Design for Bending Moment

Bending moment Demand MB 19 kNm/m


Torsional Moment Demand MT 6 kNm/m
Total Moment Demand Md 25 kNm/m
Width of The Plinth b 1000 mm
Thickness of Plinth D 300 mm
Cover 50 mm
Effective depth d 244 mm
Concrete Strength f'c 40 MPa
Strength of Reo Steel fy 500 MPa
Minimum reo-SQRT(f'c)*b*d/(4fy) 771.60 mm2
Reo Provided D 12 @ 150 c/c
2
Area of Steel Provided As 753.98 mm
a = Asfy/(0.85f'cb) 11.09 mm
Moment Capacity Mn=Asfy*(d-a/2) 89.8958 kNm
Capacity Reduction Factor 0.85
Actual capacity 76.4 kNm > Md Ok

Check for shear


Shear Demand Vd 75 kN/m
Width of The Plinth b 1000 mm
Thickness of Plinth D 300 mm
Strength of Concrete f'c 40 MPa
Cover 50 mm
Effective depth d 244 mm
Acv 244000 mm2
Reo Provided D 12 @ 150 c/c
2
Area of Steel Provided As 753.98 mm
pw-As/bd 0.003
Vb = smaller of (0.07+10pw) sqrt(f'c) 0.6382
0.2sqrt(f'c) 1.2649
Check 0.6382
0.08sqrt(f'c) 0.5060
Vb 0.6382
ka 1
kd 1.000
Vc 155.71 kN
Capacity Reduction Factor 0.75
Actual Capacity 116.78 kN > Vd Ok