贵州高峰石油机械股份有限公司
GuiZhou GaoFeng Petroleum Machinery Co.,Ltd.
目 录
LIST
S150 型液压测试架
1. 概述 ..................................................................................................................................................1
2. 结构 .................................................................................................................................................. 1
3. 安装调试 ...........................................................................................................................................1
4. 操作使用 ...........................................................................................................................................2
5. 保养维修 ...........................................................................................................................................2
1. GENERAL.........................................................................................................................................3
2. STRUCTURE....................................................................................................................................3
4. OPERATION.....................................................................................................................................4
1. GENERAL.........................................................................................................................................6
2. ESTRUCTURA.................................................................................................................................6
3. INSTALACIÓN Y PRUEBA............................................................................................................6
4. OPERACIÓN....................................................................................................................................7
5. MANTENIMIENTO.........................................................................................................................8
○
R
S150 型液压测试架
1
S150 型液压测试架
1. 概述
液压测试架是石油、地质部门和石油机械生产厂家检测钻具震击工具、打捞工具、加速器和减震器等工
自动化程度高、适用范围大、安全可靠等显著的特点。
2. 结构
S150 型液压测试架由控制台工作机组成。控制台(见图 1)由电动机、轴向柱塞泵、多路换向阀、压力
表、溢流阀、油箱,压力管线及一些控制元件、仪表和附件组成。
3. 安装调试
3.1 S150 型液压测试架工作机的桁架出厂为两体,安装时应进行对焊组合为一体。二节桁架焊接时要保证平
行和垂直。焊后导轨面应平直。
3.2 组装前先消除各焊缝处的毛刺、锐角、杂质等。
3.3 在安装和调试油缸时,要保证液缸中心与桁架中线同心,并保证液缸中心与轨道平面平行,其平行度公
差为 0.5mm。
3.4 符合要求后,液压系统应从空载慢慢地运转,注意要排净系统内气体。
应不渗不漏。
○
R
S150 型液压测试架
2
图 2 S150 型液压测试架工作机
4. 操作使用
4.1 在操作前,必须对油路、油箱进行清洗并排净清洗油,再装入抗磨液压油。
4.2 接通电源,打开组合开关,然后按下启动按钮启动设备。
4.4 打开压力表开关,调节溢流阀,使液压系统的压力值达到被测工件要求的工作压力。调节变量泵手轮,
使之达到合适位置,然后进行测试。
4.5 在被测试产品的两端接上专用的试验接头,然后吊装在测试架上。
4.6 调整测试架上固定尾架和活动支架的位置,使被测试产品处于测试状态。
4.7 被测试产品装在测试架上应可靠,保持水平,不应有倾斜、卡滞等现象。
4.8 操纵换向阀手柄使液压油进入液缸进行推拉测试工作。
5. 保养维修
5.1 S150 型液压测试架出厂后,用户用满七天,须将全部油液滤清一次,并清洗油箱和滤油器,以后每 6 个
月更换一次油液,清洗一次油箱。
5.2 使用过程中严禁由于系统发热而将油箱盖或注油孔打开。
5.3 液压管线应呈自由状态,不允许成直角。
5.4 测试架未工作时,系统上不允许有被测产品。
5.5 每 6 个月清洁一次滤油器。
5.6 每周检查一次液压管线的泄漏情况。
5.7 每周检查一次液压缸的泄漏情况。
5.8 经常检查各种液压元件的泄漏情况。
○
R
HYDRAULIC JAR TESTER S150
3
includes a control desk, which is composed of certain controlling components and accessories: axial plunger pump of
the motor, multiple change valves, pressure gage, overflow valve, oil tank, hydraulic line pipe, etc.
As to the working part (Fig. 2), it is made up of the key components of hydraulic cylinder adjustable supports, fixed
tail supports, truss, etc. With a group a 16Ⅲ—5000 high-pressure duct, it is connected with the control desk.
3. INSTALLATION AND PRELIMINARY TEST
3.1 The truss for Jar Tester Type S150 is divided into two sections when leaving the company, which shall be welded
into an integrated body when installed. The twosections of the truss shall be kept paralleled and perpendicular to each
other while butt welded. The guiding rail plane shall be kept horizontal and straight after welding.
