan Communication system L+01 Level +1 / Part B Sistem za komunikaciju L+01 1:100 EH108B-27 582_CCN3_2B_27_D_EH108_05
Building 27 Plan Communication system L+02 Level +2 / Part A Sistem za komunikaciju L+02 1:100 EH109A-27 582_CCN3_2B_27_D_EH109_05
Building 27 Plan Communication system L+02 Level +2 / Part B Sistem za komunikaciju L+02 1:100 EH109B-27 582_CCN3_2B_27_D_EH109_05
Building 27 Plan Communication system L+03 Level +2 / Part A Sistem za komunikaciju L+03 1:100 EH110A-27 582_CCN3_2B_27_D_EH110_05
Building 27 Plan Communication system L+03 Level +2 / Part B Sistem za komunikaciju L+03 1:100 EH1010B-27 582_CCN3_2B_27_D_EH110_05

Building 27 Plan Electrical installation in mechanical substation Level L-1 Elektro instalacija u podstanici – osnova podstanice - EH120-27 582_CCN3_2B_ET_D_EH120_05

Building 27 Diagram Distribution boards Three pole diagrams - GENERAL NOTES Diagram Tropolne šeme - OPŠTE NAPOMENE EH451-27 582_CCN3_2B_27_ET_D_EH450_457_05
Building 27 Diagram Three pole diagram GRO_27/L-01/TEC-03 Diagram Tropolne šeme GRO_27/L-01/TEC-03 EH451-27 582_CCN3_2B_27_ET_D_EH450_457_05
Building 27 Diagram Three pole diagram RO_27/L-01/TEC-03.BM Diagram Tropolne šeme RO_27/L-01/TEC-03.BM EH452-27 582_CCN3_2B_27_ET_D_EH450_457_05
Building 27 Diagram Three pole diagram GRO_27/L+03/TEC-01 Diagram Tropolne šeme GRO_27/L+03/TEC-01 EH453-27 582_CCN3_2B_27_ET_D_EH450_457_05
Building 27 Diagram Three pole diagram GRO_27/L+02/TEC-02 Diagram Tropolne šeme GRO_27/L+02/TEC-02 EH454-27 582_CCN3_2B_27_ET_D_EH450_457_05
Building 27 Diagram Three pole diagram GRO_27/L+02/SS(FF) Diagram Tropolne šeme GRO_27/L+02/SS(FF) EH455-27 582_CCN3_2B_27_ET_D_EH450_457_05
Building 27 Diagram Three pole diagram RO_27/TEC.01 Diagram Tropolne šeme RO_27/TEC.01 EH456-27 582_CCN3_2B_27_ET_D_EH450_457_05
Building 27 Diagram Three pole diagram GRO_27/L+02/LI.FF-01 Diagram Tropolne šeme GRO_27/L+02/LI.FF-01 EH457-27 582_CCN3_2B_27_ET_D_EH450_457_05

Building 27 Diagram Mechanical equipment connection diagram Diagram Mašinske šeme povezivanja opreme EH461M-27 582_CCN3_2B_27_ET_D_EH461M_05
Building 27 Diagram Mechanical equipment connection diagram in mechanical substation Diagram Mašinske šeme povezivanja opreme u toplotnoj podstanici EH462M-27 582_CCN3_2B_27_ET_D_EH462M_05

Building 29 Details Connection diagram of light controller Detalji El. šema povezivanja kontrolera osvetljenja EH471-27 582_CCN3_2B_27_D_EH470_476_05
Building 30 Details Connection diagram of mechanical equipment - Diagram 1 Detalji Električna šema 1 povezivanja mašinske opreme EH472-27 582_CCN3_2B_27_D_EH470_476_05
Building 31 Details Connection diagram of mechanical equipment - Diagram 2 Detalji Električna šema 2 povezivanja mašinske opreme EH473-27 582_CCN3_2B_27_D_EH470_476_05
Building 32 Details Connection diagram of mechanical equipment - Diagram 6 Detalji Električna šema 6 povezivanja mašinske opreme EH474-27 582_CCN3_2B_27_D_EH470_476_05
Building 33 Details Connection diagram of mechanical equipment - Diagram 8 Detalji Električna šema 8 povezivanja mašinske opreme EH475-27 582_CCN3_2B_27_D_EH470_476_05
Building 34 Details Connection diagram of mechanical equipment - Diagram 9 Detalji Električna šema 9 povezivanja mašinske opreme EH476-27 582_CCN3_2B_27_D_EH470_476_05
Building 35 Details Cable trays installation - detail Detalji Detalj postavljanja nosača kablova EH481-27 582_CCN3_2B_27_D_EH481_05
DOCUMENT LIST STAGE III: Design and Tender documents Phase 2: Detailed Design and Tender Documents Step B : Draft Detailed Design Proposal CLINICAL CENTER OF NIS - CCN Nis
BUILDING 28A

Document
Deliver on Volume Book Section Prog. Building Type English Description Level Serbian Description Scale File Name
Name

5 VOLUME 5 - ELECTRICAL INSTALLATIONS


5 BOOK 1 - DETAILED DESIGN OF LOW VOLTAGE INSTALLATION IN BUILDING 28 A
5 COPYBOOK 1 - TEXTUAL DOCUMENTATION
5 Part 1 - General Documents
Building 28A Report The decision on registration of a project organization Rešenje o registraciji projektne organizacije
Building 28A Report The decision on appointment of responsible designer Rešenje o imenovanju odgovornog projektanta
Building 28A Report License of responsible designer and a certificate of membership IKS Licenca odgovornog projektanta i potvrda članstva IKS
Building 28A Report Statement by the responsible project compliance Izjava odgovornog projektanta o poštovanju propisa
Building 28A Report Consent of the Client / Investor with the technical documentation Saglasnost Naručioca / Investitora sa Tehničkom dokumentacijom
Building 28A Report Statement of Compliance responsible mutual designers Izjava o medjusobnoj usaglašenosti odgovornih projektanata
5 Part 2 - Project Brief
Building 28A Report Project brief Projektni zadatak
5 Part 3 - Technical reports
Building 28A Report Technical description Tehnički opis EI001-28A 582_CCN3_2B_28A_R_EI001_05
Building 28A Report Technical Calculations Tehnički proračuni - EI002-28A 582_CCN3_2B_28A_R_EI002_05
Building 28A Report General and technical requirements for performing electric power installation Tehnički uslovi EI003-28A 582_CCN3_2B_28A_R_EI003_05
Building 28A Report Report on safety and health at work work Prilog o bezbednosti i zdravlju na radu EI004-28A 582_CCN3_2B_28A_R_EI004_05
Building 28A Report List of used technical standards and norms regulations Spisak primenjenih stadnarda, propisa i literature EI005-28A 582_CCN3_2B_28A_R_EI005_05
Building 28A Report Cable list Kabl lista EI006-28A 582_CCN3_2B_28A_R_EI006_05
5 COPYBOOK 2 - BILL OF QUANTITIES
Report Technical Specifications Tehnička specifikacija EI000-28A 582_CCN3_2B_28A_R_EI000_05
Building 28A Report BoQ - Electrical installation Predmer i predračun radova EI020-28A 582_CCN3_2B_28A_R_EI020_05
5 COPYBOOK 3 - GRAPHICAL PART - LAYOUTS
Plan Site Plan Situacija EI010 582_CCN3_2B_28A_D_EI010_05
Legend General legend Opšta legenda EI011 582_CCN3_2B_28A_D_EI011_05
Building 28A Diagram General LV distribution diagram Glavna šema NN razvoda - EI401 582_CCN3_2B_28A_D_EI401_05
Building 28A Diagram Earthing and LPS Blok šema uzemljenja i izjednačenja potencijala - EI402 582_CCN3_2B_28A_D_EI402_05

Building 28A Plan Electrical distribution Level -1 Dispozicija glavnog NN razvoda 1:100 EI101-28A 582_CCN3_2B_28A_D_EI101_05
Building 28A Plan Electrical distribution Level +0 Dispozicija glavnog NN razvoda 1:100 EI102-28A 582_CCN3_2B_28A_D_EI102_05
Building 28A Plan Electrical distribution Level +1 Dispozicija glavnog NN razvoda 1:100 EI103-28A 582_CCN3_2B_28A_D_EI103_05
Building 28A Plan Electrical distribution Level +2 Dispozicija glavnog NN razvoda 1:100 EI104-28A 582_CCN3_2B_28A_D_EI104_05
Building 28A Plan Electrical distribution Level +3 Dispozicija glavnog NN razvoda 1:100 EI105-28A 582_CCN3_2B_28A_D_EI105_05
Building 28A Plan Electrical distribution Level +4 Dispozicija glavnog NN razvoda 1:100 EI106-28A 582_CCN3_2B_28A_D_EI106_05
Building 28A Plan Electrical distribution Level +5 Dispozicija glavnog NN razvoda 1:100 EI107-28A 582_CCN3_2B_28A_D_EI107_05
Building 28A Plan Electrical distribution Technical level Dispozicija glavnog NN razvoda 1:100 EI108-28A 582_CCN3_2B_28A_D_EI108_05

Building 28A Plan Lighting Level -1 Instalacija osvetljenja 1:100 EI109-28A 582_CCN3_2B_28A_D_EI109_05
Building 28A Plan Lighting Level +0 Instalacija osvetljenja 1:100 EI110-28A 582_CCN3_2B_28A_D_EI110_05
Building 28A Plan Lighting Level +1 Instalacija osvetljenja 1:100 EI111-28A 582_CCN3_2B_28A_D_EI111_05
Building 28A Plan Lighting Level +2 Instalacija osvetljenja 1:100 EI112-28A 582_CCN3_2B_28A_D_EI112_05
Building 28A Plan Lighting Level +3 Instalacija osvetljenja 1:100 EI113-28A 582_CCN3_2B_28A_D_EI113_05
Building 28A Plan Lighting Level +4 Instalacija osvetljenja 1:100 EI114-28A 582_CCN3_2B_28A_D_EI114_05
Building 28A Plan Lighting Level +5 Instalacija osvetljenja 1:100 EI115-28A 582_CCN3_2B_28A_D_EI115_05
Building 28A Plan Lighting Technical level Instalacija osvetljenja 1:100 EI116-28A 582_CCN3_2B_28A_D_EI116_05

Building 28A Plan Power socket outlets Level -1 Instalacija el. uticnica 1:100 EI117-28A 582_CCN3_2B_28A_D_EI117_05
Building 28A Plan Power socket outlets Level +0 Instalacija el. uticnica 1:100 EI118-28A 582_CCN3_2B_28A_D_EI118_05
Building 28A Plan Power socket outlets Level +1 Instalacija el. uticnica 1:100 EI119-28A 582_CCN3_2B_28A_D_EI119_05
Building 28A Plan Power socket outlets Level +2 Instalacija el. uticnica 1:100 EI120-28A 582_CCN3_2B_28A_D_EI120_05
Building 28A Plan Power socket outlets Level +3 Instalacija el. uticnica 1:100 EI121-28A 582_CCN3_2B_28A_D_EI121_05
Building 28A Plan Power socket outlets Level +4 Instalacija el. uticnica 1:100 EI122-28A 582_CCN3_2B_28A_D_EI122_05
Building 28A Plan Power socket outlets Level +5 Instalacija el. uticnica 1:100 EI123-28A 582_CCN3_2B_28A_D_EI123_05
Building 28A Plan Power socket outlets Technical level Instalacija el. uticnica 1:100 EI124-28A 582_CCN3_2B_28A_D_EI124_05

Building 28A Site plan Earthing and Lightning Protection - EPP Site plan Gromobran i uzemljenje - ekvivalentna površina 1:1000 EI130-28A 582_CCN3_2B_28A_D_EI_130_05
Building 28A Plan Earthing and Lightning Protection Foundation Foundation Gromobran i uzemljenje - temelj 1:100 EI131-28A 582_CCN3_2B_28A_D_EI_131_05
Building 28A Facade Earthing and Lightning Protection Facade 1 Fasade 1 Gromobran i uzemljenje - Fasada 1 1:100 EI132-28A 582_CCN3_2B_28A_D_EI_132_05
Building 28A Facade Earthing and Lightning Protection Facade 2 Fasade 2 Gromobran i uzemljenje - Fasada 2 1:100 EI133-28A 582_CCN3_2B_28A_D_EI_133_05
Building 28A Facade Earthing and Lightning Protection Facade 3 Fasade 3 Gromobran i uzemljenje - Fasada 3 1:100 EI134-28A 582_CCN3_2B_28A_D_EI_134_05
Building 28A Facade Earthing and Lightning Protection Facade 4 Fasade 4 Gromobran i uzemljenje - Fasada 4 1:100 EI135-28A 582_CCN3_2B_28A_D_EI_135_05
Building 28A Plan Earthing and Lightning Protection Roof Level Roof Gromobran i uzemljenje - Nivo krova 1:100 EI136-28A 582_CCN3_2B_28A_D_EI_136_05

Building 28A Details Electrical installation Detalji - EI201-28A 582_CCN3_2B_28A_D_EI201_05


Building 28A Sections Front view Prednji izgledi - EI202-28A 582_CCN3_2B_28A_D_EI202_05
Building 28A Details Sections L-01, L+00, L+01 Detalji - Preseci L-01, L+00, L+01 - EI203.1-28A 582_CCN3_2B_28A_D_EI203_05
Building 28A Details Sections L+02, L+03, L+04, L+05 Detalji - Preseci L+02, L+03, L+04, L+05 - EI203.2-28A 582_CCN3_2B_28A_D_EI203_05
5 COPYBOOK 4 - GRAPHICAL PART - DISTRIBUTION BOARDS
Building 28A Scheme Switchboards (SMDB_...) One line scheme Jednopolne šeme glavnih razvodnih ormana (GRO/SMDB) - EB400-28A 582_CCN3_2B_28A_D_EB400_05
EB401-EB4..
Building 28A Scheme Typical Final Distribution Boards (FDB) One line scheme Jednopolne šeme tipskih krajnjih razvodnih tabli (RT/FDB) - EF400-28A 582_CCN3_2B_28A_D_EF400_05
EF401-EF4..
5 BOOK 2 - DETAILED DESIGN OF COMMUNICATION AND SIGNAL INSTALLATION IN BUILDING 28 A

1 November 2011
DOCUMENT LIST STAGE III: Design and Tender documents Phase 2: Detailed Design and Tender Documents Step B : Draft Detailed Design Proposal CLINICAL CENTER OF NIS - CCN Nis
BUILDING 28A

Document
Deliver on Volume Book Section Prog. Building Type English Description Level Serbian Description Scale File Name
Name

5 COPYBOOK 1 - TEXTUAL DOCUMENTATION


5 Part 1 - General Documents
Building 28A Report The decision on registration of a project organization Rešenje o registraciji projektne organizacije
Building 28A Report The decision on appointment of responsible designer Rešenje o imenovanju odgovornog projektanta
Building 28A Report License of responsible designer and a certificate of membership IKS Licenca odgovornog projektanta i potvrda članstva IKS
Building 28A Report Statement by the responsible project compliance Izjava odgovornog projektanta o poštovanju propisa
Building 28A Report Consent of the Client / Investor with the technical documentation Saglasnost Naručioca / Investitora sa Tehničkom dokumentacijom
Building 28A Report Statement of Compliance responsible mutual designers Izjava o medjusobnoj usaglašenosti odgovornih projektanata
5 Part 2 - Project Brief
Building 28A Project brief Projektni zadatak
5 Part 3 - Technical reports
Building 28A Report Technical description Tehnički opis EC001-28A 582_CCN3_2B_28A_R_EC001_08
Building 28A Report Calculations Tehnički proračuni - EC002-28A 582_CCN3_2B_28A_R_EC002_08
Building 28A Report Technical conditions Tehnički uslovi EC003-28A 582_CCN3_2B_28A_R_EC003_08
Building 28A Report Safety on work report Prilog o bezbednosti i zdravlju na radu EC004-28A 582_CCN3_2B_28A_R_EC004_08
Building 28A Report Cable list Kabl lista EC005-28A 582_CCN3_2B_28A_R_EC005_08
Building 28A Report List of regulations and standards Spisak primenjenih stadnarda, propisa i literature EC006-28A 582_CCN3_2B_28A_R_EC006_08
5 COPYBOOK 2 - BILL OF QUANTITIES
Building 28A Report Technical Specifications Tehnička specifikacija EC000-28A 582_CCN3_2B_28A_R_EC000_08
Building 28A Report BoQ - Telecommunication and signaling installation Predmer i predračun radova EC020-28A 582_CCN3_2B_28A_R_EC020_08
5 COPYBOOK 3 - STRUCTURED CABLING SYSTEM
Site Plan Situacija EC010 582_CCN3_2B_28A_R_EC010_08

Building 28A Diagram Block diagram - Campus network - SCS system Main diagram Blok šema kompleksa - SKS sistem - EC401.1-28A 582_CCN3_2B_28A_D_EC401_08
Building 28A Diagram Block diagram - Campus network - telephony - PBX system Main diagram Blok šema kompleksa - Telefonski sistem - EC401.2-28A 582_CCN3_2B_28A_D_EC401_08
Building 28A Diagram Block diagram - SCS system Main diagram Blok šema - SKS sistem - EC401A-28A 582_CCN3_2B_28A_D_EC401_08
Building 28A Diagram Block diagram - SCS system - CD -BD - MDF CD -BD - MDF Blok šema - CD- BD-MDF EC401B-28A 582_CCN3_2B_28A_D_EC401_08
Building 28A Diagram Block diagram - SCS system - L-01 Level -1 SKS sistem – blok šema L-1 - EC401C-28A 582_CCN3_2B_28A_D_EC401_08
Building 28A Diagram Block diagram - SCS system - L+00 Level +0 SKS sistem – blok šema L+0 - EC401D-28A 582_CCN3_2B_28A_D_EC401_08
Building 28A Diagram Block diagram - SCS system - L+01 Level +1 SKS sistem – blok šema L+1 - EC401E-28A 582_CCN3_2B_28A_D_EC401_08
Building 28A Diagram Block diagram - SCS system - L+02 Level +2 SKS sistem – blok šema L+2 - EC401F-28A 582_CCN3_2B_28A_D_EC401_08
Building 28A Diagram Block diagram - SCS system - L+03 Level +3 SKS sistem – blok šema L+3 - EC401G-28A 582_CCN3_2B_28A_D_EC401_08
Building 28A Diagram Block diagram - SCS system - L+04 Level +4 SKS sistem – blok šema L+4 - EC401H-28A 582_CCN3_2B_28A_D_EC401_08
Building 28A Diagram Block diagram - SCS system - L+05 Level +5 SKS sistem – blok šema L+5 - EC401I-28A 582_CCN3_2B_28A_D_EC401_08
Building 28A Diagram SCS system - Active equipment Active equipment SKS sistem - aktivna oprema EC401J-28A 582_CCN3_2B_28A_D_EC401_08
Building 28A Diagram PBX system - connection to existing PBX Connections with telephone Blok šema - Veza sa postojećom centralom EC401K-28A 582_CCN3_2B_28A_D_EC401_08

Building 28A Plan Comm. system - Structured cabling for telephone and data Level -1 SKS sistem – osnove L-1 1:100 EC101-28A 582_CCN3_2B_28A_D_EC101_08
Building 28A Plan Comm. system - Structured cabling for telephone and data Level +0 SKS sistem – osnove L+0 1:100 EC102-28A 582_CCN3_2B_28A_D_EC102_08
Building 28A Plan Comm. system - Structured cabling for telephone and data Level +1 SKS sistem – osnove L+1 1:100 EC103-28A 582_CCN3_2B_28A_D_EC103_08
Building 28A Plan Comm. system - Structured cabling for telephone and data Level +2 SKS sistem – osnove L+2 1:100 EC104-28A 582_CCN3_2B_28A_D_EC104_08
Building 28A Plan Comm. system - Structured cabling for telephone and data Level +3 SKS sistem – osnove L+3 1:100 EC105-28A 582_CCN3_2B_28A_D_EC105_08
Building 28A Plan Comm. system - Structured cabling for telephone and data Level +4 SKS sistem – osnove L+4 1:100 EC106-28A 582_CCN3_2B_28A_D_EC106_08
Building 28A Plan Comm. system - Structured cabling for telephone and data Level +5 SKS sistem – osnove L+5 1:100 EC107-28A 582_CCN3_2B_28A_D_EC107_08
Building 28A Plan Comm. system - Structured cabling for telephone and data Technical Level SKS sistem – osnove L+6 1:100 EC108-28A 582_CCN3_2B_28A_D_EC108_08
Building 28A Plan Cable trays for communication and signal installations - Level -01 Level -1 Kablovski regali telekomunikacionih i signalnih instalacija - Nivo -01 1:100 EC141-28A 582_CCN3_2B_28A_D_EC141_08
Building 28A Plan Cable trays for communication and signal installations - Level +00 Level +0 Kablovski regali telekomunikacionih i signalnih instalacija - Nivo +00 1:100 EC142-28A 582_CCN3_2B_28A_D_EC142_08
Building 28A Plan Cable trays for communication and signal installations - Level +01 Level +1 Kablovski regali telekomunikacionih i signalnih instalacija - Nivo +01 1:100 EC143-28A 582_CCN3_2B_28A_D_EC143_08
Building 28A Plan Cable trays for communication and signal installations - Level +02 Level +2 Kablovski regali telekomunikacionih i signalnih instalacija - Nivo +02 1:100 EC144-28A 582_CCN3_2B_28A_D_EC144_08
Building 28A Plan Cable trays for communication and signal installations - Level +03 Level +3 Kablovski regali telekomunikacionih i signalnih instalacija - Nivo +03 1:100 EC145-28A 582_CCN3_2B_28A_D_EC145_08
Building 28A Plan Cable trays for communication and signal installations - Level +04 Level +4 Kablovski regali telekomunikacionih i signalnih instalacija - Nivo +04 1:100 EC146-28A 582_CCN3_2B_28A_D_EC146_08
Building 28A Plan Cable trays for communication and signal installations - Level +05 Level +5 Kablovski regali telekomunikacionih i signalnih instalacija - Nivo +05 1:100 EC147-28A 582_CCN3_2B_28A_D_EC147_08
Building 28A Plan Cable trays for communication and signal installations - Technical floor Technical Level Kablovski regali telekomunikacionih i signalnih instalacija - Tehnička etaža 1:100 EC148-28A 582_CCN3_2B_28A_D_EC148_08
5 COPYBOOK 4 - NURSE CALL, INTERCOM AND DECT SYSTEM
Site Plan EC010 582_CCN3_2B_28A_R_EC010_08

