You are on page 1of 8

ITP FOR REINFORC

No ACTIVITY DESCRIPTION

1 Shop drawings and MEP coordination


drawings

Concrete trial mix with all concrete


2 ingredients (Aggregate, cement,
Admixture, Water etc.,)

3 Materials Submittal

4 Reinforcement Sample Test

5 Water Test

6 Surveying : setting out, levels inspections

7 Inspection of completed rebar work /BRC


Mesh fixing works

8 Inspection of Form work for Concrete


Inspection for Concrete
9 Completion with MEP Clearances

10 Testing of concrete cubes

11 Removal /Striking of form work

12 Concrete Inspection Tolerances

H-HOLD POINT

R&A- REVIEW & APPROVE

W-WITNESS POINT

RW-RANDON WITNESS

NA
ITP FOR REINFORCEMENT ,FORMWORKS & CONCRE

ACCEPTANCE CRITERIA

Drawings stamped and / or signed approved for construction


Frequency: All drawings

As per mix grade specified in Specification & shop drawing


Frequency:- For all concrete grades once trail approval will be
undertaken ,Ingredient Test as per Ready Mix concrete approved
QCP Monthly report will be followed.

Compliance to project technical specifications


-
Frequency: All materials Grade for Concrete requried

MTC from Manufacturer acceptable ,3rd Party Test if required every


One Physical Test for 100Tons can be undertaken

Water Suitability for Construction purpose Once in Year /(Initial


period one should undertaken)

Approved IFC Drawing


-Approved Benchmarks acceptable & ACI code tolerances
Frequency: Every activity involved in concreteing

As per IFC drawing / Approved shop drawing with in ACI Tolerances


Codes

As per IFC drawing / Approved shop drawing with in ACI Tolerances


Codes
As per Approved Mix design

For Every
- 06 no’s for every 50cum cubes should be casted. (03nos for 7days
& 03nos for 28 days strength) ,For Final Results acceptance is mean
of last 4 consecutive Test sample should be atleast 3Mpa morethan
specified Strength ,And any individual mean Strength value should
be not less than specified Strength Minus 3 Mpa

Beam ,wall ,column Side 1 day,soffit of slab 4 days with prop, Beam
soffit 10day with prop,as specificed in MS

As per Spec and Refer ACI code All setting out dimensions, lengths of
beams nd slabs, storey heights +-6 mm
-Cross-sectional dimensions of concrete members ± 6mm
-Surface levels of floor slabs - Generally (in 3 m of length) ± 6mm
-Local undulations ± 3mm
-Plumbs of columns and walls - In a storey height ± 6mm
- In full building height ± 20mm

A stage in the production cycle when inspection and /or test to be performed to determine the acceptability of an i

A Document to be Reviewed by Responsible Authority and Approval or Approved with Comments required to proce

Witness point – A stage in the production cycle when a third party inspector/Consultant, Client representative witn
( Required Inspection Document like RFI,MIR etc)

Randomly Client or Consultant can be checked/Witness the ongoing process to meet the Specs & Procedure Require

Not applicable
RCEMENT ,FORMWORKS & CONCRETE WORKS

REPONSIBILITY
RECORD OF
REFERENCE DOCUMENTS
DOCUMENT
EMD SEM

IFC drawing
IFC drawing / Approved shop
Method statement for Shop drawing drawing s & MEP coordinated NA R&A
procedures
drawing & Transmittal.

Material approval sheet, Technical Trial mix final concrete test


specification section results / Transmittal NA R&A

Approved MAS copy of using


Project Spec and Drawing requirement concrete grades NA R&A

ITP Manufcaturer Test Report / 3rd NA R&A


Party Test

ITP 3rd Party Test report NA R&A

Approved Survey report -Shop Survey level sheet,RFI (Request


Drawing for Inspection) NA W

RFI for Reinforcement & Check NA W


As per IFC Drawing and Tolerance Spec list
and code
RFI for Formwork to Proceed NA W
As per IFC Drawing and Tolerance Spec concrete
and code
Mix design Parameter RFI for Reinforcement & NA W
formwork and concreting

As per Spec / RMC Plant QCP Test results reports submittal,


(Minimum 3 in one sample test asper Concrete cube register ,Third NA R&A
code requirement) party strength report

As per Spec Visual Observation NA RW

Spec and ACI 117-10 Inspection Record NA RW

t to be performed to determine the acceptability of an item for further processing.

Approval or Approved with Comments required to proceed for Further processing.

d party inspector/Consultant, Client representative witnesses any inspection and or test to determine the acceptability of an it

ongoing process to meet the Specs & Procedure Requirements ( no any documents required)
ONSIBILITY
REMARKS
AHC

RFI for
H Reinforcement ,Formwork ,concrete
combined in one inspection

H
H

ine the acceptability of an item for further processing