You are on page 1of 10

S150 型液压测试架

HYDRAULIC JAR TESTER S150


使 用 说 明 书
INSTRUCTION MANUAL

贵州高峰石油机械股份有限公司
GuiZhou GaoFeng Petroleum Machinery Co.,Ltd.
目 录
LIST
S150 型液压测试架

1. 概述 ..................................................................................................................................................1

2. 结构 .................................................................................................................................................. 1

3. 安装调试 ...........................................................................................................................................1

4. 操作使用 ...........................................................................................................................................2

5. 保养维修 ...........................................................................................................................................2

HYDRAULIC JAR TESTER S150

1. GENERAL.........................................................................................................................................3

2. STRUCTURE....................................................................................................................................3

3. INSTALLATION AND PRELIMINARY TEST.............................................................................3

4. OPERATION.....................................................................................................................................4

5. MAINTENANCE AND CARE.........................................................................................................5

HYDRAULIC JAR TESTER S150

1. GENERAL.........................................................................................................................................6

2. ESTRUCTURA.................................................................................................................................6

3. INSTALACIÓN Y PRUEBA............................................................................................................6

4. OPERACIÓN....................................................................................................................................7

5. MANTENIMIENTO.........................................................................................................................8

R
S150 型液压测试架

S150 型液压测试架
1. 概述
液压测试架是石油、地质部门和石油机械生产厂家检测钻具震击工具、打捞工具、加速器和减震器等工

具的拉力性能和压力性能的主要设备。它是我厂研制的 YXD20 型全液压拆装架的配套产品。它具有功能全、

自动化程度高、适用范围大、安全可靠等显著的特点。

2. 结构
S150 型液压测试架由控制台工作机组成。控制台(见图 1)由电动机、轴向柱塞泵、多路换向阀、压力

表、溢流阀、油箱,压力管线及一些控制元件、仪表和附件组成。

工作机(见图 2 S150 型液压测试架工作机):1470×785×600(长×宽×高)。

3. 安装调试
3.1 S150 型液压测试架工作机的桁架出厂为两体,安装时应进行对焊组合为一体。二节桁架焊接时要保证平

行和垂直。焊后导轨面应平直。

3.2 组装前先消除各焊缝处的毛刺、锐角、杂质等。

3.3 在安装和调试油缸时,要保证液缸中心与桁架中线同心,并保证液缸中心与轨道平面平行,其平行度公

差为 0.5mm。

3.4 符合要求后,液压系统应从空载慢慢地运转,注意要排净系统内气体。

3.5 液缸活塞杆应伸缩灵活,并进行液缸两腔的密封性能试验,试验压力 28MPa,保压 5min,液缸及连接管

应不渗不漏。

R
S150 型液压测试架

3.6 进行整体的最大拉力调试试验,试验拉力为 1.53MN,试验时液缸内及各连接处不应有不正常的响声。

图 2 S150 型液压测试架工作机
4. 操作使用
4.1 在操作前,必须对油路、油箱进行清洗并排净清洗油,再装入抗磨液压油。

4.2 接通电源,打开组合开关,然后按下启动按钮启动设备。

4.3 设备应运转 3 分钟后,方可进行测试。

4.4 打开压力表开关,调节溢流阀,使液压系统的压力值达到被测工件要求的工作压力。调节变量泵手轮,

使之达到合适位置,然后进行测试。

4.5 在被测试产品的两端接上专用的试验接头,然后吊装在测试架上。

4.6 调整测试架上固定尾架和活动支架的位置,使被测试产品处于测试状态。

4.7 被测试产品装在测试架上应可靠,保持水平,不应有倾斜、卡滞等现象。

4.8 操纵换向阀手柄使液压油进入液缸进行推拉测试工作。

5. 保养维修
5.1 S150 型液压测试架出厂后,用户用满七天,须将全部油液滤清一次,并清洗油箱和滤油器,以后每 6 个

月更换一次油液,清洗一次油箱。

5.2 使用过程中严禁由于系统发热而将油箱盖或注油孔打开。

5.3 液压管线应呈自由状态,不允许成直角。

5.4 测试架未工作时,系统上不允许有被测产品。

5.5 每 6 个月清洁一次滤油器。

5.6 每周检查一次液压管线的泄漏情况。

5.7 每周检查一次液压缸的泄漏情况。

5.8 经常检查各种液压元件的泄漏情况。

R
HYDRAULIC JAR TESTER S150
3

HYDRAULIC JAR TESTER S150


1. GENERAL
Hydraulic Jar Tester is the key equipment for testing pulling force and pressure performance of the
special-purpose oil drilling tools, jars and fishing tools. It forms a complete set for full-hydraulic tool service unit
type YXD20 developed by our company. It is designed and made by our company on the basis of foreign update
technology and combined with the status and the characteristics of petroleum industry in our country. This equipment
is of the outstanding characteristics of overall functions, highly automation, wide range of applications, safety and
reliability, etc. With its large tested tonnage and easily hoisting and installing, it may greatly reduce labor intensity of
the workers. On the whole, it can meet the needs of the pipe stations of relevant factories, petroleum geological field
units.
2. STRUCTURE
Hydraulic Jar Tester Type S150 consists of the control part and the working part. As to the control part (Fig. 1),
it