Building 28A Diagram Comm. system - Nurse call system Level +0, Level +1 Blok šema bolničke signalizacije i interkoma L+0, L+1 - EC402A-28A 582_CCN3_2B_28A_D_EC402A_08
Building 28A Diagram Comm. system - Nurse call system Level +2, Level +3 Blok šema bolničke signalizacije i interkoma L+2, L+3 - EC402B-28A 582_CCN3_2B_28A_D_EC402B_08
Building 28A Diagram Comm. system - Nurse call system Level +4, Level +5 Blok šema bolničke signalizacije i interkoma L+4, L+5 - EC402C-28A 582_CCN3_2B_28A_D_EC402C_08
Building 28A Diagram Comm. system -Intercom system Main diagram Blok šema - Interkom sistem - EC402D-28A 582_CCN3_2B_28A_D_EC402D_08
Building 28A Diagram Comm. system -DECT system Main diagram Blok šema - DECT sistem - EC402E-28A 582_CCN3_2B_28A_D_EC402E_08

Building 28A Plan Comm. system - Nurse call, intercom and DECT systems Level -1 Bolnička signalizacija , Interkom i DECT 1:100 EC109-28A 582_CCN3_2B_28A_D_EC109_08
Building 28A Plan Comm. system - Nurse call, intercom and DECT systems Level +0 Bolnička signalizacija , Interkom i DECT 1:100 EC110-28A 582_CCN3_2B_28A_D_EC110_08
Building 28A Plan Comm. system - Nurse call, intercom and DECT systems Level +1 Bolnička signalizacija , Interkom i DECT 1:100 EC111-28A 582_CCN3_2B_28A_D_EC111_08
Building 28A Plan Comm. system - Nurse call, intercom and DECT systems Level +2 Bolnička signalizacija , Interkom i DECT 1:100 EC112-28A 582_CCN3_2B_28A_D_EC112_08
Building 28A Plan Comm. system - Nurse call, intercom and DECT systems Level +3 Bolnička signalizacija , Interkom i DECT 1:100 EC113-28A 582_CCN3_2B_28A_D_EC113_08
Building 28A Plan Comm. system - Nurse call, intercom and DECT systems Level +4 Bolnička signalizacija , Interkom i DECT 1:100 EC114-28A 582_CCN3_2B_28A_D_EC114_08
Building 28A Plan Comm. system - Nurse call, intercom and DECT systems Level +5 Bolnička signalizacija , Interkom i DECT 1:100 EC115-28A 582_CCN3_2B_28A_D_EC115_08
5 COPYBOOK 5 - SATELITE MASTER TV - MASTER CLOCK SYSTEM
Site Plan Situacija EC010 582_CCN3_2B_28A_R_EC010_08

Building 28A Diagram SMATV system - Main block diagram Main diagram SMATV sistem glavna blok šema - EC403A-28A 582_CCN3_2B_28A_D_EC403_08
Building 28A Diagram SMATV system - Block diagram - L-01, L+00 Level -1, Level +0, SMATV sistem blok šema L-1, L+0 - EC403B-28A 582_CCN3_2B_28A_D_EC403_08

2 November 2011
DOCUMENT LIST STAGE III: Design and Tender documents Phase 2: Detailed Design and Tender Documents Step B : Draft Detailed Design Proposal CLINICAL CENTER OF NIS - CCN Nis
BUILDING 28A

Document
Deliver on Volume Book Section Prog. Building Type English Description Level Serbian Description Scale File Name
Name

Building 28A Diagram SMATV system - Block diagram - L+01 Level +1 SMATV sistem blok šema L+1 - EC403C-28A 582_CCN3_2B_28A_D_EC403_08
Building 28A Diagram SMATV system - Block diagram - L+02 Level +2 SMATV sistem blok šema L+2 - EC403D-28A 582_CCN3_2B_28A_D_EC403_08
Building 28A Diagram SMATV system - Block diagram - L+03 Level +3 SMATV sistem blok šema L+3 - EC403E-28A 582_CCN3_2B_28A_D_EC403_08
Building 28A Diagram SMATV system - Block diagram - L+04 Level +4 SMATV sistem blok šema L+4 - EC403F-28A 582_CCN3_2B_28A_D_EC403_08
Building 28A Diagram SMATV system - Block diagram - L+05 Level +5 SMATV sistem blok šema L+5 - EC403G-28A 582_CCN3_2B_28A_D_EC403_08
Building 28A Diagram Block diagram - Master clock system Main diagram Šema razvoda instalacije centralnog sata - EC404-28A 582_CCN3_2B_28A_D_EC404_08

Building 28A Plan Communication systems (SMATV, Master clock system) Level -1 Distribucija TV signala i centralni sat 1:100 EC116-28A 582_CCN3_2B_28A_D_EC116_08
Building 28A Plan Communication systems (SMATV, Master clock system) Level +0 Distribucija TV signala i centralni sat 1:100 EC117-28A 582_CCN3_2B_28A_D_EC117_08
Building 28A Plan Communication systems (SMATV, Master clock system) Level +1 Distribucija TV signala i centralni sat 1:100 EC118-28A 582_CCN3_2B_28A_D_EC118_08
Building 28A Plan Communication systems (SMATV, Master clock system) Level +2 Distribucija TV signala i centralni sat 1:100 EC119-28A 582_CCN3_2B_28A_D_EC119_08
Building 28A Plan Communication systems (SMATV, Master clock system) Level +3 Distribucija TV signala i centralni sat 1:100 EC120-28A 582_CCN3_2B_28A_D_EC120_08
Building 28A Plan Communication systems (SMATV, Master clock system) Level +4 Distribucija TV signala i centralni sat 1:100 EC121-28A 582_CCN3_2B_28A_D_EC121_08
Building 28A Plan Communication systems (SMATV, Master clock system) Level +5 Distribucija TV signala i centralni sat 1:100 EC122-28A 582_CCN3_2B_28A_D_EC122_08
Building 28A Plan Communication systems (SMATV, Master clock system) Technical Level Distribucija TV signala 1:100 EC123-28A 582_CCN3_2B_28A_D_EC123_08
5 COPYBOOK 6 - SECURITY SYSTEMS: CCTV, ACCESS CONTROL AND INTRUSION DETECTION, AV DOOR ENTRY SYSTEM
Site Plan EC010 582_CCN3_2B_28A_R_EC010_08

Building 28A Diagram Security system - Access control and intrusion detection systems Main diagram Tehnički sistemi zaštite, Kontrola pristupa i protiv-provala - EC406-28A 582_CCN3_2B_28A_D_EC406_08
Building 28A Diagram Block diagram - campus network - CCTV system Diagram Blok šema kompleksa - CCTV sistem - EC407A-28A 582_CCN3_2B_28A_D_EC407_08
Building 28A Diagram Block diagram - campus network - CCTV system - CCTV cables Diagram Blok šema kompleksa - CCTV sistem - kablovska instalacija - EC407B-28A '582_CCN3_2B_28A_D_EC407_08
Building 28A Diagram Block diagram - CCTV system Main diagram Blok šema - CCTV sistem - EC407C-28A '582_CCN3_2B_28A_D_EC407_08
Building 28A Diagram Diagram of audio and video entry system Main diagram Šema razvoda instalacije audio i video interfona - EC408-28A 582_CCN3_2B_28A_D_EC408_08
Building 28A Diagram Block diagram - Safety and security system management Diagram Blok šema - Upravljanje bezbednosnim i sigurnosnim sistemima - EC409A-28A 582_CCN3_2B_28A_D_EC409_08
Building 28A Diagram Block diagram - Control room Diagram Blok šema - Komandna soba - EC409B-28A 582_CCN3_2B_28A_D_EC409_08
Building 28A Diagram Block diagram - Typical block diagram - remote PC operating Diagram Tipska blok šema - Upravljanje računarom sa udaljene lokacije - EC409C-28A 582_CCN3_2B_28A_D_EC409_08

Building 28A Plan Security system - (Access control, intrusion detection systems, CCTV, A/V door entry system) Level -1 Tehnički sistemi zaštite-Kontrola pristupa, protiv provala, CCTV, AV interfon 1:100 EC124-28A 582_CCN3_2B_28A_D_EC124_08
Building 28A Plan Security system - (Access control, intrusion detection systems, CCTV, A/V door entry system) Level +0 Tehnički sistemi zaštite-Kontrola pristupa, protiv provala, CCTV, AV interfon 1:100 EC125-28A 582_CCN3_2B_28A_D_EC125_08
Building 28A Plan Security system - CCTV, A/V door entry system) Level +1 Tehnički sistemi zaštite - CCTV, AV interfon 1:100 EC126-28A 582_CCN3_2B_28A_D_EC126_08
Building 28A Plan Security system - CCTV, A/V door entry system) Level +2 Tehnički sistemi zaštite - CCTV, AV interfon 1:100 EC127-28A 582_CCN3_2B_28A_D_EC127_08
Building 28A Plan Security system - CCTV, A/V door entry system) Level +3 Tehnički sistemi zaštite - CCTV, AV interfon 1:100 EC128-28A 582_CCN3_2B_28A_D_EC128_08
Building 28A Plan Security system - CCTV, A/V door entry system) Level +4 Tehnički sistemi zaštite - CCTV, AV interfon 1:100 EC129-28A 582_CCN3_2B_28A_D_EC129_08
Building 28A Plan Security system - CCTV, A/V door entry system) Level +5, +6 Tehnički sistemi zaštite - CCTV, AV interfon 1:100 EC130-28A 582_CCN3_2B_28A_D_EC130_08
Building 28A Plan Control room - level L+00 Level L+00 Osnova - Kontrolna soba - Nivo L+00 1:100 EC131-28A 582_CCN3_2B_28A_D_EC131_08
5 BOOK 3 - DETAILED DESIGN OF SAFETY SYSTEMS: FIRE DETECTION AND SOUND DIFFUSION IN BUILDING 28 A
5 COPYBOOK 1 - TEXTUAL DOCUMENTATION
5 Part 1 - General Documents
Building 28A Report The decision on registration of a project organization Rešenje o registraciji projektne organizacije
Building 28A Report The decision on appointment of responsible designer Rešenje o imenovanju odgovornog projektanta
Building 28A Report License of responsible designer and a certificate of membership IKS Licenca odgovornog projektanta i potvrda članstva IKS
Building 28A Report Statement by the responsible project compliance Izjava odgovornog projektanta o poštovanju propisa
Building 28A Report Consent of the Client / Investor with the technical documentation Saglasnost Naručioca / Investitora sa Tehničkom dokumentacijom
Building 28A Report Statement of Compliance responsible mutual designers Izjava o medjusobnoj usaglašenosti odgovornih projektanata
5 Part 2 - Project Brief
Building 28A Project brief Projektni zadatak
5 Part 3 - Technical reports
Building 28A Report Technical description Tehnički opis ES001-28A 582_CCN3_2B_28A_R_ES001_08
Building 28A Report Calculations Tehnički proračuni - ES002-28A 582_CCN3_2B_28A_R_ES002_08
Building 28A Report Technical conditions Tehnički uslovi ES003-28A 582_CCN3_2B_28A_R_ES003_08
Building 28A Report Safety on work report Prilog o bezbednosti i zdravlju na radu ES004-28A 582_CCN3_2B_28A_R_ES004_08
Building 28A Report List of regulations and standards Spisak primenjenih stadnarda, propisa i literature ES005-28A 582_CCN3_2B_28A_R_ES005_08
Report Technical Specifications Tehnička specifikacija ES000-28A 582_CCV3_2B_28A_R_ES000_08
Building 28A Report BoQ - Safety systems Predmer i predračun radova ES020-28A 582_CCV3_2B_28A_R_ES020_08
5 COPYBOOK 2 - GRAPHICAL DOCUMENTATION
Site Plan Situacija ES010 582_CCN3_2B_28A_R_ES010_08
General legend Legenda ES011 582_CCN3_2B_28A_R_ES011_08

Building 28A Diagram Vertical digram of Fire detection system and extinguishing system Main diagram Šema vertikalnog razvoda instalacije automatske dojave požara i gašenja - ES401A-28A 582_CCN3_2B_28A_D_ES401A_08
Building 28A Diagram Diagram of Fire detection system and extinguishing system L-01, L+00 Diagram Šema razvoda instalacije automatske dojave požara i gašenja L-01, L+00 - ES401B-28A 582_CCN3_2B_28A_D_ES401B_08
Building 28A Diagram Diagram of Fire detection system and extinguishing system L+01 Diagram Šema razvoda instalacije automatske dojave požara i gašenja L+01 - ES401C-28A 582_CCN3_2B_28A_D_ES401C_08
Building 28A Diagram Diagram of Fire detection system and extinguishing system L+02, L+03 Diagram Šema razvoda instalacije automatske dojave požara i gašenja L+02, L+03 - ES401D-28A 582_CCN3_2B_28A_D_ES401D_08
Building 28A Diagram Diagram of Fire detection system and extinguishing system L+04, L+05, Technical floor Diagram Šema razvoda instalacije automatske dojave požara i gašenja L+04, L+05, Tehnička etaža - ES401E-28A 582_CCN3_2B_28A_D_ES401E_08
Building 28A Diagram Diagram of Fire detection system-executive functions L-01 Diagram Blok šema dojave požara-izvršne funkcije L-01 - ES401F-28A 582_CCN3_2B_28A_D_ES401F_08
Building 28A Diagram Diagram of Fire detection system-executive functions L+00 Diagram Blok šema dojave požara-izvršne funkcije L+00 - ES401G-28A 582_CCN3_2B_28A_D_ES401G_08
Building 28A Diagram Diagram of Fire detection system-executive functions-DB for shuting down power supply in building L+00 Diagram Blok šema dojave požara-izvršne funkcije-orman za gašenje napajanja u objektu L+00 - ES401H-28A 582_CCN3_2B_28A_D_ES401H_08
Building 28A Diagram Diagram of Fire detection system-executive functions L+01, L+02 Diagram Blok šema dojave požara-izvršne funkcije L+01, L+02 - ES401I-28A 582_CCN3_2B_28A_D_ES401I_08
Building 28A Diagram Diagram of Fire detection system-executive functions L+03, L+04 Diagram Blok šema dojave požara-izvršne funkcije L+03, L+04 - ES401J-28A 582_CCN3_2B_28A_D_ES401J_08
Diagram Diagram of Fire detection system-executive functions L+05, Technical floor Diagram Blok šema dojave požara-izvršne funkcije L+05, Tehnička etaža - ES401K-28A 582_CCN3_2B_28A_D_ES401K_08
Building 28A Diagram Alarm plan Diagram Alarmni plan - ES401L-28A 582_CCN3_2B_28A_D_ES401L_08
Building 28A Diagram Detail - Fire detector mounting, and passing of cables through fire wall Diagram Detalj montaže javljača i prolaska kablova kroz požarni zid - ES401M-28A 582_CCN3_2B_28A_D_ES401M_08
Building 28A Diagram Detail - Typical single line diagram of dampers power supply and controling Diagram Tipska šema napajanja i upravljanja klapnama - ES401N-28A 582_CCN3_2B_28A_D_ES401N_08
Building 28A Diagram Detail - Typical distribution boards for executive functions of FD system - L-01,L+00 Diagram Tipski ormani za smeštaj opreme za izvršne funkcije sistema dojave požara - L-01,L+00 - ES401O.1-28A 582_CCN3_2B_28A_D_ES401O_08
Building 28A Diagram Detail - Typical distribution boards for executive functions of FD system - L+01,L+02 Diagram Tipski ormani za smeštaj opreme za izvršne funkcije sistema dojave požara - L+01, L+02 - ES401O.2-28A 582_CCN3_2B_28A_D_ES401O_08
Building 28A Diagram Detail - Typical distribution boards for executive functions of FD system - L+03,L+04 Diagram Tipski ormani za smeštaj opreme za izvršne funkcije sistema dojave požara - L+03, L+04 - ES401O.3-28A 582_CCN3_2B_28A_D_ES401O_08

3 November 2011
DOCUMENT LIST STAGE III: Design and Tender documents Phase 2: Detailed Design and Tender Documents Step B : Draft Detailed Design Proposal CLINICAL CENTER OF NIS - CCN Nis
BUILDING 28A

Document
Deliver on Volume Book Section Prog. Building Type English Description Level Serbian Description Scale File Name
Name

Building 28A Diagram Detail - Typical distribution boards for executive functions of FD system - L+05, L+06 Diagram Tipski ormani za smeštaj opreme za izvršne funkcije sistema dojave požara - L+05, L+06 - ES401O.4-28A 582_CCN3_2B_28A_D_ES401O_08
Building 28A Diagram Distribution board for shuting down power supply in building Diagram Orman za gašenje napajanja u objektu - ES401P-28A 582_CCN3_2B_28A_D_ES401P_08

Building 28A Diagram Safety system -Vertical digram of Sound diffusion system Diagram Šema vertikalnog razvoda instalacije ozvučenja - ES402A-28A 582_CCN3_2B_28A_D_ES402A_08
Building 28A Diagram Block diagram-sound diffusion system levels L-01, L+00, L+01, L+02 Diagram Šema razvoda instalacije ozvučenja Nivoi L-01, L+00,L+01 i L+02 - ES402B-28A 582_CCN3_2B_28A_D_ES402B_08
Building 28A Diagram Block diagram-sound diffusion system levels L+03, L+04, L+05 and Technical level Diagram Šema razvoda instalacije ozvučenja Nivoi L+03, L+04, L+05 i Tehnička etaža - ES402C-28A 582_CCN3_2B_28A_D_ES402C_08

Building 28A Plan Safety system - Fire detection system, Sound diffusion system Level -1 Dojava požara i ozvučenje - Nivo -1 1:100 ES101-28A 582_CCN3_2B_28A_D_ES101_08
Building 28A Plan Safety system - Fire detection system, Sound diffusion system Level +0 Dojava požara i ozvučenje - Nivo +0 1:100 ES102-28A 582_CCN3_2B_28A_D_ES102_08
Building 28A Plan Safety system - Fire detection system, Sound diffusion system Level +1 Dojava požara i ozvučenje - Nivo +1 1:100 ES103-28A 582_CCN3_2B_28A_D_ES103_08
Building 28A Plan Safety system - Fire detection system, Sound diffusion system Level +2 Dojava požara i ozvučenje - Nivo +2 1:100 ES104-28A 582_CCN3_2B_28A_D_ES104_08
Building 28A Plan Safety system - Fire detection system, Sound diffusion system Level +3 Dojava požara i ozvučenje - Nivo +3 1:100 ES105-28A 582_CCN3_2B_28A_D_ES105_08
Building 28A Plan Safety system - Fire detection system, Sound diffusion system Level +4 Dojava požara i ozvučenje - Nivo +4 1:100 ES106-28A 582_CCN3_2B_28A_D_ES106_08
Building 28A Plan Safety system - Fire detection system, Sound diffusion system Level +5 Dojava požara i ozvučenje - Nivo +5 1:100 ES107-28A 582_CCN3_2B_28A_D_ES107_08
Building 28A Plan Safety system - Fire detection system, Sound diffusion system Technical level Dojava požara i ozvučenje - tehnički etaž 1:100 ES108-28A 582_CCN3_2B_28A_D_ES108_08
Building 28A Plan Safety system - Fire detection - Executive functions Level -1 Dojava požara - izvršne funkcije - Nivo -1 1:100 ES109-28A 582_CCN3_2B_28A_D_ES109_08
Building 28A Plan Safety system - Fire detection - Executive functions Level +0 Dojava požara - izvršne funkcije - Nivo +0 1:100 ES110-28A 582_CCN3_2B_28A_D_ES110_08
Building 28A Plan Safety system - Fire detection - Executive functions Level +1 Dojava požara - izvršne funkcije - Nivo +1 1:100 ES111-28A 582_CCN3_2B_28A_D_ES111_08
Building 28A Plan Safety system - Fire detection - Executive functions Level +2 Dojava požara - izvršne funkcije - Nivo +2 1:100 ES112-28A 582_CCN3_2B_28A_D_ES112_08
Building 28A Plan Safety system - Fire detection - Executive functions Level +3 Dojava požara - izvršne funkcije - Nivo +3 1:100 ES113-28A 582_CCN3_2B_28A_D_ES113_08
Building 28A Plan Safety system - Fire detection - Executive functions Level +4 Dojava požara - izvršne funkcije - Nivo +4 1:100 ES114-28A 582_CCN3_2B_28A_D_ES114_08
Building 28A Plan Safety system - Fire detection - Executive functions Level +5 Dojava požara - izvršne funkcije - Nivo +5 1:100 ES115-28A 582_CCN3_2B_28A_D_ES115_08
Building 28A Plan Safety system - Fire detection - Executive functions Technical level Dojava požara - izvršne funkcije - tehnički etaž 1:100 ES116-28A 582_CCN3_2B_28A_D_ES116_08

