BSP-BSCGP-SMS-SWP-00004
WBS Code:
1
Document Title Document Number
BSP-BSCGP-SMS-SWP-00004
WBS Code:
6. PPE REQUIRED
Safety Glasses, as Face Shield Chemical Resistant
☒ required
☐ ☐ Gloves
Vapour Respirator
☐ Hearing Safety ☐ (Half Mask) ☐ Safety Ty-vex Suit
General Purpose /
☒ Hard Hat ☐ Long sleeve shirt ☒ Leather Gloves
2
Document Title Document Number
BSP-BSCGP-SMS-SWP-00004
WBS Code:
If there is a lift currently in place, crane Overhead hazards Workers to stay clear of lift areas.
operator to safely stop lift and prepare Crane stoppage Workers to wear hard hats on site.
DEP lift.
Communication Issues Train the crane operator on how to
safely stop.
The rigger must attend and coordinate
with the crane operator, which is the
best location to lower the load and take
the DEP BOX.
3
Document Title Document Number
BSP-BSCGP-SMS-SWP-00004
WBS Code:
Clear Communication
Crane operator lifts DEP to location Overhead hazards Workers to stay clear of lift areas.
specified by First Aid Attendant. Risk of Dropping or Mishandling Ensure that the crane operator is
Collision Hazard competent and trained in operating the
crane safely, including lifting and
Pinch Points and Crush Hazards positioning loads accurately.
Communication Issues Establish clear communication channels
between the crane operator and the first
aid attendant to ensure accurate
positioning of the DEP.
Ensure that the DEP is properly rigged
and secured to the crane's hook using
appropriate rigging equipment to
4
Document Title Document Number
BSP-BSCGP-SMS-SWP-00004
WBS Code:
Rigger communicates to crane operator Miscommunication: Inadequate Establish clear and effective
that rigging is complete, and DEP is communication between the rigger and communication protocols between the
ready to be lifted. the crane operato rigger and the crane operator, ensuring
Incomplete or Faulty Rigging that all instructions are understood and
acknowledged.
Risk of Falling Objects
5
Document Title Document Number
BSP-BSCGP-SMS-SWP-00004
WBS Code:
6
Document Title Document Number
BSP-BSCGP-SMS-SWP-00004
WBS Code:
For workers on the ground level between the lock block wall and the transition box wall, rescue procedure is as follows:
• Minor injury: walkout and get assessment/treatment outside of the work area.
• Major injury: not life threatening but can't walk out on their own = flexible stretcher, worker extraction by work
group. OFA2/3 assessment and decision-making time at location.
• Major threat to life: flexible stretcher, worker extraction by work group. Assess and direct as the situation dictates.
• Minor injury: walkout and get assessment/treatment outside of the work area.
• Major injury: not life threatening but can't walk out on their own = Crane deploys DEP Box to location adjacent to or
on top of scaffolding if needed, and extraction via crane (if DEP box placed on
top of scaffolding, place it in such a way that distributes the loads evenly and doesn't concentrate on a specific part of the
scaffold). OFA2/3 assessment and decision-making time at location.
• Major threat to life: Crane deploys DEP Box to location adjacent to or on top of scaffolding it needed, and extraction
via crane (if DEP box placed on top of scaffolding place, it in such a way that distributes the loads evenly and doesn't
concentrate on a specific part of the scaffold). Have medical aid on the way and assess and direct as the situation dictates.
BSP-BSCGP-SMS-SWP-00004
WBS Code:
8
Document Title Document Number
BSP-BSCGP-SMS-SWP-00004
WBS Code: