You are on page 1of 12

PF-2

Cut approval obtain


PPR sample approved by the
Yes least 10 days befo
customer
denim

No

As per P & S plan


In case customer require modifications
vendor site for fabri
,sample forwarded to PD for adjustment
fabric with 10%

Fabric Heade
team for wash
PD Specs shared Bulk Sp

PPR Sample evaluation r


signed by all concerned (s
shrinkage etc)
Cut approval obtained from customer at
least 10 days before fabric arrival to
denim Store

Adju
As per P & S plan, FID auditor visit Fabric Inspection Report No pe
vendor site for fabric inspection (25000
fabric with 10% sample size)

Yes

Fabric Headers shared with Laundry


Fabric Received at Fabric Store and
team for washing, shade, shrinkage
Internal Testing Performed
testing

Internal Testing Report No

Yes

Fabric Inventoried and MRN Prepared


Yes

Fabric Inventoried and MRN Prepared

PPC prepared the Customer wise and


PO wise Cutting plan and shared with
cutting

PPC prepared the Customer wise and


PO wise Cutting plan and shared with
cutting

PD Specs shared Bulk Specs Sheet

PPR Sample evaluation report duly


signed by all concerned (shade wise CAD Section Plan Cutting
shrinkage etc) 1.Bulk specs report
2. FID Report
3. PPR Meeting Report
4.Over cut Report
5.Size and cut detail
2. FID Report
3. PPR Meeting Report
4.Over cut Report
5.Size and cut detail

Fabric Store segregate and share the


shade wise fabric to cutting

Cutting department relax the fabric roll


using relaxing machines as per
requirement of customer

Pattern formed in Gerber software

Fabric spreaded using spreader and


cutting started

Numbering and bundling (PO and order


number) market on cut Panels and
No
presented to QC auditor

QC Auditor approve the


cutting measurements
QC Auditor approve the
cutting measurements

Yes

Bundles are handed over to WIP sewing


for induction into the Sewing Lines

PF-3
Adjustment /Arrangement of fabric as
port No per requirement or cancel order if
requirements not fullfiled

Store and
rmed

Fabric Moved to Non-Confirming area


port No
and informed to concerned buyer

N Prepared
N Prepared

r wise and
hared with

r wise and
hared with

Measurement Trend analysis Report


Duly signed by Tariq shb-Section Head
CAD

Size detail report and Check List

Cutting
eport
rt
Report
port
detail
Overcut Report from PPC-Datatex
rt
Report
port
detail
Overcut Report from PPC-Datatex

and share the


o cutting

x the fabric roll


nes as per
stomer

erber software

g spreader and
rted

g (PO and order


ut Panels and
C auditor

rove the
ements
rove the
ements

er to WIP sewing
Sewing Lines