5 BOOK 4 - DETAILED DESIGN OF BMS IN BUILDING 28 A


5 COPYBOOK 1 - TEXTUAL AND GRAPHICAL DOCUMENTATION
5 Part 1 - General Documents
Building 28A Report The decision on registration of a project organization Rešenje o registraciji projektne organizacije
Building 28A Report The decision on appointment of responsible designer Rešenje o imenovanju odgovornog projektanta
Building 28A Report License of responsible designer and a certificate of membership IKS Licenca odgovornog projektanta i potvrda članstva IKS
Building 28A Report Statement by the responsible project compliance Izjava odgovornog projektanta o poštovanju propisa
Building 28A Report Consent of the Client / Investor with the technical documentation Saglasnost Naručioca / Investitora sa Tehničkom dokumentacijom
Building 28A Report Statement of Compliance responsible mutual designers Izjava o medjusobnoj usaglašenosti odgovornih projektanata
5 Part 2 - Project Brief
Building 28A Project brief Projektni zadatak
5 Part 3 - Technical reports
Building 28A Report Technical description Tehnički opis EH001-28A 582_CCN3_2B_28A_R_EH001_05
Building 28A Report Calculations Proračuni EH002-28A 582_CCN3_2B_28A_R_EH002_05
Building 28A Report Technical conditions Tehnički uslovi EH003-28A 582_CCN3_2B_28A_R_EH003_05
Building 28A Report Safety on work report Prilog o bezbednosti i zdravlju na radu EH004-28A 582_CCN3_2B_28A_R_EH004_05
Building 28A Report List of regulations and standards Spisak korišćenih standarda, propisa i literature EH005-28A 582_CCN3_2B_28A_R_EH005_05
Building 28A Report Technical Specifications Tehnička specifikacija EH000-28A 582_CCN3_2B_28A_R_EH000_05
Building 28A Report BoQ - Building Management System Predmer i predračun radova EH020-28A 582_CCN3_2B_28A_R_EH020_05
5 COPYBOOK 2 - GRAPHICAL DOCUMENTATION
Building 28A Diagram General BMS Diagram for building 28A Diagram Principiska šema povezivanja BMS-a za zgradu 28A EH400-28A 582_CCN3_2B_28A_D_EH400_05
Building 28A Diagram General BMS Diagram for building 28A - level -1 Diagram - Level -1 Principiska šema povezivanja BMS-a - nivo -1 EH401-28A 582_CCN3_2B_28A_D_EH401_408_05
Building 28A Diagram General BMS Diagram for building 28A - level +0 Diagram - Level+0 Principiska šema povezivanja BMS-a - nivo +0 EH402-28A 582_CCN3_2B_28A_D_EH401_408_05
Building 28A Diagram General BMS Diagram for building 28A - level +1 Diagram - Level+1 Principiska šema povezivanja BMS-a - nivo +1 EH403-28A 582_CCN3_2B_28A_D_EH401_408_05
Building 28A Diagram General BMS Diagram for building 28A - level +2 Diagram - Level+2 Principiska šema povezivanja BMS-a - nivo +2 EH404-28A 582_CCN3_2B_28A_D_EH401_408_05
Building 28A Diagram General BMS Diagram for building 28A - level +3 Diagram - Level+3 Principiska šema povezivanja BMS-a - nivo +3 EH405-28A 582_CCN3_2B_28A_D_EH401_408_05
Building 28A Diagram General BMS Diagram for building 28A - level +4 Diagram - Level+4 Principiska šema povezivanja BMS-a - nivo +4 EH406-28A 582_CCN3_2B_28A_D_EH401_408_05
Building 28A Diagram General BMS Diagram for building 28A - level +5 Diagram - Level+5 Principiska šema povezivanja BMS-a - nivo +5 EH407-28A 582_CCN3_2B_28A_D_EH401_408_05
Building 28A Diagram General BMS Diagram for building 28A - level +6 Diagram - Level+6 Principiska šema povezivanja BMS-a - nivo +6 EH408-28A 582_CCN3_2B_28A_D_EH401_408_05
Building 28A Layout Communication system L-01 Level -1 Sistem za komunikaciju, L-01 1:100 EH106-28A 582_CCN3_2B_28A_D_EH106_05
Building 28A Layout Communication system L+00 Level +0 Sistem za komunikaciju, L+00 1:100 EH107-28A 582_CCN3_2B_28A_D_EH107_05
Building 28A Layout Communication system L+01 Level +1 Sistem za komunikaciju, L+01 1:100 EH108-28A 582_CCN3_2B_28A_D_EH108_05
Building 28A Layout Communication system L+02 Level +2 Sistem za komunikaciju, L+02 1:100 EH109-28A 582_CCN3_2B_28A_D_EH109_05
Building 28A Layout Communication system L+03 Level +3 Sistem za komunikaciju, L+03 1:100 EH110-28A 582_CCN3_2B_28A_D_EH110_05
Building 28A Layout Communication system L+04 Level +4 Sistem za komunikaciju, L+04 1:100 EH111-28A 582_CCN3_2B_28A_D_EH111_05
Building 28A Layout Communication system L+05 Level +5 Sistem za komunikaciju, L+05 1:100 EH112-28A 582_CCN3_2B_28A_D_EH112_05
Building 28A Layout Communication system L+06 Level +6 Sistem za komunikaciju, L+06 1:100 EH113-28A 582_CCN3_2B_28A_D_EH113_05
Building 28A Layout Communication system , Roof Roof Sistem za komunikaciju, Krov 1:100 EH114-28A 582_CCN3_2B_28A_D_EH114_05

Building 28A Plan Electrical installation - Mechanical substation Mechanical substation Elektro instalacija u podstanici – osnova podstanice 1:100 EH120-28A 582_CCN3_2B_28A_D_EH120_05

Building 28A Diagram BMS - Three pole diagram - General notes BMS - Tropolne šeme ormana - opšte napomene EH450-28A 582_CCN3_2B_28A_D_EH450_05
Building 28A Diagram Three pole diagram GRO_28A/L-01/TEC-03 Tropolne šeme ormana GRO_28A/L-01/TEC-03 EH451-28A 582_CCN3_2B_28A_D_EH401_408_05
Building 28A Diagram Three pole diagram RO_28A/L-01/TEC-03.BMS Tropolne šeme ormana RO_28A/L-01/TEC-03.BMS EH452-28A 582_CCN3_2B_28A_D_EH401_408_05
Building 28A Diagram Three pole diagram GRO_28A/L+06/TEC-01 Tropolne šeme ormana GRO_28A/L+06/TEC-01 EH453-28A 582_CCN3_2B_28A_D_EH401_408_05
Building 28A Diagram Three pole diagram GRO_28A/L+06/TEC-02 Tropolne šeme ormana GRO_28A/L+06/TEC-02 EH454-28A 582_CCN3_2B_28A_D_EH401_408_05
Building 28A Diagram Three pole diagram GRO_SE.28A/L+06/SS(FF).1 Tropolne šeme ormana GRO_SE.28A/L+06/SS(FF).1 EH455-28A 582_CCN3_2B_28A_D_EH455_459_05
Building 28A Diagram Three pole diagram RO_28A/L+06/TEC-01.BMS Tropolne šeme ormana RO_28A/L+06/TEC-01.BMS EH455.1-28A 582_CCN3_2B_28A_D_EH455_459_05
Building 28A Diagram Three pole diagram GRO_SE.28A/L+06/SS(FF).2 Tropolne šeme ormana GRO_SE.28A/L+06/SS(FF).2 EH456-28A 582_CCN3_2B_28A_D_EH455_459_05
Diagram Three pole diagram RO_28A/L+06/TEC-02.BMS Tropolne šeme ormana RO_28A/L+06/TEC-02.BMS EH456.1-28A 582_CCN3_2B_28A_D_EH455_459_05

4 November 2011
DOCUMENT LIST STAGE III: Design and Tender documents Phase 2: Detailed Design and Tender Documents Step B : Draft Detailed Design Proposal CLINICAL CENTER OF NIS - CCN Nis
BUILDING 28A

Document
Deliver on Volume Book Section Prog. Building Type English Description Level Serbian Description Scale File Name
Name

Building 28A Diagram Three pole diagram RO_28A/TEC-01 Tropolne šeme ormana RO_28A/TEC.01 EH457-28A 582_CCN3_2B_28A_D_EH455_459_05
Building 28A Diagram Three pole diagram RO_28A/PR.01 Tropolna šema ormana RO_28A/PR.01 EH458.1-28A 582_CCN3_2B_28A_D_EH455_459_05
Building 28A Diagram Three pole diagram RO_28A/PR.02 Tropolna šema ormana RO_28A/PR.02 EH458.2-28A 582_CCN3_2B_28A_D_EH455_459_05
Building 28A Diagram Three pole diagram RO_28A/PR.03 Tropolna šema ormana RO_28A/PR.03 EH458.3-28A 582_CCN3_2B_28A_D_EH455_459_05
Building 28A Diagram Three pole diagram RO_28A/PR.04 Tropolna šema ormana RO_28A/PR.04 EH458.4-28A 582_CCN3_2B_28A_D_EH455_459_05
Building 28A Diagram Three pole diagram RO_28A/PR.05 Tropolna šema ormana RO_28A/PR.05 EH458.5-28A 582_CCN3_2B_28A_D_EH455_459_05
Building 28A Diagram Three pole diagram RO_28A/PR.06 Tropolna šema ormana RO_28A/PR.06 EH458.6-28A 582_CCN3_2B_28A_D_EH455_459_05
Building 28A Diagram Three pole diagram RO_28A/PR.07 Tropolna šema ormana RO_28A/PR.07 EH458.7-28A 582_CCN3_2B_28A_D_EH455_459_05
Building 28A Diagram Three pole diagram GRO_28A/L+06/LI-FF-01 Tropolna šema ormana GRO_28A/L+06/LI-FF-01 EH459-28A 582_CCN3_2B_28A_D_EH455_459_05

Building 28A Diagram Mechanical connection scheme Mašinske šeme povezivanja opreme EH461M-28A 582_CCN3_2B_28A_D_EH461M_05
Building 28A Diagram Scheme of equipment connection in mechanical room and substation Šema veze opreme u mašinskoj sali i podstanici EH462M-28A 582_CCN3_2B_28A_D_EH462M_05

Building 28A Diagram Diagram of light controller connection El. šema povezivanja kontrolera osvetljenja EH471-28A 582_CCN3_2B_28A_D_EH470_479_05
Building 28A Diagram Connection diagram of mechanical equipment - Sheme 1 Električna šema povezivanja mašinske opreme - šema 1 EH472-28A 582_CCN3_2B_28A_D_EH470_479_05
Building 28A Diagram Connection diagram of mechanical equipment - Sheme 2 Električna šema povezivanja mašinske opreme - šema 2 EH473-28A 582_CCN3_2B_28A_D_EH470_479_05
Building 28A Diagram Connection diagram of mechanical equipment - Sheme 3 Električna šema povezivanja mašinske opreme - šema 3 EH474-28A 582_CCN3_2B_28A_D_EH470_479_05
Building 28A Diagram Connection diagram of mechanical equipment - Sheme 4 Električna šema povezivanja mašinske opreme - šema 4 EH475-28A 582_CCN3_2B_28A_D_EH470_479_05
Building 28A Diagram Connection diagram of mechanical equipment - Sheme 5 Električna šema povezivanja mašinske opreme - šema 5 EH476-28A 582_CCN3_2B_28A_D_EH470_479_05
Building 28A Diagram Connection diagram of mechanical equipment - Sheme 6 Električna šema povezivanja mašinske opreme - šema 6 EH477-28A 582_CCN3_2B_28A_D_EH470_479_05
Building 28A Diagram Connection diagram of mechanical equipment - Sheme 8 Električna šema povezivanja mašinske opreme - šema 8 EH478-28A 582_CCN3_2B_28A_D_EH470_479_05
Building 28A Diagram Connection diagram of mechanical equipment - Sheme 9 Električna šema povezivanja mašinske opreme - šema 9 EH479-28A 582_CCN3_2B_28A_D_EH470_479_05

5 November 2011
DOCUMENT LIST STAGE III: Design and Tender documents Phase 2: Detailed Design and Tender Documents Step B : Draft Detailed Design Proposal CLINICAL CENTER OF NIS - CCN Nis
TECHNICAL BLOCK T1

Document
Deliver on Volume Book Section Prog. Building Type English Description Level Serbian Description Scale File Name
Name

5 VOLUME 5 - ELECTRICAL INSTALLATIONS


5 COPYBOOK 1 - TEXTUAL DOCUMENTATION
5 Part 1 - General Documents
Technical block Report The decision on registration of a project organization Rešenje o registraciji projektne organizacije

Technical block Report The decision on appointment of responsible designer Rešenje o imenovanju odgovornog projektanta

Technical block Report License of responsible designer and a certificate of membership IKS Licenca odgovornog projektanta i potvrda članstva IKS

Technical block Report Statement by the responsible project compliance Izjava odgovornog projektanta o poštovanju propisa

Technical block Report Consent of the Client / Investor with the technical documentation Saglasnost Naručioca / Investitora sa Tehničkom dokumentacijom

Technical block Report Statement of Compliance responsible mutual designers Izjava o medjusobnoj usaglašenosti odgovornih projektanata
5 Part 2 - Project Brief
Technical block Project brief Projektni zadatak
Technical block Technical conditions of Local Authority Uslovi
Technical block Location permit Lokacijska dozvola
5 Part 3 - Technical reports
Technical block Report Technical description Tehnički opis ET001 582_CCN3_2B_ET_R_ET001_04
Technical block Report Technical conditions for construction Calculations Tehnički uslovi - ET002 582_CCN3_2B_ET_R_ET002_04
Technical block Report Calculations Tehnički proračuni ET003 582_CCN3_2B_ET_R_ET003_04
Technical block Report Safety at work Prilog o bezbednosti i zdravlju na radu ET004 582_CCN3_2B_ET_R_ET004_04
Technical block Report The list of used standards, regulations and literature Spisak primenjenih stadnarda, propisa i literature ET005 582_CCN3_2B_ET_R_ET005_04
5 COPYBOOK 2 - BILL OF QUANTITIES
Technical block Report Technical Specifications Tehnička specifikacija ET000 582_CCN3_2B_ET_R_ET000_01
Technical block Report BoQ - Technical block Predmer i predračun radova ET020 582_CCN3_2B_ET_R_ET020_02
5 COPYBOOK 3 - GRAPHICAL DOCUMENTATION
5 LOW VOLTAGE INSTALLATION
Technical block Site Plan Main distribution and external electrical plants - status quo Situacija sa lokacijom trafostanice - Postojeće stanje - ET101 582_CCN3_2A_ET_D_EE101_02
Technical block Plan Plan with Technical block T1 location - Proposal Situacija sa lokacijom trafostanice - Novoprojektovano stanje - ET102 582_CCN3_2B_ET_D_ET102_05
Technical block Diagram General HV/LV Main Distribution Blok šema glavnog razvoda VN/NN - EE401 582_CCN3_2B_ET_D_EE401_02
Technical block Technical block singleline diagram Jednopolne šeme razvodnih ormana (naslovna stranica i opšte napomene) - ET400 582_CCN3_2B_ET_D_ET400_02
Technical block Technical block singleline diagram 10kV Jednopolna šema rasklopnog bloka 10kV - 582_CCN3_2B_ET_D_ET401_02
Technical block Technical block singleline diagram LV distribution Bldg 27 Jednopolna šema glavnog NN razvoda u TS LVDB 27 - 582_CCN3_2B_ET_D_ET402_02
Technical block Technical block singleline diagram LV distribution Bldg 28A Jednopolna šema glavnog NN razvoda u TS LVDB 28A - 582_CCN3_2B_ET_D_ET403_03
Technical block Technical block singleline diagram GRO-DG Jednopolna šema Glavnog razvodnog ormana MB_DG - 582_CCN3_2B_ET_D_ET404_03
Technical block Technical block singleline diagram GRO-UPS Jednopolna šema ormana UPS-a MB_UPS - 582_CCN3_2B_ET_D_ET405_03
Technical block Technical block singleline diagram GRO-CPSS Jednopolna šema ormana CPSS-a MB_CPSS - 582_CCN3_2B_ET_D_ET406_03
Technical block Technical block singleline diagram RO-TS Jednopolna šema ormana opštih instalacija B_AUX - 582_CCN3_2B_ET_D_ET407_02
Technical block Technical block singleline diagram GRO-SO Jednopolna šema ormana spoljne rasvete EL - 582_CCN3_2B_ET_D_ET408_02
Technical block Diagram Three pole diagrams and circuit diagram TROPOLNE ŠEME I ŠEME DELOVANJA ET420 582_CCN3_2B_ET_D_ET420_02
Technical block MV Switchgear 10kV (incoming and general switch cubicles) Rasklopni blok 20kV (vodne i spojna ćelija) ET421
Technical block MV Switchgear 10kV (transformer cubicle No.1) Rasklopni blok 10kV (trafo ćelija br. 1) ET422
Technical block MV Switchgear 10kV (transformer cubicle No.2) Rasklopni blok 10kV (trafo ćelija br. 2) ET423
Technical block MV Switchgear 10kV (transformer cubicle No.3) Rasklopni blok 10kV (trafo ćelija br. 3) ET424
Technical block MV Switchgear 10kV (transformer cubicle No.4) Rasklopni blok 10kV (trafo ćelija br. 4) ET425
Main Low voltage distribution board (incomes and connecting circuit
Technical block Glavni NN razvod (dovod i spojka) ET426
beakers)
Glavni NN razvod (izvodni prekidači) ET427
Tipske šeme ET428
Upravljanje spoljnom rasvetom ET429

Technical block Supervision and control system Block diagram Blok dijagram NUS-a u Trafostanici ET430 582_CCN3_2B_ET_D_ET430_02
Technical block Diagram Technical block - front view switchboards PREDNJI IZGLEDI ET450 582_CCN3_2B_ET_D_ET450_02
Technical block Technical block front view switchboard 10kV Prednji izgled rasklopnog bloka 10kV - ET451
Technical block Technical block front view LV distribution Bldg 27 Prednji izgled glavnog NN razvoda TS LVDB 27 - ET452
Technical block Technical block front view LV distribution Bldg 28A Prednji izgled glavnog NN razvoda TS LVDB 28A - ET453
Technical block Technical block front view GRO-DG Prednji izgled glavnog ormana DG-a MB_DG - ET454
Technical block Technical block front view GRO-UPS Prednji izgled ormana UPS-a MB_UPS - ET455
Technical block Technical block front view MB_CPSS/TS1N Prednji izgled ormana UPS-a MB_CPSS/TS1N - ET456
Technical block Layout Electrical instalations layouts - ELECTRICAL EQUIPMENT Elektro instalacije, dispozicioni crteži - ELEKTRO OPREMA - ET501 582_CCN3_2B_ET_D_ET501_02
Technical block Layout MAIN DISTRIBUTION ON CEILING GLAVNI RAZVOD NA PLAFONU - ET502 582_CCN3_2B_ET_D_ET502_03
DOCUMENT LIST STAGE III: Design and Tender documents Phase 2: Detailed Design and Tender Documents Step B : Draft Detailed Design Proposal CLINICAL CENTER OF NIS - CCN Nis
TECHNICAL BLOCK T1

Document
Deliver on Volume Book Section Prog. Building Type English Description Level Serbian Description Scale File Name
Name

Technical block Layout MAIN DISTRIBUTION ON FLOOR GLAVNI RAZVOD U PODU - ET503 582_CCN3_2B_ET_D_ET503_02
Technical block Layout Electrical instalations layouts - LIGHTING Elektro instalacije, dispozicioni crteži - OSVETLJENJE - ET504 582_CCN3_2B_ET_D_ET504_02
Technical block Layout Electrical instalations layouts - SOCKET OUTLETS Elektro instalacije, dispozicioni crteži - UTIČNICE I PRIKLJUČCI - ET505 582_CCN3_2B_ET_D_ET505_02
Electrical instalations layouts - Electrical instalations layouts
Technical block Layout Elektro instalacije, dispozicioni crteži - IZJEDNAČENJE POTENCIJALA - ET506 582_CCN3_2B_ET_D_ET506_02
EQUIPOTENCIAL AND EARTING SYSTEM
Elektro instalacije, dispozicioni crteži - GROMOBRANSKA INSTALACIJA
Technical block Layout Electrical instalations layouts -GROUNDING - ET507 582_CCN3_2B_ET_D_ET507_02
UZEMLJIVAČ
Elektro instalacije, dispozicioni crteži - GROMOBRANSKA INSTALACIJA
Technical block Layout Electrical instalations layouts - LPS - ROOF - ET508 582_CCN3_2B_ET_D_ET508_02
OSNOVA KROVA
Elektro instalacije, dispozicioni crteži - GROMOBRANSKA INSTALACIJA
Technical block Layout Electrical instalations layouts - LPS - ELEVATIONS - ET509 582_CCN3_2B_ET_D_ET509_02
FASADE
Technical block Layout Electrical instalations layouts - Section 6-6 Elektro instalacije, dispozicioni crteži - Presek 6-6 - ET510 582_CCN3_2B_ET_D_ET510_02
Technical block Layout Electrical instalations layouts - Section 6-6 Elektro instalacije, dispozicioni crteži - Presek 6-6 - ET511 582_CCN3_2B_ET_D_ET511_02
Technical block Layout Cable passage throw wall - Detail DETALJ ZAPTIVANJA PRODORA KABLOVA - ET512 582_CCN3_2B_ET_D_ET512_02
5 COMMUNICATION , SECURITY AND SAFETY
Technical block Diagram Fire detection system. SCS and CCTV system Blok šema. Dojava požara, SKS i CCTV sistem ET550 582_CCN3_2B_ET_D_ET550_02
Technical block Layout Structured cabling system and CCTV Strukturni kablovski sistem i CCTV sistem ET551 582_CCN3_2B_ET_D_ET551_02
Technical block Layout Fire detection system Stabilna instalacija za dojavu požara ET552 582_CCN3_2B_ET_D_ET552_02
Technical block Layout Key table - communication and signal installations Legenda oznaka - telekomunikacione i signalne instalacije ET553 582_CCN3_2B_ET_D_ET553_02
5 BMS
Situacija sa trasom komunikaionih kablova za BMS
Technical block Diagram Site plan with external communication BMS cables ET650 582_CCN3_2B_ET_D_ET650_05

Technical block Diagram BMS communication system Sistem za komunikaciju ET651 582_CCN3_2B_ET_D_ET651_05
Technical block Diagram Electrical installation in mechanical substation Elektro instalacija u podstanici – osnova podstanice ET652 582_CCN3_2B_ET_D_ET652_05
Technical block Diagram Equipotencial and earthing system Elektro instalacija izjednačavanja potencijala – osnova podstanice ET653 582_CCN3_2B_ET_D_ET653_05
Technical block Diagram Three pole diagram of GRO_T1/L+00/TEC-01 Tropolna šema ormana GRO_T1/L+00/TEC-01 ET654 582_CCN3_2B_ET_D_ET654_05
Technical block Diagram Three pole diagram of RO_T1/L+00/TEC-01.BMS Tropolna šema ormana RO_T1/L+00/TEC-01.BMS ET655 582_CCN3_2B_ET_D_ET655_05
Technical block Diagram Connection diagram in mechanical substation Šema povezivanja u podstanici ET656 582_CCN3_2B_ET_D_ET656_05
DOCUMENT LIST STAGE III: Design and Tender documents Phase 2: Detailed Design and Tender Documents Step B : Final Detailed Design Proposal CLINICAL CENTER OF NIS - CCN Nis
MEDICAL GAS STATION T2

