THALIKULAM TO KODDANGLUR (PKG-5) - Proposed Pile Tests


Intial No of Test Routine LoadTest
Type of Pile required as required as per Lateral Load
Sr. No Chainage Pile Group No. of Pile Pile Depth Category Integrity Test Remarks
structure per MoRTH MoRTH Claue Test
Claue 1113.1 1113.3
1 371+295 Fly over A1 (RHS,LHS) 4 8 24 D 2 4
1 371+295 Fly over A2 (RHS,LHS) 4 8 24 D 4
1 371+295 Fly over P1 (RHS,LHS) 6 12 24 D 6
1 371+295 Fly over P2 (RHS,LHS) 6 12 24 D 6
2 372+836 LVUP A1,A2 (RHS,LHS) 6 24 26 B 1 2 1 12
3 374+080 VUP A1,A2 (RHS,LHS) 8 32 26 B 2 16
4 378+575 VUP A1,A2 (RHS,LHS) 8 32 34 A 2 2 1 16
5 381+760 VUP A1,A2 (RHS,LHS) 8 32 24 D 1 2 1 16
6 383+103 VUP A1,A2 (RHS,LHS) 8 32 20 H 1 2 1 16
7 384+132 VUP A1,A2 (RHS,LHS) 4 16 22 F 1 2 1 8
8 385+370 VUP A1,A2 (RHS,LHS) 4 16 18 I 2 8
9 386+516 VUP A1,A2 (RHS,LHS) 4 16 18 I 1 2 1 8
10 389+465 Elevated Viaduct A1 (RHS,LHS) 8 16 22 F 8
10 389+465 Elevated Viaduct P1 (RHS,LHS) 8 16 22 F 8
10 389+465 Elevated Viaduct P2 (RHS,LHS) 8 16 22 F 8
10 389+465 Elevated Viaduct P3 (RHS,LHS) 6 12 21 G 1 1 1 6
10 389+465 Elevated Viaduct P4 (RHS,LHS) 6 12 22 F 6
10 389+465 Elevated Viaduct P5 (RHS,LHS) 8 16 20 H 1 8
10 389+465 Elevated Viaduct P6 (RHS,LHS) 6 12 25 C 1 1 1 6
10 389+465 Elevated Viaduct P7 (RHS,LHS) 9 18 22 F 1 1 1 9
10 389+465 Elevated Viaduct P8 (RHS,LHS) 8 16 22 F 8
10 389+465 Elevated Viaduct P9 (RHS,LHS) 6 12 23 E 1 1 1 6
10 389+465 Elevated Viaduct P10 (RHS,LHS) 6 12 24 D 1 1 1 6
10 389+465 Elevated Viaduct P11 (RHS,LHS) 8 16 22 F 8
10 389+465 Elevated Viaduct P12 (RHS,LHS) 6 12 23 E 1 6
10 389+465 Elevated Viaduct P13 (RHS,LHS) 6 12 24 D 6
10 389+465 Elevated Viaduct P14 (RHS,LHS) 8 16 20 H 8
10 389+465 Elevated Viaduct P15 (RHS,LHS) 6 12 22 F 1 6
10 389+465 Elevated Viaduct P16 (RHS,LHS) 8 16 22 F 8
10 389+465 Elevated Viaduct P17 (RHS,LHS) 8 16 25 C 8
10 389+465 Elevated Viaduct P18 (RHS,LHS) 6 12 25 C 6
10 389+465 Elevated Viaduct P19 (RHS,LHS) 6 12 22 F 6
10 389+465 Elevated Viaduct P20 (RHS,LHS) 8 16 22 F 1 8
10 389+465 Elevated Viaduct P21 (RHS,LHS) 6 12 25 C 1 1 1 6
10 389+465 Elevated Viaduct P22 (RHS,LHS) 6 12 25 C 6
10 389+465 Elevated Viaduct P23 (RHS,LHS) 8 16 22 F 8
10 389+465 Elevated Viaduct P24 (RHS,LHS) 8 16 24 D 8
10 389+465 Elevated Viaduct P25 (RHS,LHS) 6 12 26 B 1 1 1 6
10 389+465 Elevated Viaduct P26 (RHS,LHS) 8 16 22 F 8
10 389+465 Elevated Viaduct P27 (RHS,LHS) 9 18 22 F 9
10 389+465 Elevated Viaduct P28 (RHS,LHS) 8 16 26 B 8
10 389+465 Elevated Viaduct P29 (RHS,LHS) 8 16 22 F 1 8
THALIKULAM TO KODDANGLUR (PKG-5) - Proposed Pile Tests
Intial No of Test Routine LoadTest
Type of Pile required as required as per Lateral Load
Sr. No Chainage Pile Group No. of Pile Pile Depth Category Integrity Test Remarks
structure per MoRTH MoRTH Claue Test
Claue 1113.1 1113.3
10 389+465 Elevated Viaduct A2 (RHS,LHS) 8 16 22 F 8
11 391+590 LVUP A1,A2 (RHS,LHS) 4 16 22 F 2 8
12 393+280 VUP A1,A2 (RHS,LHS) 4 16 22 F 2 8
13 394+560 Elevated Viaduct A1 (RHS,LHS) 4 8 18 I 1 1 1 4
13 394+560 Elevated Viaduct P1 (RHS,LHS) 5 10 22 F 1 5
13 394+560 Elevated Viaduct P2 (RHS,LHS) 8 16 21 G 1 8
13 394+560 Elevated Viaduct P3 (RHS,LHS) 5 10 21 G 5
13 394+560 Elevated Viaduct P4 (RHS,LHS) 5 10 20 H 5
13 394+560 Elevated Viaduct P5 (RHS,LHS) 8 16 20 H 1 1 1 8
13 394+560 Elevated Viaduct A2 (RHS,LHS) 4 8 20 H 4
14 395+958 LVUP A1,A2 (RHS,LHS) 5 20 22 F 2 10
15 396+888 Fly over A1 (RHS,LHS) 4 8 22 F 1 1 1 4
15 396+888 Fly over P1 (RHS,LHS) 6 12 26 B 6
15 396+888 Fly over P2 (RHS,LHS) 6 12 22 F 6
15 396+888 Fly over A2 (RHS,LHS) 4 8 21 G 1 1 1 4
Total (5) 990 19 41 17 495