includes a control desk, which is composed of certain controlling components and accessories: axial plunger pump of
the motor, multiple change valves, pressure gage, overflow valve, oil tank, hydraulic line pipe, etc.
As to the working part (Fig. 2), it is made up of the key components of hydraulic cylinder adjustable supports, fixed
tail supports, truss, etc. With a group a 16Ⅲ—5000 high-pressure duct, it is connected with the control desk.
3. INSTALLATION AND PRELIMINARY TEST
3.1 The truss for Jar Tester Type S150 is divided into two sections when leaving the company, which shall be welded
into an integrated body when installed. The twosections of the truss shall be kept paralleled and perpendicular to each
other while butt welded. The guiding rail plane shall be kept horizontal and straight after welding.

R
HYDRAULIC JAR TESTER S150
4

3.2 While installed and adjusted, the center of the oil cylinder shall be assured to be homocentric with the central line
of the truss, and be paralleled with the rail plane, with the allowance of the parallel degree of 0.5.
3.3 Before being assembled, the burn, the acute angle, impurities, etc. shall be cleared away from the soldering joint.
3.4 After being assembled, hydraulic cylinder shall be pulled and pushed flexibly. A hydraulic sealed property test
shall be carried out with the testing pressure of 28 MPa and holding pressure time for 5 minutes. Hydraulic cylinder
and the connecting joints shall be without any leakage. The same test shall be carried out in the two cavities of the

Fig.2 working Part


cylinder.
3.5 Test for maximum integral pulling force shall be carried out, with the testing pulling force of 1.53 MN. There
should be no irregular sounds in the cylinder or in any joints when testing.
3.6 When the test meets the requirements, hydraulic system shall be operated from blank run to slow run; attention
shall be paid to exhaust all the gases in the system.
4. OPERATION
4.1 Before operation, oil circuit and oil tank shall be cleaned and the cleaning oil shall be discharged entirely, then
abrasively hydraulic oil No.20 shall be filled in.
4.2 Connect the power; turn on the combination switch; then press the starting button and start the equipment.
4.3 After 3 minutes’ running of the equipment, the trial test may start.
4.4 Turn on the switch of pressure gage and adjust the overflow valve so as to make the pressure in the hydraulic
system reach the required working pressure. Adjust the hand wheel of the pump at the proper position and then carry
out the test.
4.5 Push the hand lever of multiple change valve and let the hydraulic oil go into the hydraulic cylinder to work.
4.6 Place the test connectors on both ends of the product to be tested, and then hoist the product to be tested on the jar
tester.
4.7 After mounting the product on the tester, adjust the positions of the fixed tail support and the adjustable support so
as to make the product to be tested under being tested status.
4.8 While hoisting, try to keep the product to be tested horizontal; while mounting on the tester, try to keep it stable;
inclination and seizing-up shall not allowed. After hoisting and installing, push-pull trial run may be carried out.

R
HYDRAULIC JAR TESTER S150
5

5. MAINTENANCE AND CARE


5.1 After the ex-company Hydraulic Jar Tester Type S150 is used for a week by the user, all the oil tank and oil filter
shall be cleaned. Later on, change the oil and clean the oil tank once in half a year.
5.2 It is strictly prohibited to open the oil cylinder cover or oil filter point because of the heating of the system during
operation.
5.3 Hydraulic pipe line shall be in free a state, not to allow it in right-angle state.
5.4 While the tester is not under operation, not any product to be tested shall be allowed in the system.
5.5 Oil filter shall be cleaned once in half a year.
5.6 Check the leakage of the hydraulic pipe line once a week.
5.7 Check the leakage of hydraulic cylinder once a week.
5.8 Check the leakage of various hydraulic elements regularly.

R
HYDRAULIC JAR TESTER S150
6

HYDRAULIC JAR TESTER S150


1. GENERAL
Tester Jar hidráulico es el equipo clave para probar la fuerza de tracción y el rendimiento de la presión de las
herramientas de perforación de petróleo para fines especiales, tarros y herramientas de pesca. Forma un conjunto
completo para el servicio de herramienta de tipo de unidad YXD20 completo hidráulico desarrollado por nuestra
empresa. Está diseñado y realizado por nuestra empresa sobre la base de la tecnología de actualización extranjera y se
combina con el estado y las características de la industria petrolera en nuestro país. Este equipo es de las
características destacadas de funciones generales, altamente automatización, amplia gama de aplicaciones, seguridad
y fiabilidad, etc. Con su gran tonelaje probado y fácil de elevación y la instalación, puede reducir en gran medida la
intensidad de trabajo de los trabajadores. En general, puede satisfacer las necesidades de las estaciones de tubería de
fábricas pertinentes, las unidades de campo geológicos derivados del petróleo.