Document
Deliver on Volume Book Section Prog. Building Type English Description Level Serbian Description Scale File Name
Name

5 VOLUME 5 - ELECTRICAL INSTALLATIONS


5 TEXTUAL PART
5 Part 1 - General Documents
Medical Gases Station Report The decision on registration of a project organization Rešenje o registraciji projektne organizacije

Medical Gases Station Report The decision on appointment of responsible designer Rešenje o imenovanju odgovornog projektanta

Medical Gases Station Report License of responsible designer and a certificate of membership IKS Licenca odgovornog projektanta i potvrda članstva IKS

Medical Gases Station Report Statement by the responsible project compliance Izjava odgovornog projektanta o poštovanju propisa

Medical Gases Station Report Consent of the Client / Investor with the technical documentation Saglasnost Naručioca / Investitora sa Tehničkom dokumentacijom

Medical Gases Station Report Statement of Compliance responsible mutual designers Izjava o medjusobnoj usaglašenosti odgovornih projektanata

5 Part 2 - Project Brief


Medical Gases Station Project brief Projektni zadatak

Medical Gases Station Technical conditions for connection to the network object Tehnički uslovi za priključenje objekta na elektroenergetsku mrežu

5 Part 3 - Technical reports


Medical Gases Station Report Technical description Tehnički opis EMG001 582_CCN3_2B_ET_R_EMG001_04

Medical Gases Station Report Calculations Tehnički proračuni - EMG002 582_CCN3_2B_ET_R_EMG002_04

Medical Gases Station Report General and technical requirements for performing electric power intallation Tehnički uslovi EMG003 582_CCN3_2B_ET_R_EMG003_04

Medical Gases Station Report Report on safety and health at work Prilog o bezbednosti i zdravlju na radu EMG004 582_CCN3_2B_ET_R_EMG004_04

Medical Gases Station Report List of used tecnhical standards and norms regulations Spisak primenjenih stadnarda, propisa i literature EMG005 582_CCN3_2B_ET_R_EMG005_04

5 BILL OF QUANTITIES
Report Technical Specifications Tehnička specifikacija EMG000 582_CCN3_2B_ET_R_EMG000_04

Medical Gases Station BoQ - Medical gas station Predmer i predračun radova EMG020 582_CCN3_2B_ET_R_EMG020_04

5 GRAPHICAL PART
Medical Gases Station Plan Site Plan Situacija - EMG010 582_CCN3_2B_ET_D_EMG010_04

Medical Gases Station Diagram Single line diagram for main distribution board Jednopolna šema glavnog razvodnog ormana EMG401 582_CCN3_2B_ET_D_EMG401_04
Elektro Instalacije
Medical Gases Station Layout Electrical installation 582_CCN3_2B_ET_D_EMG501_04

Medical Gases Station Layout Earthing and LPS - Roof Gromobranska instalacija – osnova krova '582_CCN3_2B_ET_D_EMG502_04

Medical Gases Station Details Details Detalji 582_CCN3_2B_ET_D_EMG503_04

Medical Gases Station Layout - Degiram Main block diagram and dispositions for SCS system Glavna blok šema i osnova SCS sistem 582_CCN3_2B_ET_D_EMG551_04
DOCUMENT LIST
STAGE III: Design and Tender documents
Phase 2: Detailed Design and Tender Documents
Step B : Final Detailed Design
CLINICAL CENTER OF NIŠ - CCN
Niš

Document
Volume Book Section Prog. Blg. Type English Description Serbian Description Level Scale File Name
Name

