Professional Documents
Culture Documents
Minimum h,
4143
h=
21
h = 197.286
h = 250 mm
Minimum b,
b = 0.3 (250)
b = 75 mm
bw = 300
h=
4143
28 (
0.4 +
420
700 )
h = 147.964 mm say 160 mm
Preliminary Thickness t,
2(4200+ 4143)
t=
180
t = 92.700 mm say 100 mm
SAMPLE COMPUTATION FOR COLUMN:
A) Superimposed Dead Loads
Add. Pressure Loads = 1.3 kpa + 0.18 kpa + 0.5 kpa + 0.1436 kpa
Add. Pressure Loads = 2.1236 kpa
0.02 = As/Ag
As = 0.02Ag
Putotal = (149.142) (2) + 149.142
Putotal = 447.425 kN
b = √ 27122.45279
b = 164.689 mm, 200 < 300; say 300 mm
SAMPLE COMPUTATION FOR FOOTING:
Considering C-1 for FT-C1
Size of Column (C-1) = 300 x 300 mm
Size of Footing = 1800 x 1200 x 450 mm
Total Dead Load = [(112.685 + 119.165 + 125.645 + 132.125) + (6.8 x 48)] kN + [(24)
kN/m^3 (1.8+0.3) (1.2+0.3) (0.45)] m
Total Dead Load = 854.576 kN
Total Live Load = [(8.7 x 48) kN + (4.7 + 4.80 + 2.4 kPa) (0.3) (0.3)
Total Live Load = 418.671 kN
B=
√ 1273.247
230
B = 2.3528 say 3; Footing dimension is 3 x 3 m
Pu = 1.2(854.576) + 1.6(418.671)
Pu = 1695.3648 kN
qu = 1695.3648 / 3x3
qu = 188.374 kPa
Demand
Vu = 188.374/1000 (675 – d) (1800)
Capacity
Demand = Capacity
D1 = 147.331 mm
Punching Shear
Demand
Vu = (1695.3648 x 1000) – (188.374/1000) (450+d)^2
Capacity
Demand=Capacity
D2 = 366.830 mm
Punching Shear
H = 366.830 + 75 + 20/2