You are on page 1of 1

A) ULS CAPACITY CHECK

Check Check Check

Ast,cal =M/ 0.87 fyk


xu = 0.87 fyk Ast /

MRd =0.87 fyk Ast


Ast,provided > Ast min
(d'-0.416 xu)

Ast Calc.<Ast Provided

(d-0.416 xu)
0.362 fck b

MRD/z > MED/z


Load comb.
z = d-
MED b d Ast, Provided xmax Check Ast min 0.416 xu MED/z MRD/z

+DFD
2 2 2
Tm mm mm mm mm mm mm mm m T Tm Tm/m

ULS Hogging 1.0 5100 1715 12324.71 772.0257 79.85827 UR, OK 12.42651 OK 12041.6 OK 1681.779 0.594608 991.8079 589.737 OK

ULS Sagging 1355.1 5100 1715 20212.52 772.0257 130.9676 UR, OK 17054.7 OK 12041.6 OK 1660.517 816.0673 1606.001 967.169 OK

B) SLS STRESS CHECK


Rare Load combination. Formula used for calculation of stress
Ec,eq = Ecm*(MQP+MST) dc (depth of neutral axis) = -m*As + Ö ( m2 * As2 + 2* m*As*b* d )
MST +(1+f)* MQP
MST = MRARE -MQP INA (Transformed) = b *dc3/3 + m* As *(d-dc)2
m = Es/ Ec,eq
Compressive stress in concrete sc = MRARE* dc / INA
Quasi Permanent Load Combination Tensile stress in steel ss = m* MRARE* (d - dc ) / INA
m = Es / Ecm'

Stress Check for SLS Load Combinations


M
Max T
modular N.A. depth Comp Max C. Tensile
Check Stress Check
Load comb. b d Ast, Provided ratio (dc) INA stress Stress stress
(tm/m) mm mm mm2 mm mm4 Mpa Mpa Mpa Mpa

Check for Hogging Moment


SLS (R Comb.) 1.0 5E+03 1715.0 1E+04 12.90 596.4567 6E+11 0.01 19.2 OK 0.26 300 OK
SLS (QP Comb.) 1.0 5E+03 1715.0 1E+04 12.90 596.4567 6E+11 0.01 14.4 OK 0.26 300 OK
Check for Sagging Moment
SLS (R Comb.) 896.53 5E+03 1715.0 2E+04 11.2 683.2281 8E+11 7.82 19.2 OK 132.22 300 OK

You might also like