6 MECHANICAL INSTALLATIONS - BUILDING 27


MM - MECHANICAL REPORTS
06 02 01 001 27 Report Technical specification report Tehnički opis termotehničkih instalacija - MM001-27 582_CCN3_2B_27_R_MM001_04
06 02 01 002 27 Report Heat loss calculations Proračun toplotnih gubitaka - MM002-27 582_CCN3_2B_27_R_MM002_02
06 02 02 003 27 Report Heat gain calculations Proračun toplotnih dobitaka - MM003-27 582_CCN3_2B_27_R_MM003_02
06 02 02 004 27 Report Radiator selection Izbor radijatorskih grejnih tela - MM004-27 582_CCN3_2B_27_R_MM004_01
06 02 02 005 27 Report Dimensioning and balancing of RA pipeline Proračun i balansiranje radijatorske cevne mreže - MM005-27 582_CCN3_2B_27_R_MM005_01
06 02 02 006 27 Report Fan Coil Units selection Izbor ventilator konvektora - MM006-27 582_CCN3_2B_27_R_MM006_01
06 02 02 007 27 Report Dimensioning and balancing of FCU pipeline Proračun i balansiranje cevne mreže ventilator konvektora - MM007-27 582_CCN3_2B_27_R_MM007_01
06 02 03 008 27 Report Air quantity calculation and selection of diffusers Proračun količina vazduha i izbor elemenata za distribuciju - MM008-27 582_CCN3_2B_27_R_MM008_01
06 02 03 009 27 Report Dimensioning and balancing of air duct network Proračun i balansiranje mreže vazdušnih kanala - MM009-27 582_CCN3_2B_27_R_MM009_02
06 02 03 010 27 Report Fire dampers specification Specifikacija protivpožarnih klapni - MM010-27 582_CCN3_2B_27_R_MM010_01
06 02 03 011 27 Report AHU selection report with h-x diagrams Izveštaj izbora klima komora sa h-x dijagramima - MM011-27 582_CCN3_2B_27_R_MM011_01
06 02 03 012 27 Report Calculation of noise reduction in air systems Proračun prigušenja buke u ventilacionim sistemima - MM012-27 582_CCN3_2B_27_R_MM012_01
Calculation of staircase and lift shafts overpressure Proračun sistema natpritisne ventilacije stepeništa i liftovskog
02 03 013 27 Report - MM013-27 582_CCN3_2B_27_R_MM013_03
06 ventilation okna
Calculation of pressure drop in duct network and selection Proračun pada pritiska u kanalskoj mreži i izbor ventilatora za
02 03 014 27 Report MM014-27 582_CCN3_2B_27_R_MM014_00
06 of fume hoods fans digestore
06 02 03 015 27 Report Split system selection Pregled predviđenih split sistema - MM015-27 582_CCN3_2B_27_R_MM015_00
06 02 03 016 27 Report Dimensioning of RHC pipeline for hot water Proračun cevne mreže dogrejača vazduha - MM016-27 582_CCN3_2B_27_R_MM016_01
06 02 03 017 27 Report Dimensioning and balancing of AHU cooling coils pipeline Proračun i balansiranje mreže hladnjaka klima komora - MM017-27 582_CCN3_2B_27_R_MM017_01
06 02 03 018 27 Report Dimensioning and balancing of AHU heating coils pipeline Proračun i balansiranje mreže grejača klima komora - MM018-27 582_CCN3_2B_27_R_MM018_01
06 02 03 019 27 Report Calculations of pipeline compensator inside of building Proračun kompenzatora cevovoda unutar objekta - MM019-27 582_CCN3_2B_27_R_MM019_00
Calculation and selection of equipment in heating
06 02 03 020 27 Report Proračun i izbor opreme u toplotnoj podstanici - MM020-27 582_CCN3_2B_27_R_MM020_01
substation
06 02 03 021 27 Report Bill of quantites Predmer i predračun radova - MM021-27 582_CCN3_2B_27_R_MM021_02
06 02 04 022 27 Report Technical specification Tehnička specifikacija - MM022-27 582_CCN3_2B_27_R_MM022_02
MS - MECHANICAL SYSTEM
06 02 04 023 27 Plan Site plan Situacija 1:500 MS100-27 582_CCN3_2B_27_D_MS100_01
06 02 04 024 27 Scheme Scheme of equipment connection in heating substation Šema veze opreme u toplotnoj podstanici - MS401-27 582_CCN3_2B_27_D_MS401_02
06 02 04 025 27 Scheme Scheme of equipment for air humidification Šema veze opreme za vlaženje vazduha - MS402-27 582_CCN3_2B_27_D_MS402_00
06 02 04 026 27 Layout Disposition of equipment in heating substation Dispozicija opreme u toplotnoj podstanici Level -1 1:25 MS501-27 582_CCN3_2B_27_D_MS501_02
MA - AIR SYSTEMS
06 02 04 027 27 Plan HVAC Air systems Vazdušni sistemi Level -1 / Part A 1:50 MA101A-27 582_CCN3_2B_27_D_MA101A_03
06 02 04 028 27 Plan HVAC Air systems Vazdušni sistemi Level -1 / Part B 1:50 MA101B-27 582_CCN3_2B_27_D_MA101B_03
06 02 04 029 27 Plan HVAC Air systems Vazdušni sistemi Level -1 / Part C 1:50 MA101C-27 582_CCN3_2B_27_D_MA101C_03
06 02 04 030 27 Plan HVAC Air systems Vazdušni sistemi Level -1 / Part D 1:50 MA101D-27 582_CCN3_2B_27_D_MA101D_03
06 02 04 031 27 Plan HVAC Air systems Vazdušni sistemi Level -1 / Part E 1:50 MA101E-27 582_CCN3_2B_27_D_MA101E_03
06 02 04 032 27 Plan HVAC Air systems Vazdušni sistemi Level -1 / Part F 1:50 MA101F-27 582_CCN3_2B_27_D_MA101F_03
06 02 04 033 27 Plan HVAC Air systems Vazdušni sistemi Level ±0 / Part A 1:50 MA102A-27 582_CCN3_2B_27_D_MA102A_03
06 02 05 034 27 Plan HVAC Air systems Vazdušni sistemi Level ±0 / Part B 1:50 MA102B-27 582_CCN3_2B_27_D_MA102B_03
06 02 05 035 27 Plan HVAC Air systems Vazdušni sistemi Level ±0 / Part C 1:50 MA102C-27 582_CCN3_2B_27_D_MA102C_03
06 02 05 036 27 Plan HVAC Air systems Vazdušni sistemi Level ±0 / Part D 1:50 MA102D-27 582_CCN3_2B_27_D_MA102D_03
06 02 05 037 27 Plan HVAC Air systems Vazdušni sistemi Level ±0 / Part E 1:50 MA102E-27 582_CCN3_2B_27_D_MA102E_03
06 02 05 039 27 Plan HVAC Air systems Vazdušni sistemi Level +1 / Part A 1:50 MA103A-27 582_CCN3_2B_27_D_MA103A_03
06 02 05 040 27 Plan HVAC Air systems Vazdušni sistemi Level +1 / Part B 1:50 MA103B-27 582_CCN3_2B_27_D_MA103B_03
06 02 05 041 27 Plan HVAC Air systems Vazdušni sistemi Level +1 / Part C 1:50 MA103C-27 582_CCN3_2B_27_D_MA103C_03
06 02 05 042 27 Plan HVAC Air systems Vazdušni sistemi Level +1 / Part D 1:50 MA103D-27 582_CCN3_2B_27_D_MA103D_03
06 02 05 043 27 Plan HVAC Air systems Vazdušni sistemi Level +1 / Part E 1:50 MA103E-27 582_CCN3_2B_27_D_MA103E_03
06 02 05 044 27 Plan HVAC Air systems Vazdušni sistemi Level +2 / Part A 1:50 MA104A-27 582_CCN3_2B_27_D_MA104A_03
06 02 05 045 27 Plan HVAC Air systems Vazdušni sistemi Level +2 / Part B 1:50 MA104B-27 582_CCN3_2B_27_D_MA104B_03
06 02 05 046 27 Plan HVAC Air systems Vazdušni sistemi Level +2 / Part C 1:50 MA104C-27 582_CCN3_2B_27_D_MA104C_03
06 02 05 047 27 Plan HVAC Air systems Vazdušni sistemi Level +2 / Part D 1:50 MA104D-27 582_CCN3_2B_27_D_MA104D_03
06 02 05 048 27 Plan HVAC Air systems Vazdušni sistemi Level +2 / Part E 1:50 MA104E-27 582_CCN3_2B_27_D_MA104E_03
06 02 05 049 27 Plan HVAC Air systems Vazdušni sistemi Technical floor / Part A 1:50 MA105A-27 582_CCN3_2B_27_D_MA105A_02
06 02 05 050 27 Plan HVAC Air systems Vazdušni sistemi Technical floor / Part B 1:50 MA105B-27 582_CCN3_2B_27_D_MA105B_02
06 02 05 051 27 Plan HVAC Air systems Vazdušni sistemi Technical floor / Part C 1:50 MA105C-27 582_CCN3_2B_27_D_MA105C_02
06 02 05 052 27 Plan HVAC Air systems Vazdušni sistemi Technical floor / Part D 1:50 MA105D-27 582_CCN3_2B_27_D_MA105D_02
06 02 05 053 27 Plan HVAC Air systems Vazdušni sistemi Technical floor / Part E 1:50 MA105E-27 582_CCN3_2B_27_D_MA105E_02
06 02 05 054 27 Section Technical floor Tehnička etaža Technical floor 01:25 MA201-27 582_CCN3_2B_27_D_MA201_01
06 02 05 055 27 Scheme Axonometric scheme of AHU 27.01 system Aksonometrijska šema sistema klima komore 27.01 MA401-27 582_CCN3_2B_27_D_MA401_01
06 02 05 056 27 Scheme Axonometric scheme of AHU 27.02 system Aksonometrijska šema sistema klima komore 27.02 MA402-27 582_CCN3_2B_27_D_MA402_01
06 02 05 057 27 Scheme Axonometric scheme of AHU 27.04 and 27.05 system Aksonometrijska šema sistema klima komore 27.04 i 27.05 MA403-27 582_CCN3_2B_27_D_MA403_01
06 02 05 058 27 Scheme Axonometric scheme of AHU 27.06 system Aksonometrijska šema sistema klima komore 27.06 MA404-27 582_CCN3_2B_27_D_MA404_01
06 02 05 059 27 Scheme Axonometric scheme of AHU 27.07 system Aksonometrijska šema sistema klima komore 27.07 MA405-27 582_CCN3_2B_27_D_MA405_01
06 02 05 060 27 Scheme Axonometric scheme of AHU 27.08 system Aksonometrijska šema sistema klima komore 27.08 MA406-27 582_CCN3_2B_27_D_MA406_01
06 02 05 061 27 Scheme Axonometric scheme of AHU 27.09 system Aksonometrijska šema sistema klima komore 27.09 MA407-27 582_CCN3_2B_27_D_MA407_01
Axonometric scheme of AHU27.10, 27.11, 27.12 and 27.13 Aksonometrijska šema sistema klima komore 27.10, 27.11, 27.12 i
062 27 Scheme MA408-27 582_CCN3_2B_27_D_MA408_01
06 02 05 system 27.13
06 02 05 063 27 Scheme Axonometric scheme of AHU 27.15 system Aksonometrijska šema sistema klima komore 27.15 MA409-27 582_CCN3_2B_27_D_MA409_01
06 02 05 064 27 Scheme Axonometric scheme of AHU 27.16 system Aksonometrijska šema sistema klima komore 27.16 MA410-27 582_CCN3_2B_27_D_MA410_01
06 02 05 065 27 Scheme Scheme of AHUs 27.01, 27.04, 27.08 and 27.15 Šeme klima komora 27.01, 27.04, 27.08 i 27.15 MA411-27 582_CCN3_2B_27_D_MA411_01
06 02 05 066 27 Scheme Scheme of AHUs 27.02, 27.05 and 27.16 Šeme klima komora 27.02, 27.05 i 27.16 MA412-27 582_CCN3_2B_27_D_MA412_01
06 02 05 067 27 Scheme Scheme of AHUs 27.03, 27.07 and 27.14 Šeme klima komora 27.03, 27.07 i 27.14 MA413-27 582_CCN3_2B_27_D_MA413_01
06 02 05 068 27 Scheme Scheme of AHUs 27.06, 27.09, 27.10, 27.11, 27.12 and 27.13 Šeme klima komora 27.06, 27.09, 27.10, 27.11, 27.12 i 27.13 MA414-27 582_CCN3_2B_27_D_MA414_01
Aksonometrijska šema sistema natpritisne ventilacije liftovskog
06 02 05 069 27 Scheme Axonometric scheme of lift pressurisation system MA415-27 582_CCN3_2B_27_D_MA415_00
okna
06 02 05 070 27 Scheme Axonometric scheme of fume hood extraction Aksonometrijske šeme ventilacionih sistema digestora MA416-27 582_CCN3_2B_27_D_MA416_00
06 02 05 071 27 Scheme AHU application scheme Aplikacione šeme klima komora MA417-27 582_CCN3_2B_27_D_MA417_02
MH - HYDRONIC SYSTEMS
06 02 06 072 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level -1 / Part A 1:50 MH101A-27 582_CCN3_2B_27_D_MH101A_02
06 02 06 073 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level -1 / Part B 1:50 MH101B-27 582_CCN3_2B_27_D_MH101B_02
06 02 06 074 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level -1 / Part C 1:50 MH101C-27 582_CCN3_2B_27_D_MH101C_02
06 02 06 075 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level -1 / Part D 1:50 MH101D-27 582_CCN3_2B_27_D_MH101D_02
06 02 06 076 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level -1 / Part E 1:50 MH101E-27 582_CCN3_2B_27_D_MH101E_02
06 02 06 077 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level -1 / Part F 1:50 MH101F-27 582_CCN3_2B_27_D_MH101F_02
06 02 06 078 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level ±0 / Part A 1:50 MH102A-27 582_CCN3_2B_27_D_MH102A_01
06 02 06 079 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level ±0 / Part B 1:50 MH102B-27 582_CCN3_2B_27_D_MH102B_01
06 02 06 080 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level ±0 / Part C 1:50 MH102C-27 582_CCN3_2B_27_D_MH102C_01
06 02 06 081 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level ±0 / Part D 1:50 MH102D-27 582_CCN3_2B_27_D_MH102D_01
06 02 06 082 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level ±0 / Part E 1:50 MH102E-27 582_CCN3_2B_27_D_MH102E_01
06 02 06 083 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +1 / Part A 1:50 MH103A-27 582_CCN3_2B_27_D_MH103A_01
06 02 06 084 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +1 / Part B 1:50 MH103B-27 582_CCN3_2B_27_D_MH103B_01
06 02 06 085 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +1 / Part C 1:50 MH103C-27 582_CCN3_2B_27_D_MH103C_01
06 02 06 086 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +1 / Part D 1:50 MH103D-27 582_CCN3_2B_27_D_MH103D_01
06 02 06 087 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +1 / Part E 1:50 MH103E-27 582_CCN3_2B_27_D_MH103E_01
06 02 06 088 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +2 / Part A 1:50 MH104A-27 582_CCN3_2B_27_D_MH104A_01
06 02 06 089 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +2 / Part C 1:50 MH104C-27 582_CCN3_2B_27_D_MH104C_01
06 02 06 090 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +2 / Part D 1:50 MH104D-27 582_CCN3_2B_27_D_MH104D_01
06 02 06 091 27 Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +2 / Part E 1:50 MH104E-27 582_CCN3_2B_27_D_MH104E_01
06 02 06 092 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level -1 / Part A 1:50 MH105A-27 582_CCN3_2B_27_D_MH105A_01
06 02 06 093 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level -1 / Part B 1:50 MH105B-27 582_CCN3_2B_27_D_MH105B_01
06 02 06 094 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level -1 / Part C 1:50 MH105C-27 582_CCN3_2B_27_D_MH105C_01
06 02 07 095 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level -1 / Part D 1:50 MH105D-27 582_CCN3_2B_27_D_MH105D_01
06 02 07 096 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level -1 / Part E 1:50 MH105E-27 582_CCN3_2B_27_D_MH105E_01
06 02 07 097 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level -1 / Part F 1:50 MH105F-27 582_CCN3_2B_27_D_MH105F_01
06 02 07 098 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level ±0 / Part A 1:50 MH106A-27 582_CCN3_2B_27_D_MH106A_01
06 02 07 099 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level ±0 / Part B 1:50 MH106B-27 582_CCN3_2B_27_D_MH106B_01
06 02 07 100 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level ±0 / Part C 1:50 MH106C-27 582_CCN3_2B_27_D_MH106C_01
06 02 07 101 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level ±0 / Part D 1:50 MH106D-27 582_CCN3_2B_27_D_MH106D_01
06 02 07 102 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level ±0 / Part E 1:50 MH106E-27 582_CCN3_2B_27_D_MH106E_01
06 02 07 103 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level +1 / Part A 1:50 MH107A-27 582_CCN3_2B_27_D_MH107A_01
06 02 07 104 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level +1 / Part B 1:50 MH107B-27 582_CCN3_2B_27_D_MH107B_01
06 02 07 105 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level +1 / Part C 1:50 MH107C-27 582_CCN3_2B_27_D_MH107C_01
06 02 07 106 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level +1 / Part D 1:50 MH107D-27 582_CCN3_2B_27_D_MH107D_01
06 02 07 107 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level +1 / Part E 1:50 MH107E-27 582_CCN3_2B_27_D_MH107E_01
06 02 07 108 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level +2 / Part C 1:50 MH108C-27 582_CCN3_2B_27_D_MH108C_01
06 02 07 109 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level +2 / Part D 1:50 MH108D-27 582_CCN3_2B_27_D_MH108D_01
06 02 07 110 27 Plan HVAC Hydronic systems - RHC system Vodeni sistemi - Sistem dogrejača vazduha Level +2 / Part E 1:50 MH108E-27 582_CCN3_2B_27_D_MH108E_01
HVAC Hydronic systems - AHU heating and cooling coils Vodeni sistemi - Cevna mreža hladnjaka i grejača u klima
111 27 Plan 1:50 MH109A-27 582_CCN3_2B_27_D_MH109A_01
06 02 07 network komorama Level +2 / Part A
HVAC Hydronic systems - AHU heating and cooling coils Vodeni sistemi - Cevna mreža hladnjaka i grejača u klima
112 27 Plan 1:50 MH109B-27 582_CCN3_2B_27_D_MH109B_01
06 02 07 network komorama Level +2 / Part B
HVAC Hydronic systems - AHU heating and cooling coils Vodeni sistemi - Cevna mreža hladnjaka i grejača u klima
113 27 Plan 1:50 MH110A-27 582_CCN3_2B_27_D_MH110A_01
06 02 07 network komorama Level +3 / Part A
HVAC Hydronic systems - AHU heating and cooling coils Vodeni sistemi - Cevna mreža hladnjaka i grejača u klima
114 27 Plan 1:50 MH110C-27 582_CCN3_2B_27_D_MH110C_01
06 02 07 network komorama Level +3 / Part C
HVAC Hydronic systems - AHU heating and cooling coils Vodeni sistemi - Cevna mreža hladnjaka i grejača u klima
115 27 Plan 1:50 MH110E-27 582_CCN3_2B_27_D_MH110E_01
06 02 07 network komorama Level +3 / Part E
06 02 07 116 27 Scheme RA system pipe scheme Štrang šema usponskih vodova radijatorskog sistema MH401-27 582_CCN3_2B_27_D_MH401_01
06 02 07 117 27 Scheme FCU system pipe scheme Štrang šema usponskih vodova sistema ventilator konvektora MH402-27 582_CCN3_2B_27_D_MH402_01
06 02 07 118 27 Scheme RHC system pipe scheme Štrang šema sistema kanalskih dogrejača vazduha MH403-27 582_CCN3_2B_27_D_MH403_01
06 02 07 119 27 Scheme AHU pipe connection scheme Šema veze hladnjaka i grejača klima komora MH404-27 582_CCN3_2B_27_D_MH404_01
Aplikacione šeme kanalskih dogrejača vazduha i ventilator
06 02 07 120 27 Scheme RHC and FCU application schemes MH405-27 582_CCN3_2B_27_D_MH405_02
konvektora
06 02 07 120a 27 Scheme Heating substation application scheme Aplikaciona šema opreme u toplotnoj podstanici MH406-27 582_CCN3_2B_27_D_MH406_00
SECTIONS AND DETAILS
06 02 07 121 27 Layout Details Detalji M501-27 582_CCN3_2B_27_D_M501_01
06 02 07 122 27 Section Section 1-1 Presek 1-1 M201-27 582_CCN3_2B_27_D_M201_01
06 02 07 123 27 Section Section 2-2 Presek 2-2 M202-27 582_CCN3_2B_27_D_M202_01
6 MECHANICAL INSTALLATIONS - BUILDING 28A
MM - MECHANICAL REPORTS
06 01 01 001 28A Report Technical report Tehnički opis - MM001-28A 582_CCN3_2B_28A_R_MM001_04
06 01 01-02 002 28A Report Heat loss calculations Proračun toplotnih gubitaka - MM002-28A 582_CCN3_2B_28A_R_MM002_02
06 01 02-04 003 28A Report Heat gain calculations Proračun toplotnih dobitaka - MM003-28A 582_CCN3_2B_28A_R_MM003_02
06 01 05 004 28A Report Radiator selection Izbor radijatorskih grejnih tela - MM004-28A 582_CCN3_2B_28A_R_MM004_01
06 01 05 005 28A Report Dimensioning and balancing of RA pipeline Proračun i balansiranje radijatorske cevne mreže - MM005-28A 582_CCN3_2B_28A_R_MM005_01
06 01 05 006 28A Report Fan Coil Units selection Izbor fan coil uređaja - MM006-28A 582_CCN3_2B_28A_R_MM006_01
06 01 05 007 28A Report Dimensioning and balancing of FCU pipeline Proračun i balansiranje fan coil cevne mreže - MM007-28A 582_CCN3_2B_28A_R_MM007_01
06 01 05 008 28A Report Air quantity calculation and selection of diffusers Proračun količina vazduha i izbor elemenata za distribuciju - MM008-28A 582_CCN3_2B_28A_R_MM008_01
06 01 05 009 28A Report Dimensioning and balancing of air duct network Proračun i balansiranje mreže vazdušnih kanala - MM009-28A 582_CCN3_2B_28A_R_MM009_02
06 01 05 010 28A Report Fire dampers specification Specifikacija protivpožarnih klapni - MM010-28A 582_CCN3_2B_28A_R_MM010_01
06 01 05 011 28A Report AHU selection report with h-x diagrams Izveštaj izbora klima komora sa h-x dijagramima - MM011-28A 582_CCN3_2B_28A_R_MM011_01
06 01 05 012 28A Report Calculation of noise reduction in air systems Proračun prigušenja buke u ventilacionim sistemima - MM012-28A 582_CCN3_2B_28A_R_MM012_01
Proračun sistema za natpritisnu ventilaciju stepeništa i liftovskih
06 01 06 013 28A Report Calculation of lift shafts overpressure ventilation - MM013-28A 582_CCN3_2B_28A_R_MM013_03
okana
Calculation of pressure drop in duct network and selection Proračun pada pritiska u kanalskoj mreži i izbor ventilatora za
06 01 06 014 28A Report MM014-28A 582_CCN3_2B_28A_R_MM014_01
of fume hoods fans digestore
06 01 06 015 28A Report Split system selection Pregled predviđenih split sistema - MM015-28A 582_CCN3_2B_28A_R_MM015_00
Proračun cevne mreže hladne i tople vode dvocevnih
01 06 016 28A Report Dimensioning of 2-pipe CB pipeline for hot and cold water - MM016-28A 582_CCN3_2B_28A_R_MM016_01
06 rashladnih greda
06 01 06 017 28A Report Dimensioning of RHC pipeline for hot water Proračun cevne mreže dogrejača vazduha - MM017-28A 582_CCN3_2B_28A_R_MM017_01
06 01 06 018 28A Report Dimensioning and balancing of AHU cooling coils pipeline Proračun i balansiranje mreže hladnjaka klima komora - MM018-28A 582_CCN3_2B_28A_R_MM018_01
06 01 06 019 28A Report Dimensioning and balancing of AHU heating coils pipeline Proračun i balansiranje mreže grejača klima komora - MM019-28A 582_CCN3_2B_28A_R_MM019_01
06 01 06 020 28A Report Calculations of pipeline compensator inside of building Proračun kompenzatora cevovoda unutar objekta - MM020-28A 582_CCN3_2B_28A_R_MM020_00
Calculation and selection of equipment in heating
06 01 06 021 28A Report Proračun i izbor opreme u toplotnoj podstanici - MM021-28A 582_CCN3_2B_28A_R_MM021_01
substation
06 01 06 022 28A Report Bill of quantites Predmer i predračun radova - MM022-28A 582_CCN3_2B_28A_R_MM022_02
06 01 06-07 023 28A Report Technical specification Tehnička specifikacija - MM023-28A 582_CCN3_2B_28A_R_MM023_02
MS - MECHANICAL SYSTEM
06 01 07 024 28A Plan Site plan Situacioni plan 1:500 MS100-28A 582_CCN3_2B_28A_D_MS100_01
06 01 07 025 28A Scheme Scheme of equipment connection in heating substation Šema veze opreme u toplotnoj podstanici MS401-28A 582_CCN3_2B_28A_D_MS401_02
06 01 07 026 28A Scheme Scheme of equipment for air humidification Šema veze opreme za vlaženje vazduha MS402-28A 582_CCN3_2B_28A_D_MS402_00
06 01 07 027 28A Layout Disposition of equipment in heating substation Dispozicija opreme u toplotnoj podstanici Level -1 1:25 MS501-28A 582_CCN3_2B_28A_D_MS501_02
MA - AIR SYSTEMS
06 01 07 028 28A Plan HVAC Air systems Sistemi obrade vazduha Level -1 / Part A 1:50 MA101A-28A 582_CCN3_2B_28A_D_MA101A_02
06 01 07 029 28A Plan HVAC Air systems Sistemi obrade vazduha Level -1 / Part B 1:50 MA101B-28A 582_CCN3_2B_28A_D_MA101B_02
06 01 07 030 28A Plan HVAC Air systems Sistemi obrade vazduha Level -1 / Part C 1:50 MA101C-28A 582_CCN3_2B_28A_D_MA101C_02
06 01 07 031 28A Plan HVAC Air systems Sistemi obrade vazduha Level -1 / Part D 1:50 MA101D-28A 582_CCN3_2B_28A_D_MA101D_02
06 01 08 032 28A Plan HVAC Air systems Sistemi obrade vazduha Level ±0 / Part A 1:50 MA102A-28A 582_CCN3_2B_28A_D_MA102A_02
06 01 08 033 28A Plan HVAC Air systems Sistemi obrade vazduha Level ±0 / Part B 1:50 MA102B-28A 582_CCN3_2B_28A_D_MA102B_02
06 01 08 034 28A Plan HVAC Air systems Sistemi obrade vazduha Level ±0 / Part C 1:50 MA102C-28A 582_CCN3_2B_28A_D_MA102C_02
06 01 08 035 28A Plan HVAC Air systems Sistemi obrade vazduha Level ±0 / Part D 1:50 MA102D-28A 582_CCN3_2B_28A_D_MA102D_02
06 01 08 036 28A Plan HVAC Air systems Sistemi obrade vazduha Level +1 / Part A 1:50 MA103A-28A 582_CCN3_2B_28A_D_MA103A_02
06 01 08 037 28A Plan HVAC Air systems Sistemi obrade vazduha Level +1 / Part B 1:50 MA103B-28A 582_CCN3_2B_28A_D_MA103B_02
06 01 08 038 28A Plan HVAC Air systems Sistemi obrade vazduha Level +1 / Part C 1:50 MA103C-28A 582_CCN3_2B_28A_D_MA103C_02
06 01 08 039 28A Plan HVAC Air systems Sistemi obrade vazduha Level +1 / Part D 1:50 MA103D-28A 582_CCN3_2B_28A_D_MA103D_02
06 01 08 040 28A Plan HVAC Air systems Sistemi obrade vazduha Level +2 / Part A 1:50 MA104A-28A 582_CCN3_2B_28A_D_MA104A_02
06 01 08 041 28A Plan HVAC Air systems Sistemi obrade vazduha Level +2 / Part B 1:50 MA104B-28A 582_CCN3_2B_28A_D_MA104B_02
06 01 08 042 28A Plan HVAC Air systems Sistemi obrade vazduha Level +2 / Part C 1:50 MA104C-28A 582_CCN3_2B_28A_D_MA104C_02
06 01 08 043 28A Plan HVAC Air systems Sistemi obrade vazduha Level +2 / Part D 1:50 MA104D-28A 582_CCN3_2B_28A_D_MA104D_02
06 01 08 044 28A Plan HVAC Air systems Sistemi obrade vazduha Level +3 / Part A 1:50 MA105A-28A 582_CCN3_2B_28A_D_MA105A_02
06 01 08 045 28A Plan HVAC Air systems Sistemi obrade vazduha Level +3 / Part B 1:50 MA105B-28A 582_CCN3_2B_28A_D_MA105B_02
06 01 08 046 28A Plan HVAC Air systems Sistemi obrade vazduha Level +3 / Part C 1:50 MA105C-28A 582_CCN3_2B_28A_D_MA105C_02
06 01 08 047 28A Plan HVAC Air systems Sistemi obrade vazduha Level +3 / Part D 1:50 MA105D-28A 582_CCN3_2B_28A_D_MA105D_02
06 01 08 048 28A Plan HVAC Air systems Sistemi obrade vazduha Level +4 / Part A 1:50 MA106A-28A 582_CCN3_2B_28A_D_MA106A_02
06 01 08 049 28A Plan HVAC Air systems Sistemi obrade vazduha Level +4 / Part B 1:50 MA106B-28A 582_CCN3_2B_28A_D_MA106B_02
06 01 08 050 28A Plan HVAC Air systems Sistemi obrade vazduha Level +4 / Part C 1:50 MA106C-28A 582_CCN3_2B_28A_D_MA106C_02
06 01 08 051 28A Plan HVAC Air systems Sistemi obrade vazduha Level +4 / Part D 1:50 MA106D-28A 582_CCN3_2B_28A_D_MA106D_02
06 01 08 052 28A Plan HVAC Air systems Sistemi obrade vazduha Level +5 / Part A 1:50 MA107A-28A 582_CCN3_2B_28A_D_MA107A_02
06 01 08 053 28A Plan HVAC Air systems Sistemi obrade vazduha Level +5 / Part B 1:50 MA107B-28A 582_CCN3_2B_28A_D_MA107B_02
06 01 08 054 28A Plan HVAC Air systems Sistemi obrade vazduha Level +5 / Part C 1:50 MA107C-28A 582_CCN3_2B_28A_D_MA107C_02
06 01 08 055 28A Plan HVAC Air systems Sistemi obrade vazduha Level +5 / Part D 1:50 MA107D-28A 582_CCN3_2B_28A_D_MA107D_02
06 01 08 056 28A Plan HVAC Air systems Sistemi obrade vazduha Technical floor / Part A 1:50 MA108A-28A 582_CCN3_2B_28A_D_MA108A_02
06 01 08 057 28A Plan HVAC Air systems Sistemi obrade vazduha Technical floor / Part B 1:50 MA108B-28A 582_CCN3_2B_28A_D_MA108B_02
06 01 08 058 28A Plan HVAC Air systems Sistemi obrade vazduha Technical floor / Part C 1:50 MA108C-28A 582_CCN3_2B_28A_D_MA108C_02
06 01 08 059 28A Plan HVAC Air systems Sistemi obrade vazduha Technical floor / Part D 1:50 MA108D-28A 582_CCN3_2B_28A_D_MA108D_02
06 01 08 060 28A Plan HVAC Air systems Sistemi obrade vazduha Roof floor / Part A 1:50 MA109A-28A 582_CCN3_2B_28A_D_MA109A_02
06 01 08 061 28A Plan HVAC Air systems Sistemi obrade vazduha Roof floor / Part B 1:50 MA109B-28A 582_CCN3_2B_28A_D_MA109B_02
06 01 08 062 28A Plan HVAC Air systems Sistemi obrade vazduha Roof floor / Part C 1:50 MA109C-28A 582_CCN3_2B_28A_D_MA109C_02
06 01 08 063 28A Plan HVAC Air systems Sistemi obrade vazduha Roof floor / Part D 1:50 MA109D-28A 582_CCN3_2B_28A_D_MA109D_02
06 01 08 064 28A Scheme Axonometric scheme of AHU 28A.01 system Aksonometrijska šema sistema klima komore 28A.01 MA401-28A 582_CCN3_2B_28A_D_MA401_01
06 01 08 065 28A Scheme Axonometric scheme of AHU 28A.02 system Aksonometrijska šema sistema klima komore 28A.02 MA402-28A 582_CCN3_2B_28A_D_MA402_01
06 01 09 066 28A Scheme Axonometric scheme of AHU 28A.04 system Aksonometrijska šema sistema klima komore 28A.04 MA403-28A 582_CCN3_2B_28A_D_MA403_01
06 01 09 067 28A Scheme Axonometric scheme of AHU 28A.05 system Aksonometrijska šema sistema klima komore 28A.05 MA404-28A 582_CCN3_2B_28A_D_MA404_01
06 01 09 068 28A Scheme Axonometric scheme of AHU 28A.07 system Aksonometrijska šema sistema klima komore 28A.07 MA405-28A 582_CCN3_2B_28A_D_MA405_01
06 01 09 069 28A Scheme Axonometric scheme of AHU 28A.20 system Aksonometrijska šema sistema klima komore 28A.20 MA406-28A 582_CCN3_2B_28A_D_MA406_01
Axonometric scheme of AHU 28A.01, 28A.04, 28A.09 and Aksonometrijske šeme sistema klima komora 28A.01, 28A.04,
06 01 070 28A Scheme MA407-28A 582_CCN3_2B_28A_D_MA407_01
09 28A.18 28A.09 i 28A.18
Axonometric scheme of AHU 28A.02, 28A.06, 28A.07, 28A.15 Aksonometrijske šeme sistema klima komora 28A.02, 28A.06,
06 01 071 28A Scheme MA408-28A 582_CCN3_2B_28A_D_MA408_01
09 and 28A.19 28A.07, 28A.15 i 28A.19
Axonometric scheme of AHU 28A.03, 28A.10, 28A.12, 28A.14, Aksonometrijske šeme sistema klima komora 28A.03, 28A.10,
06 01 072 28A Scheme MA409-28A 582_CCN3_2B_28A_D_MA409_01
09 28A.16 and 28A.20 28A.12, 28A.14, 28A.16 i 28A.20
Axonometric scheme of AHU 28A.05, 28A.08, 28A.11, 28A.13 Aksonometrijske šeme sistema klima komora 28A.05, 28A.08,
06 01 073 28A Scheme MA410-28A 582_CCN3_2B_28A_D_MA410_01
09 and 28A.17 28A.11, 28A.13 i 28A.17
06 01 09 075 28A Scheme Axonometric scheme of staircases pressurisation system Aksonometrijske šeme sistema natpritisne ventilacije stepeništa MA412-28A 582_CCN3_2B_28A_D_MA411_00
Aksonometrijske šeme sistema natpritisne ventilacije tampon
076 28A Scheme Axonometric scheme of lifts and filters pressurisation system MA413-28A 582_CCN3_2B_28A_D_MA412_00
06 01 09 zona i liftovskih okana
06 01 09 077 28A Scheme Axonometric scheme of fume hood exctraction Aksonometrijska šema ventilacionih sistema digestora MA414-28A 582_CCN3_2B_28A_D_MA413_00
06 01 09 078 28A Scheme AHU application scheme Aplikacione šeme klima komora MA415-28A 582_CCN3_2B_28A_D_MA414_02
06 01 09 079 28A Scheme Smoke extraction and pressurisation application scheme Aplikaciona šema sistema natpritisne ventilacije MA416-28A 582_CCN3_2B_28A_D_MA415_00
MH - HYDRONIC SYSTEMS
06 01 09 080 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level -1 / Part A 1:50 MH101A-28A 582_CCN3_2B_28A_D_MH101A_01
06 01 09 081 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level -1 / Part B 1:50 MH101B-28A 582_CCN3_2B_28A_D_MH101B_01
06 01 09 082 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level -1 / Part C 1:50 MH101C-28A 582_CCN3_2B_28A_D_MH101C_01
06 01 09 083 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level -1 / Part D 1:50 MH101D-28A 582_CCN3_2B_28A_D_MH101D_01
06 01 09 084 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level ±0 / Part A 1:50 MH102A-28A 582_CCN3_2B_28A_D_MH102A_01
06 01 09 085 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level ±0 / Part B 1:50 MH102B-28A 582_CCN3_2B_28A_D_MH102B_01
06 01 09 086 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level ±0 / Part C 1:50 MH102C-28A 582_CCN3_2B_28A_D_MH102C_01
06 01 09 087 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level ±0 / Part D 1:50 MH102D-28A 582_CCN3_2B_28A_D_MH102D_01
06 01 09 088 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +1 / Part A 1:50 MH103A-28A 582_CCN3_2B_28A_D_MH103A_01
06 01 09 089 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +1 / Part B 1:50 MH103B-28A 582_CCN3_2B_28A_D_MH103B_01
06 01 09 090 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +1 / Part C 1:50 MH103C-28A 582_CCN3_2B_28A_D_MH103C_01
06 01 09 091 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +1 / Part D 1:50 MH103D-28A 582_CCN3_2B_28A_D_MH103D_01
06 01 09 092 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +2 / Part A 1:50 MH104A-28A 582_CCN3_2B_28A_D_MH104A_01
06 01 09 093 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +2 / Part B 1:50 MH104B-28A 582_CCN3_2B_28A_D_MH104B_01
06 01 09 094 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +2 / Part C 1:50 MH104C-28A 582_CCN3_2B_28A_D_MH104C_01
06 01 09 095 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +2 / Part D 1:50 MH104D-28A 582_CCN3_2B_28A_D_MH104D_01
06 01 09 096 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +3 / Part A 1:50 MH105A-28A 582_CCN3_2B_28A_D_MH105A_01
06 01 09 097 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +3 / Part B 1:50 MH105B-28A 582_CCN3_2B_28A_D_MH105B_01
06 01 09 098 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +3 / Part C 1:50 MH105C-28A 582_CCN3_2B_28A_D_MH105C_01
06 01 09 099 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +3 / Part D 1:50 MH105D-28A 582_CCN3_2B_28A_D_MH105D_01
06 01 09 100 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +4 / Part A 1:50 MH106A-28A 582_CCN3_2B_28A_D_MH106A_01
06 01 09 101 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +4 / Part B 1:50 MH106B-28A 582_CCN3_2B_28A_D_MH106B_01
06 01 09 102 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +4 / Part C 1:50 MH106C-28A 582_CCN3_2B_28A_D_MH106C_01
06 01 09 103 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +4 / Part D 1:50 MH106D-28A 582_CCN3_2B_28A_D_MH106D_01
06 01 09 104 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +5 / Part A 1:50 MH107A-28A 582_CCN3_2B_28A_D_MH107A_01
06 01 10 105 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +5 / Part B 1:50 MH107B-28A 582_CCN3_2B_28A_D_MH107B_01
06 01 10 106 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +5 / Part C 1:50 MH107C-28A 582_CCN3_2B_28A_D_MH107C_01
06 01 10 107 28A Plan HVAC Hydronic systems - RA and FCU system Vodeni sistemi - Radijatorski i Fan Coil sistem Level +5 / Part D 1:50 MH107D-28A 582_CCN3_2B_28A_D_MH107D_01
06 01 10 108 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level -1 / Part A 1:50 MH108A-28A 582_CCN3_2B_28A_D_MH108A_01
06 01 10 109 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level -1 / Part B 1:50 MH108B-28A 582_CCN3_2B_28A_D_MH108B_01
06 01 10 110 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level -1 / Part C 1:50 MH108C-28A 582_CCN3_2B_28A_D_MH108C_01
06 01 10 111 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level -1 / Part D 1:50 MH108D-28A 582_CCN3_2B_28A_D_MH108D_01
06 01 10 112 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level ±0 / Part A 1:50 MH109A-28A 582_CCN3_2B_28A_D_MH109A_01
06 01 10 113 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level ±0 / Part B 1:50 MH109B-28A 582_CCN3_2B_28A_D_MH109B_01
06 01 10 114 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level ±0 / Part C 1:50 MH109C-28A 582_CCN3_2B_28A_D_MH109C_01
06 01 10 115 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level ±0 / Part D 1:50 MH109D-28A 582_CCN3_2B_28A_D_MH109D_01
06 01 10 116 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +1 / Part A 1:50 MH110A-28A 582_CCN3_2B_28A_D_MH110A_01
06 01 10 117 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +1 / Part B 1:50 MH110B-28A 582_CCN3_2B_28A_D_MH110B_01
06 01 10 118 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +1 / Part C 1:50 MH110C-28A 582_CCN3_2B_28A_D_MH110C_01
06 01 10 119 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +1 / Part D 1:50 MH110D-28A 582_CCN3_2B_28A_D_MH110D_01
06 01 10 120 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +2 / Part A 1:50 MH111A-28A 582_CCN3_2B_28A_D_MH111A_01
06 01 10 121 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +2 / Part B 1:50 MH111B-28A 582_CCN3_2B_28A_D_MH111B_01
06 01 10 122 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +2 / Part C 1:50 MH111C-28A 582_CCN3_2B_28A_D_MH111C_01
06 01 10 123 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +2 / Part D 1:50 MH111D-28A 582_CCN3_2B_28A_D_MH111D_01
06 01 10 124 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +3 / Part A 1:50 MH112A-28A 582_CCN3_2B_28A_D_MH112A_01
06 01 10 125 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +3 / Part B 1:50 MH112B-28A 582_CCN3_2B_28A_D_MH112B_01
06 01 10 126 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +3 / Part C 1:50 MH112C-28A 582_CCN3_2B_28A_D_MH112C_01
06 01 10 127 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +3 / Part D 1:50 MH112D-28A 582_CCN3_2B_28A_D_MH112D_01
06 01 11 128 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +4 / Part A 1:50 MH113A-28A 582_CCN3_2B_28A_D_MH113A_01
06 01 11 129 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +4 / Part B 1:50 MH113B-28A 582_CCN3_2B_28A_D_MH113B_01
06 01 11 130 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +4 / Part C 1:50 MH113C-28A 582_CCN3_2B_28A_D_MH113C_01
06 01 11 131 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +4 / Part D 1:50 MH113D-28A 582_CCN3_2B_28A_D_MH113D_01
06 01 11 132 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +5 / Part A 1:50 MH114A-28A 582_CCN3_2B_28A_D_MH114A_01
06 01 11 133 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +5 / Part B 1:50 MH114B-28A 582_CCN3_2B_28A_D_MH114B_01
06 01 11 134 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +5 / Part C 1:50 MH114C-28A 582_CCN3_2B_28A_D_MH114C_01
06 01 11 135 28A Plan HVAC Hydronic systems - RHC and CB system Vodeni sistemi - Sistem dogrejača vazduha i rashl. greda Level +5 / Part D 1:50 MH114D-28A 582_CCN3_2B_28A_D_MH114D_01
06 01 11 136 28A Plan HVAC Hydronic systems - AHU RHC network Vodeni sistemi - Sistem dogrejača u klima komorama Technical floor 1:100 MH115-28A 582_CCN3_2B_28A_D_MH115_01
HVAC Hydronic systems - AHU heating and cooling coils Vodeni sistemi - Cevna mreža hladnjaka i grejača u klima
06 01 11 137 28A Plan Technical floor / Part A 1:50 MA116A-28A 582_CCN3_2B_28A_D_MA116A_01
network and air humidification equipment komorama i oprema za vlaženje vazduha
HVAC Hydronic systems - AHU heating and cooling coils Vodeni sistemi - Cevna mreža hladnjaka i grejača u klima
06 01 11 138 28A Plan Technical floor / Part B 1:50 MA116B-28A 582_CCN3_2B_28A_D_MA116B_01
network and air humidification equipment komorama i oprema za vlaženje vazduha
HVAC Hydronic systems - AHU heating and cooling coils Vodeni sistemi - Cevna mreža hladnjaka i grejača u klima
06 01 11 139 28A Plan Technical floor / Part C 1:50 MA116C-28A 582_CCN3_2B_28A_D_MA116C_01
network and air humidification equipment komorama i oprema za vlaženje vazduha
HVAC Hydronic systems - AHU heating and cooling coils Vodeni sistemi - Cevna mreža hladnjaka i grejača u klima
06 01 11 140 28A Plan Technical floor / Part D 1:50 MA116D-28A 582_CCN3_2B_28A_D_MA116D_01
network and air humidification equipment komorama i oprema za vlaženje vazduha
06 01 11 141 28A Scheme RA system pipe scheme Štrang šema usponskih vodova radijatorskog sistema MH401-28A 582_CCN3_2B_28A_D_MH401_01
06 01 11 142 28A Scheme FCU system pipe scheme Štrang šema usponskih vodova ventilator konvektora MH402-28A 582_CCN3_2B_28A_D_MH402_01
06 01 11 143 28A Scheme RHC system pipe scheme Štrang šema sistema kanalskih dogrejača vazduha MH403-28A 582_CCN3_2B_28A_D_MH403_01
06 01 11 144 28A Scheme 2-pipe CB system pipe scheme Štrang šema sistema dvocevnih rashladnih greda MH404-28A 582_CCN3_2B_28A_D_MH404_01
06 01 11 145 28A Scheme AHUs pipe connection scheme Šema veze grejača i hladnjaka klima komora MH405-28A 582_CCN3_2B_28A_D_MH405_01
Aplikacione šeme kanalskih dogrejača vazduha, ventilator-
06 01 11 146 28A Scheme RHC, FCU and CB application schemes MH406-28A 582_CCN3_2B_28A_D_MH406_02
konvektora i rashladnih greda
06 01 11 146a 28A Scheme Heating substation application scheme Aplikaciona šema opreme u toplotnoj podstanici MH407-28A 582_CCN3_2B_28A_D_MH407_00
SECTIONS AND DETAILS
06 01 11 147 28A Section Section 1-1 - mechanical equipment Presek 1-1 - mašinska oprema 1:50 M201-28A 582_CCN3_2B_28A_D_M201_01
06 01 11 148 28A Section Section 2-2 - mechanical equipment Presek 2-2 - mašinska oprema 1:50 M202-28A 582_CCN3_2B_28A_D_M202_01
06 01 11 149 28A Section Synchronized sections of all installations in false ceiling Sinhonizovan presek svih instalacija u spuštenom plafonu 1:50 M203-28A 582_CCN3_2B_28A_D_M203_00
06 01 11 150 28A Layout Details Detalji Various M501-28A 582_CCN3_2B_28A_D_M501_02
6 MECHANICAL INSTALLATIONS - TECHNICAL BLOCK T1
MM - MECHANICAL REPORTS
06 03 001 T1 Report Technical report Tehnički opis - MM001-T1 582_CCN3_2B_T1_R_MM001_01
06 03 002 T1 Report Split system selection Pregled predviđenih split sistema - MM002-T1 582_CCN3_2B_T1_R_MM002_00
06 03 003 T1 Report Calculation and selection of equipment in technical block Proračun i izbor opreme u tehničkom bloku T1 - MM003-T1 582_CCN3_2B_T1_R_MM003_00
T1
06 03 004 T1 Report Bill of quantity Predmer i predračun radova - MM004-T1 582_CCN3_2B_T1_R_MM004_01
06 03 005 T1 Report Technical specification Tehnička specifikacija - MM005-T1 582_CCN3_2B_T1_R_MM005_01
MS - MECHANICAL SYSTEM
06 03 006 T1 Plan Site plan Situacija 1:500 MS100-T1 582_CCN3_2B_T1_D_MS100_00
06 03 007 T1 Scheme Scheme of equipment connection in technical block T1 Šema veze opreme u tehničkom bloku T1 - MS401-T1 582_CCN3_2B_T1_D_MS401_00
06 03 008 T1 Scheme Connection scheme of diesel generators and reservoirs Šema veze dizel agregata sa rezervoarima - MS402-T1 582_CCN3_2B_T1_D_MS402_00
06 03 009 T1 Layout Disposition of equipment in technical block T1 Dispozicija opreme u tehničkom bloku T1 1:50 MS501-T1 582_CCN3_2B_T1_D_MS501_01
06 03 010 T1 Section Section through diesel generator room Presek kroz prostoriju dizel agregata 1:50 MS201-T1 582_CCN3_2B_T1_D_MS201_00
06 03 011 T1 Scheme Chiller plant aplication scheme Aplikaciona šema opreme u čilerskom postrojenju - MS403-T1 582_CCN3_2B_T1_D_MS403_00
6 MECHANICAL INSTALLATIONS - TECHNICAL BLOCK T2
MM - MECHANICAL REPORTS
6 04 001 T2 Report Technical report Tehnički opis - MM001-T2 582_CCN3_2B_T2_R_MM001_01
6 04 002 T2 Report Split system selection Pregled predviđenih split sistema - MM002-T2 582_CCN3_2B_T2_R_MM002_00
6 04 003 T2 Report Bill of quantity Predmer i predračun radova - MM003-T2 582_CCN3_2B_T2_R_MM003_01
6 04 004 T2 Report Technical specification Tehnička specifikacija - MM004-T2 582_CCN3_2B_T2_R_MM004_01
MS - MECHANICAL SYSTEM
6 04 005 T2 Plan Site plan Situacija 1:500 MS100-T2 582_CCN3_2B_T2_D_MS100_01
6 04 006 T2 Plan Equipment Raspored opreme 1:50 MS101-T2 582_CCN3_2B_T2_D_MS101_01
DOCUMENT LIST
STAGE III: Design and Tender documents
Phase 2: Detailed Design and Tender Documents
Step B : Final Detailed Design
CLINICAL CENTER OF NIŠ - CCN
Niš

