Employer Doc. No.

NSRP Contractor Doc. No.


Complex Project Nghi Son Refinery and Petrochemical S-154-1224-0411G

Nghi Son, Vietnam


Limited Liability Company Rev. 1 Page 1 of 3

Employer Contract No.: Contractor JOB Code: 0-6495-20 Date: 16-Sep-14

PROCESS DATA SHEET FOR


GASOLINE 92 TRUCK LOADING PUMPS
(154-P-011A/B)
Unit No.: 154
Unit Abbreviation.:
Document Class: X

Issue Purpose For Construction

Rev Date Page Description Prep'd Chk'd App'd

1 16-Sep-14 3 Issue for Construction S.M.K. J.K.S. Y.S.K.


0 10-Jan-14 3 Issue for Construction S.M.K. J.H.Y. Y.S.K.
A 12-Sep-13 3 First Issue S.M.K. J.H.K. Y.S.K.

Operation Centre JOB Code: 09105I Operation Centre Doc. No.:


Responsible Company Prepared by Checked by Approved by
GS S.M.Kim J.K.Seo Y.S.Kim

D R A
N
I 16-SEP 4
- 2 0 1
Employer Doc. No.
NSRP Complex Project Rev. 1

PROCESS DATA SHEET FOR GASOLINE 92 TRUCK LOADING Contractor Doc. No.
Page 2 of 3
PUMPS S-154-1224-0411G

SPECIAL SERVICE REQUIREMENTS


This item is subject to following special services.
Requirements for applicable special service shall be considered for the design.

Item No. 154-P-011A/B Sevice GASOLINE 92 TRUCK LOADING PUMPS

SPECIAL SERVICE APPLICATION REMARKS

Toxic YES NO

Flammable YES NO

Hazardous YES NO

Others YES NO

D R A
N
I 16-SEP 4
- 2 0 1
PUMP PROCESS SPECIFICATION

CUSTOMERS NAME: NGHI SON REFINERY AND PETROCHEMICALS CONTRACTOR JOB No.: 0-6495-20
LOCATION: NGHI SON, VIETNAM OC JOB No.: 09105I
SERVICE: GASOLINE 92 TRUCK LOADING PUMPS DOCUMENT No. S-154-1224-0411G
ITEM No: 154-P-011A/B
REV A 0 1 UNIT No: 154
DATE 2013-09-12 2014-01-10 2014-09-16 UNIT ABBREVIATION:
ORIG. BY S.M.K. S.M.K. S.M.K. DOCUMENT CLASS: X
APP. BY Y.S.K. Y.S.K. Y.S.K. SHEET 3 OF 3
PUMP TYPE: CENTRIFUGAL
NUMBER OF PUMPS REQUIRED: 2 OPERATING 1 INSTALLED SPARE 1
TYPE OF DRIVER: OPERATING ELECTRIC MOTOR INSTALLED SPARE ELECTRIC MOTOR
DUTY: (Continuous/ Intermittent): INTERMITTENT (Note 6)

PROCESS REQUIREMENTS PER PUMP


OPERATING CASE RATED FLOW RATED FLOW
CASE @ 42°C CASE @ 10°C

APPROX. No. OF HRS/YEAR (max)


LIQUID GASOLINE 92 GASOLINE 92

PUMPING TEMP.: Normal °C 42 10


Expected Max. °C (Note 5) (Note 5)
SP.GR. @ P.T. Rated (Min.) 0.738 0.763
Expected Min.
VAPOR PRESS. @ P.T. (max) kPaa 72.4 (Note 7) 27.6 (NOTE 7)
VISCOSITY @ P.T. cP 0.441 0.491
CAPACITY @ P.T Required m³/h 200 200
Normal m³/h 200 200

1 DISCHARGE PRESSURE: Required kPag 573.2 583.0


1 SUCTION PRESSURE: Normal kPag 4.6 5.7
1 DIFFERENTIAL PRESSURE.: kPa 568.6 577.2
1 DIFFERENTIAL HEAD (Note 1) m 79 77
SUCTION PRESS.: (max. possible) kPag 133.6 138.1
NPSH CALCULATED m -
NPSH AVAILABLE (Note 8) m 4.6 10.4
CORROSION / EROSION DUE TO NAME
CONC.
ADDITIONAL PUMP DATA
FLOW CONTROLLED BY

METHOD OF STARTING SPARE PUMP MANUAL


MATERIALS RECOMMENDED (Note 2) CASING: CS INTERNALS: CI
API 610: S-1 (Note 4)
PUMP JACKET REQUIRED (Yes/ No) NO (Process requirement)
PUMP SEALING REQUIREMENT REQUIRED (Note 3)

NOTES
1. PUMP SHUTOFF HEAD SHALL NOT EXCEED 125% OF SPECIFIED DIFFERENTIAL HEAD INCLUSIVE OF ALL TOLERANCES.

2. MOC OF PUMP AND INTERNALS SHALL BE AS PER LATEST REVISION OF MSD NO. : D-154-1223-0901G
3. SEAL TYPE AND PLAN TO BE CONFIRMED BY VENDOR BASED ON PROCESS CONDITION.
4. CENTRIFUGAL PUMP MATERIAL OF CONSTRUCTION CODES AS PER API 610, TABLE H1.

5 DESIGN TEMPERATURE IS 67°C


6. PUMPS ARE USED FOR LOADING GASOLINE 92 PRODUCT TO TRUCK.PUMPS ARE 2X100%.
7. VAPOUR PRESSURE CALCULATED BASED ON PRODUCT GASOLINE COMPONENT, OPERATING AT 42°C &10°C RESPECTIVELY.

8. NPSHA IS BASED ON THE TOP OF FOUNDATION.


9. VENDOR TO CONFIRM MINIMUM CONTINUOUS STABLE FLOW.

D R A ITEM No. 154-P-011A/B SHEET 3 OF 3

N
I P 4
-
16-SE
2 0 1