○
R
HYDRAULIC JAR TESTER S150
4
3.2 While installed and adjusted, the center of the oil cylinder shall be assured to be homocentric with the central line
of the truss, and be paralleled with the rail plane, with the allowance of the parallel degree of 0.5.
3.3 Before being assembled, the burn, the acute angle, impurities, etc. shall be cleared away from the soldering joint.
3.4 After being assembled, hydraulic cylinder shall be pulled and pushed flexibly. A hydraulic sealed property test
shall be carried out with the testing pressure of 28 MPa and holding pressure time for 5 minutes. Hydraulic cylinder
and the connecting joints shall be without any leakage. The same test shall be carried out in the two cavities of the
2.ESTRUCTURA
Hidráulico Tipo Tester Jar S150 consta de la parte de control y la parte de trabajo. En cuanto a la parte de control
(Fig.1), incluye una mesa de control, que se compone de ciertos componentes de control y accesorios: bomba de
émbolo axial del motor, múltiples válvulas de cambio, manómetro, válvula de seguridad, tanque de aceite, tubos de
conducción hidráulica, etcétera
En cuanto a la parte de trabajo (Fig. 2), que se compone de los componentes clave de cilindro hidráulico soportes
ajustables, cola fija apoya, armadura, etc. Con un grupo de un conducto de alta presión 16Ⅲ-5000, que está
conectado con el mesa de control.
3. INSTALACIÓN Y PRUEBA
3.1 La armadura de Tester Jar Tipo S150 está dividida en dos secciones al salir de la empresa, que se suelda en un
○
R
HYDRAULIC JAR TESTER S150
7
cuerpo integrado cuando se instala. Los twosections de la cercha se mantendrán paralelos y perpendiculares entre sí
mientras soldadas a tope. El avión carril guía deberá mantenerse horizontal y recta después de la soldadura.
3.2 Si bien instalado y ajustado, el centro del cilindro de aceite se aseguró ser homocéntrico con la línea central de la
viga, y poner en paralelo con el plano ferroviario, con la asignación del grado paralelo de 0,5.
3.3 Antes de ser montado, la quemadura, el ángulo agudo, impurezas, etc., se borra un fuera de la junta de soldadura.
3.4 Después de ser montado, cilindro hidráulico se tiró y empujó con flexibilidad. Una prueba hidráulica propiedad
sellada se llevará a cabo con la presión de prueba de 28 MPa y tiempo de mantenimiento de presión durante 5
minutos. Cilindro hidráulico y las juntas de conexión deberán ser sin ninguna fuga. La misma prueba se llevará a
cabo en las dos cavidades del cilindro.
3.5 Prueba para la máxima fuerza de tracción integral se llevará a cabo, con la prueba de fuerza de tracción de 1,53
MN. No debe haber ruidos irregulares en el cilindro o en las juntas durante la prueba.
3.6 Cuando el ensayo cumple los requisitos, el sistema hidráulico se efectuará desde blanco carrera para frenar plazo;
Se prestará atención a agotar todos los gases en el sistema.
4. OPERACIÓN
4.1 Antes de la operación, el circuito de aceite y depósito de aceite se limpiarán y el aceite de limpieza serán
desempeñados por completo, entonces No.20 aceite abrasivamente hidráulico deberá ser completado.
4.2 Conecte la fuente; encienda el interruptor de combinación; a continuación, pulse el botón de inicio y comenzar el
equipo.
4.3 Después de 3 minutos en funcionamiento de los equipos, la prueba de juicio puede comenzar.
4.4 Activar el interruptor de manómetro de presión y ajustar la válvula de rebose a fin de hacer que la presión en el
sistema hidráulico llegar a la presión de trabajo requerida. Ajuste el volante de la bomba en la posición correcta y
luego llevar a cabo la prueba.
4.5 Empuje la palanca de mano de la válvula de cambio múltiples y dejó la marcha de aceite hidráulico en el cilindro
○
R
HYDRAULIC JAR TESTER S150
8