Document
Volume Book Section Prog. Bld. Type English Description Serbian Description Level Scale File Name
Name

MEDICAL GASES INSTALLATION - CCN 27


MG - REPORTS
07 02 01 001 27 Report Technical description - building 27 Tehnički opis - zgrada 27 - MG001-27 582_CCN3_2B_27_R_MG001_03
07 02 01 002 27 Report Calculation report - building 28A Proračun - zgrada 27 - MG002-27 582_CCN3_2B_27_R_MG002_03
07 02 01 003 27 Report Bill of Quantities - building 27 Predmer i predračun radova - zgrada 27 - MG003-27 582_CCN3_2B_27_R_MG003_02
07 02 01 004 27 Report Technical Specifications - building 27 Tehnička specifikacija - zgrada 27 - MG004-27 582_CCN3_2B_27_R_MG004_01
MG - DRAWINGS
07 02 01 006 27 Plan Medical gas systems Sistemi medicinskih gasova Level -1 / Part A 1:100 MG101A-27 582_CCN3_2B_27_D_MG101A_04
07 02 01 007 27 Plan Medical gas systems Sistemi medicinskih gasova Level -1 / Part B 1:100 MG101B-27 582_CCN3_2B_27_D_MG101B_04
07 02 01 008 27 Plan Medical gas systems Sistemi medicinskih gasova Level ±0 / Part A 1:100 MG102A-27 582_CCN3_2B_27_D_MG102A_04
07 02 01 009 27 Plan Medical gas systems Sistemi medicinskih gasova Level ±0 / Part B 1:100 MG102B-27 582_CCN3_2B_27_D_MG102B_04
07 02 01 010 27 Plan Medical gas systems Sistemi medicinskih gasova Level +1 / Part A 1:100 MG103A-27 582_CCN3_2B_27_D_MG103A_04
07 02 01 011 27 Plan Medical gas systems Sistemi medicinskih gasova Level +1 / Part B 1:100 MG103B-27 582_CCN3_2B_27_D_MG103B_04
07 02 01 012 27 Plan Medical gas systems Sistemi medicinskih gasova Level +2 / Part A 1:100 MG104A-27 582_CCN3_2B_27_D_MG104A_04
07 02 01 013 27 Plan Medical gas systems Sistemi medicinskih gasova Level +2 / Part B 1:100 MG104B-27 582_CCN3_2B_27_D_MG104B_04
07 02 01 014 27 Scheme Medical gas systems - Axonometry Sistemi medicinskih gasova - Aksonometrija Level -1 - MG401-27 582_CCN3_2B_27_D_MG401_00
07 02 01 015 27 Scheme Medical gas systems - Axonometry Sistemi medicinskih gasova - Aksonometrija Level ±0 - MG402-27 582_CCN3_2B_27_D_MG402_00
07 02 01 016 27 Scheme Medical gas systems - Axonometry Sistemi medicinskih gasova - Aksonometrija Level +1 - MG403-27 582_CCN3_2B_27_D_MG403_00
07 02 01 017 27 Scheme Medical gas systems - Axonometry Sistemi medicinskih gasova - Aksonometrija Level +2 - MG404-27 582_CCN3_2B_27_D_MG404_00
07 02 01 018 27 Scheme Medical gas systems - Axonometry Sistemi medicinskih gasova - Aksonometrija All - MG405-27 582_CCN3_2B_27_D_MG405_03
07 02 01 019 27 Sections Medical gas systems - Typical sections Sistemi medicinskih gasova - Tipski preseci - - MG202-27 582_CCN3_2B_27_D_MG201_02
MEDICAL GASES INSTALLATION - CCN 28A
MG - REPORTS
07 01 01 001 28A Report Technical description - building 28A Tehnički opis - zgrada 28A - MG001-28A 582_CCN3_2B_28A_R_MG001_03
07 01 01 002 28A Report Calculation report - building 28A Proračun - zgrada 28A - MG002-28A 582_CCN3_2B_28A_R_MG002_03
07 01 01 003 28A Report Bill of Quantities - building 28A Predmer i predračun radova - zgrada 28A - MG003-28A 582_CCN3_2B_28A_R_MG003_02
07 01 01 004 28A Report Technical Specifications - building 28A Tehnička specifikacija - zgrada 28A - MG004-28A 582_CCN3_2B_28A_R_MG004_01
MG - DRAWINGS
07 01 01 006 28A Plan Medical gas systems Sistemi medicinskih gasova Level -1 1:100 MG101-28A 582_CCN3_2B_28A_D_MG101_03
07 01 01 007 28A Plan Medical gas systems Sistemi medicinskih gasova Level ±0 1:100 MG102-28A 582_CCN3_2B_28A_D_MG102_03
07 01 01 008 28A Plan Medical gas systems Sistemi medicinskih gasova Level +1 1:100 MG103-28A 582_CCN3_2B_28A_D_MG103_03
07 01 01 009 28A Plan Medical gas systems Sistemi medicinskih gasova Level +2 1:100 MG104-28A 582_CCN3_2B_28A_D_MG104_03
07 01 01 010 28A Plan Medical gas systems Sistemi medicinskih gasova Level +3 1:100 MG105-28A 582_CCN3_2B_28A_D_MG105_03
DOCUMENT LIST
STAGE III: Design and Tender documents
Phase 2: Detailed Design and Tender Documents
Step B : Final Detailed Design
CLINICAL CENTER OF NIŠ - CCN
Niš

Document
Volume Book Section Prog. Bld. Type English Description Serbian Description Level Scale File Name
Name

