Form Work - Checklist
Form Work - Checklist
8. Is the foam strip around the column starter in place to avoid slurry leakages?
9. Does the level of the slab and beam shuttering correspond to the levels given in the
drawing?
10. Has the shuttering been checked for proper fixing and sufficient support for
concreting?
14. Are all the required cut outs and shaft openings in place and checked for correct
measurement?
15. Have the peripheral areas and cut outs been provided with sufficient cover blocks?
16. Is the brown tape in place and the oil properly applied?