2.ESTRUCTURA
Hidráulico Tipo Tester Jar S150 consta de la parte de control y la parte de trabajo. En cuanto a la parte de control
(Fig.1), incluye una mesa de control, que se compone de ciertos componentes de control y accesorios: bomba de
émbolo axial del motor, múltiples válvulas de cambio, manómetro, válvula de seguridad, tanque de aceite, tubos de
conducción hidráulica, etcétera
En cuanto a la parte de trabajo (Fig. 2), que se compone de los componentes clave de cilindro hidráulico soportes
ajustables, cola fija apoya, armadura, etc. Con un grupo de un conducto de alta presión 16Ⅲ-5000, que está
conectado con el mesa de control.
3. INSTALACIÓN Y PRUEBA
3.1 La armadura de Tester Jar Tipo S150 está dividida en dos secciones al salir de la empresa, que se suelda en un

R
HYDRAULIC JAR TESTER S150
7

cuerpo integrado cuando se instala. Los twosections de la cercha se mantendrán paralelos y perpendiculares entre sí
mientras soldadas a tope. El avión carril guía deberá mantenerse horizontal y recta después de la soldadura.
3.2 Si bien instalado y ajustado, el centro del cilindro de aceite se aseguró ser homocéntrico con la línea central de la
viga, y poner en paralelo con el plano ferroviario, con la asignación del grado paralelo de 0,5.
3.3 Antes de ser montado, la quemadura, el ángulo agudo, impurezas, etc., se borra un fuera de la junta de soldadura.
3.4 Después de ser montado, cilindro hidráulico se tiró y empujó con flexibilidad. Una prueba hidráulica propiedad
sellada se llevará a cabo con la presión de prueba de 28 MPa y tiempo de mantenimiento de presión durante 5

Fig.2 working Part

minutos. Cilindro hidráulico y las juntas de conexión deberán ser sin ninguna fuga. La misma prueba se llevará a
cabo en las dos cavidades del cilindro.

3.5 Prueba para la máxima fuerza de tracción integral se llevará a cabo, con la prueba de fuerza de tracción de 1,53
MN. No debe haber ruidos irregulares en el cilindro o en las juntas durante la prueba.
3.6 Cuando el ensayo cumple los requisitos, el sistema hidráulico se efectuará desde blanco carrera para frenar plazo;
Se prestará atención a agotar todos los gases en el sistema.
4. OPERACIÓN
4.1 Antes de la operación, el circuito de aceite y depósito de aceite se limpiarán y el aceite de limpieza serán
desempeñados por completo, entonces No.20 aceite abrasivamente hidráulico deberá ser completado.
4.2 Conecte la fuente; encienda el interruptor de combinación; a continuación, pulse el botón de inicio y comenzar el
equipo.
4.3 Después de 3 minutos en funcionamiento de los equipos, la prueba de juicio puede comenzar.
4.4 Activar el interruptor de manómetro de presión y ajustar la válvula de rebose a fin de hacer que la presión en el
sistema hidráulico llegar a la presión de trabajo requerida. Ajuste el volante de la bomba en la posición correcta y
luego llevar a cabo la prueba.
4.5 Empuje la palanca de mano de la válvula de cambio múltiples y dejó la marcha de aceite hidráulico en el cilindro

R
HYDRAULIC JAR TESTER S150
8

hidráulico para trabajar.


4.6 Coloque los conectores de prueba en ambos extremos del producto a ensayar, y luego izar el producto a ensayar
en el probador frasco.
4.7 Después de montar el producto en el probador, ajustar las posiciones de la cola de apoyo fijo y el apoyo ajustable
para hacer que el producto a ensayar bajo estado siendo probado.
4.8 Mientras izado, trate de mantener el producto a ensayar horizontal; mientras que el montaje en el probador, tratar
de mantenerlo estable; No se permite la inclinación y la incautación de seguimiento. Después de izado y la instalación,
funcionamiento de ensayo push-pull puede llevarse a cabo.
5. MANTENIMIENTO
5.1 Después de la ex empresa hidráulico Tipo Tester Jar S150 se utiliza para una semana por el usuario, se limpiarán
todo el depósito de aceite y filtro de aceite. Más adelante, cambiar el aceite y limpiar el depósito de aceite una vez en
medio año.
5.2 Queda terminantemente prohibido abrir el punto de la tapa del cilindro de aceite o filtro de aceite debido al
calentamiento del sistema durante el funcionamiento.
5.3 Tubería hidráulica estará en un estado libre, no permitir que en el estado en ángulo recto.
5.4 Mientras que el probador no está en funcionamiento, no cualquier producto a ensayar, se admite el sistema.
5.5 Filtro de aceite se limpian una vez en medio año.
5.6 Compruebe la fuga de la tubería hidráulica una vez por semana.
5.7 Compruebe la fuga del cilindro hidráulico una vez a la semana.
5.8 Compruebe la fuga de varios elementos hidráulicos con regularidad.

You might also like