07 01 01 011 28A Plan Medical gas systems Sistemi medicinskih gasova Level +4 1:100 MG106-28A 582_CCN3_2B_28A_D_MG106_03
07 01 01 012 28A Plan Medical gas systems Sistemi medicinskih gasova Level +5 1:100 MG107-28A 582_CCN3_2B_28A_D_MG107_03
07 01 01 013 28A Plan Medical gas systems Sistemi medicinskih gasova Technical level 1:100 MG108-28A 582_CCN3_2B_28A_D_MG108_03
07 01 01 014 28A Scheme Medical gas systems - Axonometry Sistemi medicinskih gasova - Aksonometrija Level -1 - MG401-28A 582_CCN3_2B_28A_D_MG401_03
07 01 01 015 28A Scheme Medical gas systems - Axonometry Sistemi medicinskih gasova - Aksonometrija Level ±0 - MG402-28A 582_CCN3_2B_28A_D_MG402_03
07 01 01 016 28A Scheme Medical gas systems - Axonometry Sistemi medicinskih gasova - Aksonometrija Level +1 - MG403-28A 582_CCN3_2B_28A_D_MG403_03
07 01 01 017 28A Scheme Medical gas systems - Axonometry Sistemi medicinskih gasova - Aksonometrija Level +2 - MG404-28A 582_CCN3_2B_28A_D_MG404_03
07 01 01 018 28A Scheme Medical gas systems - Axonometry Sistemi medicinskih gasova - Aksonometrija Level +3 - MG405-28A 582_CCN3_2B_28A_D_MG405_03
07 01 01 019 28A Scheme Medical gas systems - Axonometry Sistemi medicinskih gasova - Aksonometrija Level +4 - MG406-28A 582_CCN3_2B_28A_D_MG406_03
07 01 01 020 28A Scheme Medical gas systems - Axonometry Sistemi medicinskih gasova - Aksonometrija Level +5 - MG407-28A 582_CCN3_2B_28A_D_MG407_03
07 01 01 021 28A Scheme Medical gas systems - Axonometry Sistemi medicinskih gasova - Aksonometrija Technical level - MG408-28A 582_CCN3_2B_28A_D_MG408_03
07 01 01 022 28A Sections Medical gas systems - Typical sections Sistemi medicinskih gasova - Tipski preseci - - MG202-28A 582_CCN3_2B_28A_D_MG202_02
MEDICAL GASES INSTALLATION - T2
MG - REPORTS
07 03 01 001 T2 Report Technical description - building T2 Tehnički opis - zgrada T2 - MG001-T2 582_CCN3_2B_T2_R_MG001_03
07 03 01 002 T2 Report Calculation report - building T2 Proračun - zgrada T2 - MG002-T2 582_CCN3_2B_T2_R_MG002_03
07 03 01 003 T2 Report Bill of Quantities - building T2 Predmer i predračun radova - zgrada T2 - MG003-T2 582_CCN3_2B_T2_R_MG003_01
07 03 01 004 T2 Report Technical Specifications - building T2 Tehnička specifikacija - zgrada T2 - MG004-T2 582_CCN3_2B_T2_R_MG004_01
MG - DRAWINGS
Site plan & scheme of medical gases
07 03 01 005 T2 Plan Situcaioni plan i šeme stanice mediciskih gasova - MG101-T2 582_CCN3_2B_T2_D_MG101_02
station
07 03 01 006 T2 Scheme Equipment connection in medical gases Šema veze opreme u stanici medicinskih gasova - MG401-T2 582_CCN3_2B_T2_D_MG401_02
station
Layout of equipment in medical gases
07 03 01 007 T2 Layout Dispozicija opreme u stanci medicinskih gasova 1:50 MG501-T2 582_CCN3_2B_T2_D_MG501_02
station
DOCUMENT LIST
STAGE III: Design and Tender documents
Phase 2: Detailed Design and Tender Documents
Step B : Final Detailed Design
CLINICAL CENTER OF NIŠ - CCN
Niš
Document
Volume Book Section Prog. Blg. Type English Description Serbian Description Level Scale File Name
Name
SPRINKLER INSTALLATIONS - BUILDING 27
MF - SPRINKLER REPORTS
08 02 01 001 27 Report Technical report of sprinkler installation Tehnički opis sprinkler instalacije - MF001-27 582_CCN3_2B_27_R_MF001_02
08 02 01 002 27 Report Sprinkler calculations Sprinkler proračuni - MF002-27 582_CCN3_2B_27_R_MF002_03
08 02 01 003 27 Report Bill of quantity Predmer i predračun - MF003-27 582_CCN3_2B_27_R_MF003_02
08 02 01 004 27 Report Technical specification Tehnička specifikacija - MF004-27 582_CCN3_2B_27_R_MF004_00
3
08 01 01 005 27 Plan Site plan Situacioni plan 1:500 MF100-27 582_CCN3_2B_27_D_MF100_01
08 02 01 006 27 Plan Instalation disposition Dispozicija instalacije Level -1 1:100 MF101A-27 582_CCN3_2B_27_D_MF101A_03
08 02 01 007 27 Plan Instalation disposition Dispozicija instalacije Level -1 1:100 MF101B-27 582_CCN3_2B_27_D_MF101B_03
08 02 01 008 27 Plan Instalation disposition Dispozicija instalacije Level ±0 1:100 MF102A-27 582_CCN3_2B_27_D_MF102A_03
08 02 01 009 27 Plan Instalation disposition Dispozicija instalacije Level ±0 1:100 MF102B-27 582_CCN3_2B_27_D_MF102B_03
08 02 01 010 27 Plan Instalation disposition Dispozicija instalacije Level +1 1:100 MF103A-27 582_CCN3_2B_27_D_MF103A_03
08 02 01 011 27 Plan Instalation disposition Dispozicija instalacije Level +1 1:100 MF103B-27 582_CCN3_2B_27_D_MF103B_03
08 02 01 012 27 Plan Instalation disposition Dispozicija instalacije Level +2 1:100 MF104-27 582_CCN3_2B_27_D_MF104_03
08 02 01 013 27 Scheme Flow scheme Šema delovanja MF401-27 582_CCN3_2B_27_D_MF401_03
08 02 01 014 27 Scheme Isometric scheme Izometrijska šema Level -1 MF402-27 582_CCN3_2B_27_D_MF402_02
08 02 01 015 27 Scheme Isometric scheme Izometrijska šema Level ±0 MF403-27 582_CCN3_2B_27_D_MF403_02
08 02 01 016 27 Scheme Isometric scheme Izometrijska šema Level +1 MF404-27 582_CCN3_2B_27_D_MF404_02
08 02 01 017 27 Scheme Isometric scheme Izometrijska šema Level +2 MF405-27 582_CCN3_2B_27_D_MF405_02
08 02 01 018 27 Section Section Presek 1:100 MF201-27 582_CCN3_2B_27_D_MF201_03
08 02 01 019 27 Layout Details Detalji MF502-27 582_CCN3_2B_27_D_MF502_01
SPRINKLER INSTALLATIONS - BUILDING 28A
MF - SPRINKLER REPORTS
08 01 01 001 28A Report Technical report of sprinkler installation Tehnički opis sprinkler instalacije - MF001-28A 582_CCN3_2B_28A_R_MF001_02
08 01 01 002 28A Report Sprinkler calculations Sprinkler proračuni - MF002-28A 582_CCN3_2B_28A_R_MF002_02
08 01 01 003 28A Report Bill of quantity Predmer i predračun - MF004-28A 582_CCN3_2B_28A_R_MF003_02
08 01 01 004 28A Report Technical specification Tehnička specifikacija - MF005-28A 582_CCN3_2B_28A_R_MF004_00
SPRINKLER SYSTEM DRAWINGS
08 01 01 005 28A Plan Site plan Situacioni plan 1:500 MF100-28A 582_CCN3_2B_28A_D_MF100_01
08 01 01 006 28A Plan Instalation disposition Dispozicija instalacije Level -1 1:100 MF101-28A 582_CCN3_2B_28A_D_MF101_03
08 01 01 007 28A Plan Instalation disposition Dispozicija instalacije Level ±0 1:100 MF102-28A 582_CCN3_2B_28A_D_MF102_03
08 01 01 008 28A Plan Instalation disposition Dispozicija instalacije Level +1 1:100 MF103-28A 582_CCN3_2B_28A_D_MF103_03
08 01 01 009 28A Plan Instalation disposition Dispozicija instalacije Level +2 1:100 MF104-28A 582_CCN3_2B_28A_D_MF104_04
08 01 01 010 28A Plan Instalation disposition Dispozicija instalacije Level +3 1:100 MF105-28A 582_CCN3_2B_28A_D_MF105_04
08 01 01 011 28A Plan Instalation disposition Dispozicija instalacije Level +4 1:100 MF106-28A 582_CCN3_2B_28A_D_MF106_03
08 01 01 012 28A Plan Instalation disposition Dispozicija instalacije Level +5 1:100 MF107-28A 582_CCN3_2B_28A_D_MF107_03
08 01 01 013 28A Scheme Flow scheme Šema delovanja MF401-28A 582_CCN3_2B_28A_D_MF401_03
08 01 01 014 28A Scheme Isometric scheme Izometrijska šema Level -1 MF402-28A 582_CCN3_2B_28A_D_MF402_02
08 01 01 015 28A Scheme Isometric scheme Izometrijska šema Level ±0 MF403-28A 582_CCN3_2B_28A_D_MF403_02
08 01 01 016 28A Scheme Isometric scheme Izometrijska šema Level +1 MF404-28A 582_CCN3_2B_28A_D_MF404_02
Document
Volume Book Section Prog. Blg. Type English Description Serbian Description Level Scale File Name
Name
08 01 01 017 28A Scheme Isometric scheme Izometrijska šema Level +2 MF405-28A 582_CCN3_2B_28A_D_MF405_02
08 01 01 018 28A Scheme Isometric scheme Izometrijska šema Level +3 MF406-28A 582_CCN3_2B_28A_D_MF406_02
08 01 01 019 28A Scheme Isometric scheme Izometrijska šema Level +4 MF407-28A 582_CCN3_2B_28A_D_MF407_02
08 01 01 020 28A Scheme Isometric scheme Izometrijska šema Level +5 MF408-28A 582_CCN3_2B_28A_D_MF408_02
08 01 01 021 28A Section Section Presek 1:100 MF201-28A 582_CCN3_2B_28A_D_MF201_02
08 01 01 022 28A Section Synchronized sections of all installations in false ceiling Sinhronizovani presek svih instalacija u spuštenom plafonu MF202-28A 582_CCN3_2B_28A_D_MF202_00
08 01 01 023 28A Layout Details Detalji MF502-28A 582_CCN3_2B_28A_D_MF502_01
SPRINKLER INSTALLATIONS - BUILDING T1
MF - SPRINKLER REPORTS
08 03 01 001 T1 Report Technical report of sprinkler installation Tehnički opis sprinkler instalacije - MF001-T1 582_CCN3_2B_T1_R_MF001_00
08 03 01 002 T1 Report Sprinkler calculations Sprinkler proračuni - MF002-T1 582_CCN3_2B_T1_R_MF002_00
08 03 01 003 T1 Report Bill of quantity Predmer i predračun - MF003-T1 582_CCN3_2B_T1_R_MF003_00
08 03 01 004 T1 Report Technical specification Tehnička specifikacija - MF004-T1 582_CCN3_2B_T1_R_MF004_00
MF - SPRINKLER DRAWINGS
08 03 01 006 T1 Layout Pump station disposition Dispozicija opreme u pumpnoj stanici 1:25 MF501-T1 582_CCN3_2B_T1_D_MF501_02
DOCUMENT LIST
STAGE III: Design and Tender documents
Phase 2: Detailed Design and Tender Documents
Step B : Final Detailed Design
CLINICAL CENTER OF NIŠ - CCN
Niš
Document
Volume Book Section Prog. Blg. Type English Description Serbian Description Level Scale File Name
Name
IG541 INSTALLATIONS - BUILDING 27
MF - IG541 REPORTS
08 05 01 020 27 Report Technical report of IG541 installation Tehnički opis sistema gašenja požara gasom - MF020-27 582_CCN3_2B_27_R_MF020_02
08 05 01 021 27 Report IG 541 calculations Proračun sistema gašenja požara gasom - MF021-27 582_CCN3_2B_27_R_MF021_02
08 05 01 022 27 Report Bill of quantity Predmer i predračun - MF022-27 582_CCN3_2B_27_R_MF022_02
08 05 01 023 27 Report Technical specification Tehnička specifikacija - MF023-27 582_CCN3_2B_27_R_MF023_02
MF - IG541 DRAWINGS
08 01 01 024 27 Plan Site plan Situacioni plan 1:500 MF100-27 582_CCN3_2B_27_D_MF100_01
08 05 01 025 27 Plan Instalation disposition Dispozicija instalacije Level -1 1:100 MF105-27 582_CCN3_2B_27_D_MF105_02
08 05 01 026 27 Plan Instalation disposition Dispozicija instalacije Level ±0 1:100 MF106A-27 582_CCN3_2B_27_D_MF106A_02
08 05 01 027 27 Plan Instalation disposition Dispozicija instalacije Level ±0 1:100 MF106B-27 582_CCN3_2B_27_D_MF106B_02
08 05 01 028 27 Plan Instalation disposition Dispozicija instalacije Level +1 1:100 MF107-27 582_CCN3_2B_27_D_MF107_01
08 05 01 029 27 Plan Instalation disposition Dispozicija instalacije Level +2 1:100 MF108-27 582_CCN3_2B_27_D_MF108_01
08 05 01 030 27 Scheme IG 541 connection scheme Šema veze inergen sistema - MF406-27 582_CCN3_2B_27_D_MF406_02
08 05 01 031 27 Scheme Isometric scheme Izometrijska šema - MF407-27 582_CCN3_2B_27_D_MF407_00
08 05 01 032 27 Scheme Isometric scheme Izometrijska šema - MF408-27 582_CCN3_2B_27_D_MF408_00
08 05 01 033 27 Scheme Isometric scheme Izometrijska šema - MF409-27 582_CCN3_2B_27_D_MF409_00
08 05 01 034 27 Scheme Isometric scheme Izometrijska šema - MF410-27 582_CCN3_2B_27_D_MF410_00
08 05 01 035 27 Scheme Isometric scheme Izometrijska šema - MF411-27 582_CCN3_2B_27_D_MF411_00
08 05 01 036 27 Scheme Isometric scheme Izometrijska šema - MF412-27 582_CCN3_2B_27_D_MF412_00
08 05 01 037 27 Scheme Isometric scheme Izometrijska šema - MF413-27 582_CCN3_2B_27_D_MF413_00
08 05 01 038 27 Scheme Isometric scheme Izometrijska šema - MF414-27 582_CCN3_2B_27_D_MF414_00
08 05 01 039 27 Scheme Isometric scheme Izometrijska šema - MF415-27 582_CCN3_2B_27_D_MF415_00
08 05 01 040 27 Scheme Isometric scheme Izometrijska šema - MF416-27 582_CCN3_2B_27_D_MF416_00
08 05 01 041 27 Scheme Isometric scheme Izometrijska šema - MF417-27 582_CCN3_2B_27_D_MF417_00
08 05 01 042 27 Scheme Functional scheme Funkcionalna šema - MF418-27 582_CCN3_2B_27_D_MF418_00
08 05 01 043 27 Scheme Functional scheme Funkcionalna šema - MF419-27 582_CCN3_2B_27_D_MF419_00
08 05 01 044 27 Scheme Functional scheme Funkcionalna šema - MF420-27 582_CCN3_2B_27_D_MF420_00
08 05 01 045 27 Scheme Functional scheme Funkcionalna šema - MF421-27 582_CCN3_2B_27_D_MF421_00
08 05 01 046 27 Scheme Functional scheme Funkcionalna šema - MF422-27 582_CCN3_2B_27_D_MF422_00
08 05 01 047 27 Scheme Functional scheme Funkcionalna šema - MF423-27 582_CCN3_2B_27_D_MF423_00
08 05 01 048 27 Scheme Functional scheme Funkcionalna šema - MF424-27 582_CCN3_2B_27_D_MF424_00
08 05 01 049 27 Scheme Functional scheme Funkcionalna šema - MF425-27 582_CCN3_2B_27_D_MF425_00
08 05 01 050 27 Scheme Functional scheme Funkcionalna šema - MF426-27 582_CCN3_2B_27_D_MF426_00
08 05 01 051 27 Scheme Functional scheme Funkcionalna šema - MF427-27 582_CCN3_2B_27_D_MF427_00
08 05 01 052 27 Scheme Functional scheme Funkcionalna šema - MF428-27 582_CCN3_2B_27_D_MF428_00
Document
Volume Book Section Prog. Blg. Type English Description Serbian Description Level Scale File Name
Name
IG541 INSTALLATIONS - BUILDING 28A
MF - IG541 REPORTS
08 04 01 024 28A Report Technical report of IG541 installation Tehnički opis sistema gašenja požara gasom - MF024-28A 582_CCN3_2B_28A_R_MF024_01
08 04 01 025 28A Report IG 541 calculations Proračun sistema gašenja požara gasom - MF025-28A 582_CCN3_2B_28A_R_MF025_01
08 04 01 026 28A Report Bill of quantity Predmer i predračun - MF026-28A 582_CCN3_2B_28A_R_MF026_01
08 04 01 027 28A Report Technical specification Tehnička specifikacija - MF027-28A 582_CCN3_2B_28A_R_MF027_01
MF - IG541 DRAWINGS
08 01 01 028 28A Plan Site plan Situacioni plan 1:500 MF100-28A 582_CCN3_2B_28A_D_MF100_01
08 04 01 029 28A Plan Instalation disposition Dispozicija instalacije Level -1 1:100 MF108-28A 582_CCN3_2B_28A_D_MF108_01
08 04 01 030 28A Plan Instalation disposition Dispozicija instalacije Level ±0 1:100 MF109-28A 582_CCN3_2B_28A_D_MF109_01
08 04 01 031 28A Plan Instalation disposition Dispozicija instalacije Level +1 1:100 MF110-28A 582_CCN3_2B_28A_D_MF110_01
08 04 01 032 28A Plan Instalation disposition Dispozicija instalacije Level +2 1:100 MF111-28A 582_CCN3_2B_28A_D_MF111_01
08 04 01 033 28A Plan Instalation disposition Dispozicija instalacije Level +3 1:100 MF112-28A 582_CCN3_2B_28A_D_MF112_01
08 04 01 034 28A Plan Instalation disposition Dispozicija instalacije Level +4 1:100 MF113-28A 582_CCN3_2B_28A_D_MF113_01
08 04 01 035 28A Plan Instalation disposition Dispozicija instalacije Level +5 1:100 MF114-28A 582_CCN3_2B_28A_D_MF114_01
08 04 01 036 28A Plan Instalation disposition Dispozicija instalacije Technical floor 1:100 MF115-28A 582_CCN3_2B_28A_D_MF115_01
08 04 01 037 28A Scheme IG 541 connections scheme Šema veze inergen sistema - MF409-28A 582_CCN3_2B_28A_D_MF409_01
08 04 01 038 28A Scheme Isometric scheme Izometrijska šema - MF410-28A 582_CCN3_2B_28A_D_MF410_00
08 04 01 039 28A Scheme Isometric scheme Izometrijska šema - MF411-28A 582_CCN3_2B_28A_D_MF411_00
08 04 01 040 28A Scheme Isometric scheme Izometrijska šema - MF412-28A 582_CCN3_2B_28A_D_MF412_00
08 04 01 041 28A Scheme Isometric scheme Izometrijska šema - MF413-28A 582_CCN3_2B_28A_D_MF413_00
08 04 01 042 28A Scheme Isometric scheme Izometrijska šema - MF414-28A 582_CCN3_2B_28A_D_MF414_00
08 04 01 043 28A Scheme Isometric scheme Izometrijska šema - MF415-28A 582_CCN3_2B_28A_D_MF415_00
08 04 01 044 28A Scheme Isometric scheme Izometrijska šema - MF416-28A 582_CCN3_2B_28A_D_MF416_00
08 04 01 045 28A Scheme Isometric scheme Izometrijska šema - MF417-28A 582_CCN3_2B_28A_D_MF417_00
08 04 01 046 28A Scheme Isometric scheme Izometrijska šema - MF418-28A 582_CCN3_2B_28A_D_MF418_00
08 04 01 047 28A Scheme Isometric scheme Izometrijska šema - MF419-28A 582_CCN3_2B_28A_D_MF419_00
08 04 01 048 28A Scheme Isometric scheme Izometrijska šema - MF420-28A 582_CCN3_2B_28A_D_MF420_00
DOCUMENT LIST
STAGE III: Design and Tender documents
Phase 2: Detailed Design and Tender Documents
Step B : Final Detailed Design
CLINICAL CENTER OF NIS - CCN
Nis

Document
Volume Book Section Prog. Blg. Type English Description Serbian Description Scale File Name
Name

9 LIFTS - BUILDING 27
9 LL - ELEVATORS GENERAL REPORTS
9 01 001 27 Report Technical report - L10 Tehnički opis - L10 LL001-27 582_CCN3_2B_27_R_LL001_01
9 01 002 27 Report Static calculation - L10 Statički proračun - L10 LL002-27 582_CCN3_2B_27_R_LL002_01
9 01 003 27 Report Lift electrical schemes - L10 Elektro šeme lifta - L10 LL003-27 582_CCN3_2B_27_R_LL003_01
9 01 004 27 Report Bill of quantities - L10 Predračun - L10 LL004-27 582_CCN3_2B_27_R_LL004_01
9 02 008 27 Report Technical report - L11 Tehnički opis - L11 LL005-27 582_CCN3_2B_27_R_LL005_01
9 02 009 27 Report Static calculation - L11 Statički proračun - L11 LL006-27 582_CCN3_2B_27_R_LL006_01
9 02 010 27 Report Lift electrical schemes - L11 Elektro šeme lifta - L11 LL007-27 582_CCN3_2B_27_R_LL007_01
9 02 011 27 Report Bill of quantities - L11 Predračun - L11 LL008-27 582_CCN3_2B_27_R_LL008_01
9 03 015 27 Report Technical report - L12 Tehnički opis - L12 LL009-27 582_CCN3_2B_27_R_LL009_01
9 03 016 27 Report Static calculation - L12 Statički proračun - L12 LL010-27 582_CCN3_2B_27_R_LL010_01
9 03 017 27 Report Lift electrical schemes - L12 Elektro šeme lifta - L12 LL011-27 582_CCN3_2B_27_R_LL011_01
9 03 018 27 Report Bill of quantities - L12 Predračun - L12 LL012-27 582_CCN3_2B_27_R_LL012_01
9 04 022 27 Report Technical report - L13 Tehnički opis - L13 LL013-27 582_CCN3_2B_27_R_LL013_01
9 04 023 27 Report Static calculation - L13 Statički proračun - L13 LL014-27 582_CCN3_2B_27_R_LL014_01
9 04 024 27 Report Lift electrical schemes - L13 Elektro šeme lifta - L13 LL015-27 582_CCN3_2B_27_R_LL015_01
9 04 025 27 Report Bill of quantities - L13 Predračun - L13 LL016-27 582_CCN3_2B_27_R_LL016_01
9 05 031 27 Report Technical report - L14 Tehnički opis - L14 LL017-27 582_CCN3_2B_27_R_LL017_01
9 05 032 27 Report Static calculation - L14 Statički proračun - L14 LL018-27 582_CCN3_2B_27_R_LL018_01
9 05 033 27 Report Lift electrical schemes - L14 Elektro šeme lifta - L14 LL019-27 582_CCN3_2B_27_R_LL019_01
9 05 034 27 Report Bill of quantities - L14 Predračun - L14 LL020-27 582_CCN3_2B_27_R_LL020_01
9 06 040 27 Report Technical report - L15 Tehnički opis - L15 LL021-27 582_CCN3_2B_27_R_LL021_01
9 06 041 27 Report Static calculation - L15 Statički proračun - L15 LL022-27 582_CCN3_2B_27_R_LL022_01
9 06 042 27 Report Lift electrical schemes - L15 Elektro šeme lifta - L15 LL023-27 582_CCN3_2B_27_R_LL023_01
9 06 043 27 Report Bill of quantities - L15 Predračun - L15 LL024-27 582_CCN3_2B_27_R_LL024_01
9 07 049 27 Report Technical report - L16 Tehnički opis - L16 LL025-27 582_CCN3_2B_27_R_LL025_01
Document
Volume Book Section Prog. Blg. Type English Description Serbian Description Scale File Name
Name
9 07 050 27 Report Static calculation - L16 Statički proračun - L16 LL026-27 582_CCN3_2B_27_R_LL026_01
9 07 051 27 Report Lift electrical schemes - L16 Elektro šeme lifta - L16 LL027-27 582_CCN3_2B_27_R_LL027_01
9 07 052 27 Report Bill of quantities - L16 Predračun - L16 LL028-27 582_CCN3_2B_27_R_LL028_01
9 LP - ELEVATORS DESIGN DRAWINGS
9 01 005 27 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-27 582_CCN3_2B_27_D_LP100_00
9 01 006 27 Drawing Lift plan - Lifts L10 Dispozicija lifta - Liftovi L10 Various LP110A-27 582_CCN3_2B_27_D_LP110A_01
9 01 007 27 Drawing Lift plan - Lifts L10 Dispozicija lifta - Liftovi L10 Various LP110B-27 582_CCN3_2B_27_D_LP110B_01
9 02 012 27 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-27 582_CCN3_2B_27_D_LP100_00
9 02 013 27 Drawing Lift plan - Lifts L11 Dispozicija lifta - Liftovi L11 Various LP111A-27 582_CCN3_2B_27_D_LP111A_01
9 02 014 27 Drawing Lift plan - Lifts L11 Dispozicija lifta - Liftovi L11 Various LP111B-27 582_CCN3_2B_27_D_LP111B_01
9 03 019 27 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-27 582_CCN3_2B_27_D_LP100_00
9 03 020 27 Drawing Lift plan - Lifts L12 Dispozicija lifta - Liftovi L12 Various LP112A-27 582_CCN3_2B_27_D_LP112A_01
9 03 021 27 Drawing Lift plan - Lifts L12 Dispozicija lifta - Liftovi L12 Various LP112B-27 582_CCN3_2B_27_D_LP112B_01
9 04 026 27 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-27 582_CCN3_2B_27_D_LP100_00
9 04 027 27 Drawing Lift plan - Lifts L13 Dispozicija lifta - Liftovi L13 Various LP113A-27 582_CCN3_2B_27_D_LP113A_01
9 04 028 27 Drawing Lift plan - Lifts L13 Dispozicija lifta - Liftovi L13 Various LP113B-27 582_CCN3_2B_27_D_LP113B_01
9 04 029 27 Drawing Lift plan - Lifts L13 Dispozicija lifta - Liftovi L13 Various LP113C-27 582_CCN3_2B_27_D_LP113C_01
9 04 030 27 Drawing Lift plan - Lifts L13 Dispozicija lifta - Liftovi L13 Various LP113D-27 582_CCN3_2B_27_D_LP113D_01
9 05 035 27 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-27 582_CCN3_2B_27_D_LP100_00
9 05 036 27 Drawing Lift plan - Lifts L14 Dispozicija lifta - Liftovi L14 Various LP114A-27 582_CCN3_2B_27_D_LP114A_01
9 05 037 27 Drawing Lift plan - Lifts L14 Dispozicija lifta - Liftovi L14 Various LP114B-27 582_CCN3_2B_27_D_LP114B_01
9 05 038 27 Drawing Lift plan - Lifts L14 Dispozicija lifta - Liftovi L14 Various LP114C-27 582_CCN3_2B_27_D_LP114C_01
9 05 039 27 Drawing Lift plan - Lifts L14 Dispozicija lifta - Liftovi L14 Various LP114D-27 582_CCN3_2B_27_D_LP114D_01
9 06 044 27 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-27 582_CCN3_2B_27_D_LP100_00
9 06 045 27 Drawing Lift plan - Lifts L15 Dispozicija lifta - Liftovi L15 Various LP115A-27 582_CCN3_2B_27_D_LP115A_01
9 06 046 27 Drawing Lift plan - Lifts L15 Dispozicija lifta - Liftovi L15 Various LP115B-27 582_CCN3_2B_27_D_LP115B_01
9 06 047 27 Drawing Lift plan - Lifts L15 Dispozicija lifta - Liftovi L15 Various LP115C-27 582_CCN3_2B_27_D_LP115C_01
9 06 048 27 Drawing Lift plan - Lifts L15 Dispozicija lifta - Liftovi L15 Various LP115D-27 582_CCN3_2B_27_D_LP115D_01
9 07 053 27 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-27 582_CCN3_2B_27_D_LP100_00
9 07 054 27 Drawing Lift plan - Lifts L16 Dispozicija lifta - Liftovi L16 Various LP116A-27 582_CCN3_2B_27_D_LP116A_01
9 07 055 27 Drawing Lift plan - Lifts L16 Dispozicija lifta - Liftovi L16 Various LP116B-27 582_CCN3_2B_27_D_LP116B_01
9 07 056 27 Drawing Lift plan - Lifts L16 Dispozicija lifta - Liftovi L16 Various LP116C-27 582_CCN3_2B_27_D_LP116C_01
9 07 057 27 Drawing Lift plan - Lifts L16 Dispozicija lifta - Liftovi L16 Various LP116D-27 582_CCN3_2B_27_D_LP116D_01
Document
Volume Book Section Prog. Blg. Type English Description Serbian Description Scale File Name
Name

