GENERAL CONDITIONS
CLEARING OF SITE
EXCAVATION
BACKFILLS/EARTHFILLS
- Class A (1:2:4)
Slabs - Class C
(1:2:4)
House
Columns – 16mm
Footing – 16mm
Walls – 10mm
Beams – 16mm
Slabs - 10mm
Fence
Columns – 12mm
Footing – 10mm
Walls – 10mm
Beams – 12mm
LUMBER
Formworks and Framing – 2x2x12, 2x3x12 and 2x4x12 Coco Lumber and use of
½ Phenolic Board
CARPENTRY WORKS
Kitchen Cabinet
NOTE:
Pull out cabinets is subject for additional cost (as per client’s
preference )
CEILING
FLOOR FINISHES
TV Wall
Master Bedroom
Doors and door frames shall confirm to the sizes, design and
kind of materials shown in the schedule of doors in the plans.
ROOFING MATERIALS
Angle Bar
Angle Bar
PLUMBING WORKS
Fittings – PVC
ELECTRICAL WORKS
Outlets – Royu or
equivalent
Switches –Royu or
equivalent
Bulbs – Firefly or
equivalent
Breakers – Koten or
equivalent