9 LIFTS - BUILDING 28A


9 LL - ELEVATORS GENERAL REPORTS
9 01 001 28A Report Technical report - L1 Tehnički opis - L1 LL001-28A 582_CCN3_2B_28A_R_LL001_02
9 01 002 28A Report Static calculation - L1 Statički proračun - L1 LL002-28A 582_CCN3_2B_28A_R_LL002_02
9 01 003 28A Report Lift electrical schemes - L1 Elektro šeme lifta - L1 LL003-28A 582_CCN3_2B_28A_R_LL003_02
9 01 004 28A Report Bill of quantities - L1 Predračun - L1 LL004-28A 582_CCN3_2B_28A_R_LL004_02
9 02 008 28A Report Technical report - L2 Tehnički opis - L2 LL005-28A 582_CCN3_2B_28A_R_LL005_02
9 02 009 28A Report Static calculation - L2 Statički proračun - L2 LL006-28A 582_CCN3_2B_28A_R_LL006_02
9 02 010 28A Report Lift electrical schemes - L2 Elektro šeme lifta - L2 LL007-28A 582_CCN3_2B_28A_R_LL007_02
9 02 011 28A Report Bill of quantities - L2 Predračun - L2 LL008-28A 582_CCN3_2B_28A_R_LL008_02
9 03 015 28A Report Technical report - L3 Tehnički opis - L3 LL009-28A 582_CCN3_2B_28A_R_LL009_02
9 03 016 28A Report Static calculation - L3 Statički proračun - L3 LL010-28A 582_CCN3_2B_28A_R_LL010_02
9 03 017 28A Report Lift electrical schemes - L3 Elektro šeme lifta - L3 LL011-28A 582_CCN3_2B_28A_R_LL011_02
9 03 018 28A Report Bill of quantities - L3 Predračun - L3 LL012-28A 582_CCN3_2B_28A_R_LL012_02
9 04 022 28A Report Technical report - L4 Tehnički opis - L4 LL013-28A 582_CCN3_2B_28A_R_LL013_01
9 04 023 28A Report Static calculation - L4 Statički proračun - L4 LL014-28A 582_CCN3_2B_28A_R_LL014_01
9 04 024 28A Report Lift electrical schemes - L4 Elektro šeme lifta - L4 LL015-28A 582_CCN3_2B_28A_R_LL015_01
9 04 025 28A Report Bill of quantities - L4 Predračun - L4 LL016-28A 582_CCN3_2B_28A_R_LL016_01
9 05 029 28A Report Technical report - L5 Tehnički opis - L5 LL017-28A 582_CCN3_2B_28A_R_LL017_01
9 05 030 28A Report Static calculation - L5 Statički proračun - L5 LL018-28A 582_CCN3_2B_28A_R_LL018_01
9 05 031 28A Report Lift electrical schemes - L5 Elektro šeme lifta - L5 LL019-28A 582_CCN3_2B_28A_R_LL019_01
9 05 032 28A Report Bill of quantities - L5 Predračun - L5 LL020-28A 582_CCN3_2B_28A_R_LL020_01
9 06 036 28A Report Technical report - L6 Tehnički opis - L6 LL021-28A 582_CCN3_2B_28A_R_LL021_01
9 06 037 28A Report Static calculation - L6 Statički proračun - L6 LL022-28A 582_CCN3_2B_28A_R_LL022_01
9 06 038 28A Report Lift electrical schemes - L6 Elektro šeme lifta - L6 LL023-28A 582_CCN3_2B_28A_R_LL023_01
9 06 039 28A Report Bill of quantities - L6 Predračun - L6 LL024-28A 582_CCN3_2B_28A_R_LL024_01
9 07 043 28A Report Technical report - L7 Tehnički opis - L7 LL025-28A 582_CCN3_2B_28A_R_LL025_01
9 07 044 28A Report Static calculation - L7 Statički proračun - L7 LL026-28A 582_CCN3_2B_28A_R_LL026_01
9 07 045 28A Report Lift electrical schemes - L7 Elektro šeme lifta - L7 LL027-28A 582_CCN3_2B_28A_R_LL027_01
9 07 046 28A Report Bill of quantities - L7 Predračun - L7 LL028-28A 582_CCN3_2B_28A_R_LL028_01
9 08 050 28A Report Technical report - L8 Tehnički opis - L8 LL029-28A 582_CCN3_2B_28A_R_LL029_01
9 08 051 28A Report Static calculation - L8 Statički proračun - L8 LL030-28A 582_CCN3_2B_28A_R_LL030_01
9 08 052 28A Report Lift electrical schemes - L8 Elektro šeme lifta - L8 LL031-28A 582_CCN3_2B_28A_R_LL031_01
9 08 053 28A Report Bill of quantities - L8 Predračun - L8 LL032-28A 582_CCN3_2B_28A_R_LL032_01
9 09 057 28A Report Technical report - L9 Tehnički opis - L9 LL033-28A 582_CCN3_2B_28A_R_LL033_01
9 09 058 28A Report Static calculation - L9 Statički proračun - L9 LL034-28A 582_CCN3_2B_28A_R_LL034_01
Document
Volume Book Section Prog. Blg. Type English Description Serbian Description Scale File Name
Name
9 09 059 28A Report Lift electrical schemes - L9 Elektro šeme lifta - L9 LL035-28A 582_CCN3_2B_28A_R_LL035_01
9 09 060 28A Report Bill of quantities - L9 Predračun - L9 LL036-28A 582_CCN3_2B_28A_R_LL036_01
9 LP - ELEVATORS DESIGN DRAWINGS
9 01 005 13 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-28A 582_CCN3_2B_28A_D_LP100_01
9 01 006 13 Drawing Lift plan - Lifts L1 Dispozicija lifta - Liftovi L1 Various LP101A-28A 582_CCN3_2B_28A_D_LP101A_02
9 01 007 13 Drawing Lift plan - Lifts L1 Dispozicija lifta - Liftovi L1 Various LP101B-28A 582_CCN3_2B_28A_D_LP101B_02
9 02 012 13 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-28A 582_CCN3_2B_28A_D_LP100_01
9 02 013 13 Drawing Lift plan - Lifts L2 Dispozicija lifta - Liftovi L2 Various LP102A-28A 582_CCN3_2B_28A_D_LP102A_02
9 02 014 13 Drawing Lift plan - Lifts L2 Dispozicija lifta - Liftovi L2 Various LP102B-28A 582_CCN3_2B_28A_D_LP102B_02
9 03 019 13 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-28A 582_CCN3_2B_28A_D_LP100_01
9 03 020 13 Drawing Lift plan - Lifts L3 Dispozicija lifta - Liftovi L3 Various LP103A-28A 582_CCN3_2B_28A_D_LP103A_02
9 03 021 13 Drawing Lift plan - Lifts L3 Dispozicija lifta - Liftovi L3 Various LP103B-28A 582_CCN3_2B_28A_D_LP103B_02
9 04 026 13 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-28A 582_CCN3_2B_28A_D_LP100_01
9 04 027 13 Drawing Lift plan - Lifts L4 Dispozicija lifta - Liftovi L4 Various LP104A-28A 582_CCN3_2B_28A_D_LP104A_01
9 04 028 13 Drawing Lift plan - Lifts L4 Dispozicija lifta - Liftovi L4 Various LP104B-28A 582_CCN3_2B_28A_D_LP104B_01
9 05 033 13 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-28A 582_CCN3_2B_28A_D_LP100_01
9 05 034 13 Drawing Lift plan - Lifts L5 Dispozicija lifta - Liftovi L5 Various LP105A-28A 582_CCN3_2B_28A_D_LP105A_01
9 05 035 13 Drawing Lift plan - Lifts L5 Dispozicija lifta - Liftovi L5 Various LP105B-28A 582_CCN3_2B_28A_D_LP105B_01
9 06 040 13 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-28A 582_CCN3_2B_28A_D_LP100_01
9 06 041 13 Drawing Lift plan - Lifts L6 Dispozicija lifta - Liftovi L6 Various LP106A-28A 582_CCN3_2B_28A_D_LP106A_01
9 06 042 13 Drawing Lift plan - Lifts L6 Dispozicija lifta - Liftovi L6 Various LP106B-28A 582_CCN3_2B_28A_D_LP106B_01
9 07 047 13 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-28A 582_CCN3_2B_28A_D_LP100_01
9 07 048 13 Drawing Lift plan - Lifts L7 Dispozicija lifta - Liftovi L7 Various LP107A-28A 582_CCN3_2B_28A_D_LP107A_01
9 07 049 13 Drawing Lift plan - Lifts L7 Dispozicija lifta - Liftovi L7 Various LP107B-28A 582_CCN3_2B_28A_D_LP107B_01
9 08 054 13 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-28A 582_CCN3_2B_28A_D_LP100_01
9 08 055 13 Drawing Lift plan - Lifts L8 Dispozicija lifta - Liftovi L8 Various LP108A-28A 582_CCN3_2B_28A_D_LP108A_01
9 08 056 13 Drawing Lift plan - Lifts L8 Dispozicija lifta - Liftovi L8 Various LP108B-28A 582_CCN3_2B_28A_D_LP108B_01
9 09 061 13 Drawing Situation of lifts in building Situacija liftova u objektu Various LP100-28A 582_CCN3_2B_28A_D_LP100_01
9 09 062 13 Drawing Lift plan - Lifts L9 Dispozicija lifta - Liftovi L9 Various LP109A-28A 582_CCN3_2B_28A_D_LP109A_01
9 09 063 13 Drawing Lift plan - Lifts L9 Dispozicija lifta - Liftovi L9 Various LP109B-28A 582_CCN3_2B_28A_D_LP109B_01
DOCUMENT LIST
STAGE III: Design and Tender documents
Phase 2: Detailed Design and Tender Documents
Step B : Final Detailed Design
CLINICAL CENTER OF NIŠ - CCN
Niš

Date of Document
Volume Book Section Prog. Blg. Type English Description Level Serbian Description Scale File Name
submmision Name

11 FIRE PREVENTION
11 BUILDING 27
11 00_FP - GENERAL DRAWINGS AND REPORTS
09.06.2014. 11 Building 27 Report Technical report - Tehnički opis - FP001-27 582_CCN3_2B_27_R_FP001_05
11 10_FP - FIRE PREVENTION
09.06.2014. 11 Building 27 Plan Building 27 Site plan Zgrada 27 - Situacija 1:100 FP_SP-27 582_CCN3_2B_27_D_FP_SP_05
09.06.2014. 11 Building 27 Plan Building 27 Level -1 Zgrada 27 - Nivo -1 1:200 FP101-27 582_CCN3_2B_27_D_FP101_05
09.06.2014. 11 Building 27 Plan Building 27 Level ±0 Zgrada 27 - Nivo 0 1:200 FP102-27 582_CCN3_2B_27_D_FP102_05
09.06.2014. 11 Building 27 Plan Building 27 Level +1 Zgrada 27 - Nivo +1 1:200 FP103-27 582_CCN3_2B_27_D_FP103_05
09.06.2014. 11 Building 27 Plan Building 27 Level +2 Zgrada 27 - Nivo +2 1:200 FP104-27 582_CCN3_2B_27_D_FP104_05
09.06.2014. 11 Building 27 Plan Building 27 Technical level Zgrada 27 - Tehnički nivo 1:200 FP105-27 582_CCN3_2B_27_D_FP105_05
09.06.2014. 11 Building 27 Section Building 27 Section A-A Zgrada 27 - Presek A-A 1:100 FP201-27 582_CCN3_2B_27_D_FP201_05
09.06.2014. 11 Building 27 Section Building 27 Section B-B Zgrada 27 - Presek B-B 1:100 FP202-27 582_CCN3_2B_27_D_FP202_05
11 Building 27 Diagram Vertical diagram of Fire detection system and extinguishing system All levels Šema vertikalnog razvoda instalacije automatske dojave požara i gašenja požara 1:100 FP300-27 582_CCN3_2B_27_D_FP300_05
09.06.2014.
11 Building 27 Diagram Vertical diagram of Fire detection system and extinguishing system Level -1, Level ±0 Šema vertikalnog razvoda instalacije automatske dojave požara i gašenja - Nivo -1, 1:100 FP301-27 582_CCN3_2B_27_D_FP301_05
09.06.2014. Nivo 0
11 Building 27 Diagram Vertical diagram of Fire detection system and extinguishing system Level +1, Level +2, Technical level Šema vertikalnog razvoda instalacije automatske dojave požara i gašenja - Nivo +1, 1:100 FP302-27 582_CCN3_2B_27_D_FP302_05
09.06.2014. Nivo +2, Tehnički nivo
09.06.2014. 11 Building 27 Plan Earthing and lightning protection Foundations Uzemljenje i gromobrani - Temelji 1:100 FP303-27 582_CCN3_2B_27_D_FP303_05
09.06.2014. 11 Building 27 Plan Earthing and lightning protection Roof level Uzemljenje i gromobrani - Krov 1:100 FP304-27 582_CCN3_2B_27_D_FP304_05
09.06.2014. 11 Building 27 Plan Abacus walls Osnova Detalji zidova 1:100 FP400-27 582_CCN3_2B_27_D_FP400_05
09.06.2014. 11 Building 27 Plan Abacus walls Osnova Detalji zidova 1:100 FP401-27 582_CCN3_2B_27_D_FP401_05
11 BUILDING 28A
11 00_FP - GENERAL DRAWINGS AND REPORTS
09.06.2014. 11 Building 28A Report Technical report - Tehnički opis - FP001-28A 582_CCN3_2B_28A_R_FP001_05

11 10_FP - FIRE PREVENTION


09.06.2014. 11 Building 28A Plan Building 28A Site plan Zgrada 28A -Situacija 1:100 FP_SP-28A 582_CCN3_2B_28A_D_FP_SP_05
09.06.2014. 11 Building 28A Plan Building 28A Level -1 Zgrada 28A - Nivo -1 1:200 FP101-28A 582_CCN3_2B_28A_D_FP101_05
09.06.2014. 11 Building 28A Plan Building 28A Level ±0 Zgrada 28A - Nivo 0 1:200 FP102-28A 582_CCN3_2B_28A_D_FP102_05
09.06.2014. 11 Building 28A Plan Building 28A Level +1 Zgrada 28A - Nivo +1 1:200 FP103-28A 582_CCN3_2B_28A_D_FP103_05
09.06.2014. 11 Building 28A Plan Building 28A Level +2 Zgrada 28A - Nivo +2 1:200 FP104-28A 582_CCN3_2B_28A_D_FP104_05
09.06.2014. 11 Building 28A Plan Building 28A Level +3 Zgrada 28A - Nivo +3 1:200 FP105-28A 582_CCN3_2B_28A_D_FP105_05
09.06.2014. 11 Building 28A Plan Building 28A Level +4 Zgrada 28A - Nivo +4 1:200 FP106-28A 582_CCN3_2B_28A_D_FP106_05
09.06.2014. 11 Building 28A Plan Building 28A Level +5 Zgrada 28A - Nivo +5 1:200 FP107-28A 582_CCN3_2B_28A_D_FP107_05
09.06.2014. 11 Building 28A Plan Building 28A Level +6 Zgrada 28A - Nivo +6 1:200 FP108-28A 582_CCN3_2B_28A_D_FP108_05
09.06.2014. 11 Building 28A Plan Building 28A Roof level Zgrada 28A - Osnova krova 1:200 FP109-28A 582_CCN3_2B_28A_D_FP109_05
09.06.2014. 11 Building 28A Section Building 28A Section G-G Zgrada 28A - Presek G-G 1:100 FP201-28A 582_CCN3_2B_28A_D_FP201_05
09.06.2014. 11 Building 28A Section Building 28A Section H-H Zgrada 28A - Presek H-H 1:100 FP202-28A 582_CCN3_2B_28A_D_FP202_05
09.06.2014. 11 Building 28A Diagram Vertical diagram of Fire detection system and extinguishing system All levels Šema vertikalnog razvoda instalacije automatske dojave požara i gašenja - 1:100 FP301-28A 582_CCN3_2B_28A_D_FP301_05
09.06.2014. 11 Building 28A Plan Earthing and lightning protection Foundations Uzemljenje i gromobrani - Temelji 1:100 FP302-28A 582_CCN3_2B_28A_D_FP302_05
09.06.2014. 11 Building 28A Plan Earthing and lightning protection Roof level Uzemljenje i gromobrani - Krov 1:100 FP303-28A 582_CCN3_2B_28A_D_FP303_05
09.06.2014. 11 Building 28A Plan Diagram of fire detection system and extinguishing system Levels -1 and 0 Šema razvoda instalacije automatske dojave požara i gašenja - Nivoi -1 i 0 1:100 FP304-28A 582_CCN3_2B_28A_D_FP304_05
09.06.2014. 11 Building 28A Plan Diagram of fire detection system and extinguishing system Level +1 Šema razvoda instalacije automatske dojave požara i gašenja - Nivo +1 1:100 FP305-28A 582_CCN3_2B_28A_D_FP305_05
09.06.2014. 11 Building 28A Plan Diagram of fire detection system and extinguishing system Levels +2 i +3 Šema razvoda instalacije automatske dojave požara i gašenja - Nivo +2 i +3 1:100 FP306-28A 582_CCN3_2B_28A_D_FP306_05
09.06.2014. 11 Building 28A Plan Diagram of fire detection system and extinguishing system Levels +4,+5 and technical level Šema razvoda instalacije automatske dojave požara i gašenja - Nivo +4,+5 i 1:100 FP307-28A 582_CCN3_2B_28A_D_FP307_05
tehnička etaža
09.06.2014. 11 Building 28A Plan Abacus walls Detalji zidova 1:100 FP400-28A 582_CCN3_2B_28A_D_FP400_05
09.06.2014. 11 Building 28A Plan Floor slabs Šeme međuspratnih tavanica 1:100 FP401-28A 582_CCN3_2B_28A_D_FP401_05
11 TECHNICAL BLOCK T1
11 00_FP - GENERAL DRAWINGS AND REPORTS
09.06.2014. 11 Technical block T1 Report Technical report - Tehnički opis - FP001-T1 582_CCN3_2B_T1_R_FP001_03
11 10_FP - FIRE PREVENTION
09.06.2014. 11 Technical block T1 Plan Technical block T1 Site plan Tehnički blok T1 - Situacija 1:100 FP_SP-T1 582_CCN3_2B_T1_D_FP_SP_03
09.06.2014. 11 Technical block T1 Plan Technical block T1 Level ±0 Tehnički blok T1 - Nivo 0 1:100 FP101-T1 582_CCN3_2B_T1_D_FP101_03
09.06.2014. 11 Technical block T1 Plan Technical block T1 Roof level Tehnički blok T1 - Nivo krova 1:100 FP102-T1 582_CCN3_2B_T1_D_FP102_03
09.06.2014. 11 Technical block T1 Section Technical block T1 Section 2-2 Tehnički blok T1 - Presek 2-2 1:50 FP201-T1 582_CCN3_2B_T1_D_FP201_03
09.06.2014. 11 Technical block T1 Section Technical block T1 Section 6-6 Tehnički blok T1 - Presek 6-6 1:50 FP202-T1 582_CCN3_2B_T1_D_FP202_03
09.06.2014. 11 Technical block T1 Diagram Sheme of Fire detection system and extinguishing system All levels Šema razvoda instalacije automatske dojave i gašenja požara 1:50 FP301-T1 582_CCN3_2B_T1_D_FP301_03
09.06.2014. 11 Technical block T1 Plan Earthing and lightning protection Foundations Gromobranska instalacija - Uzemljivač 1:50 FP302-T1 582_CCN3_2B_T1_D_FP302_03
09.06.2014. 11 Technical block T1 Plan Earthing and lightning protection Roof level Gromobranska instalacija - Krov 1:50 FP303-T1 582_CCN3_2B_T1_D_FP303_03

11 TECHNICAL BLOCK T2
11 00_FP - GENERAL DRAWINGS AND REPORTS
09.06.2014. 11 Technical block T2 Report Technical report - Tehnički opis - FP001-T2 582_CCN3_2B_T2_R_FP001_03
11 10_FP - FIRE PREVENTION
09.06.2014. 11 Technical block T2 Plan Technical block T2 Site plan Tehnički blok T2 - Situacija 1:100 FP_SP-T2 582_CCN3_2B_T2_D_FP_SP_03
09.06.2014. 11 Technical block T2 Plan Technical block T2 Level ±0 Tehnički blok T2 - Nivo 0 1:100 FP101-T2 582_CCN3_2B_T2_D_FP101_03
09.06.2014. 11 Technical block T2 Plan Technical block T2 Roof level Tehnički blok T2 - Osnova krova 1:100 FP102-T2 582_CCN3_2B_T2_D_FP102_03
09.06.2014. 11 Technical block T2 Section Technical block T2 Section 1-1 Tehnički blok T2 - Presek 1-1 1:50 FP201-T2 582_CCN3_2B_T2_D_FP201_03
09.06.2014. 11 Technical block T2 Section Technical block T2 Section 2-2 Tehnički blok T2 - Presek 2-2 1:50 FP202-T2 582_CCN3_2B_T2_D_FP202_03
09.06.2014. 11 Technical block T2 Diagram Sheme of Fire detection system and extinguishing system All levels Šema razvoda instalacije automatske dojave i gašenja požara 1:50 FP301-T2 582_CCN3_2B_T2_D_FP301_03
09.06.2014. 11 Technical block T2 Plan Earthing and lightning protection Foundations Gromobranska instalacija - Uzemljivač 1:50 FP302-T2 582_CCN3_2B_T2_D_FP302_03