PROJECT I

Project Name : USSHAR PROJECT


Location : BATANAGAR
Contractor Name : SM NIRMAN INFRASTRUCTURE & DEVELOPMENT PVT. LTD.

Number of Re
Weather 4.0

5.0

3.0

7.0

5.0

6.0

4.0
No

Temp 26°C
Description of

Weather
SUNNY
Worker

Carpenter Helper
Type

Masson Helper
Wind 18Km/hr

Fitter helper
Carpenter
FORMAN

Masson
Humidity 55%

Fitter
Location Activity / Description of work

RAC Reinforcement
Shuttering
Plaster work RAC outside
T12 Reinforcement
Mivan Shuttering
Concreting
Plaster work at T12 2nd floor

H
Name Surname
SUBRATA MAJUMDER
DAILY PROGRESS REPORT
PROJECT INFORMATION

Date : 10TH MARCH


T. LTD. Day of Week : SUNDAY

Number of Resources ( Personnel & Major Equipment)


14.0
5.0

6.0

2.0

2.0
61

Bar Bending Machine


Bar Cutting Machine
Backhoe Loader
Excavator
Electrical

Unskilled

Dumper
Chipper

Skilled

Quantity % Prog
UOM T-12, 28th to 29th Floor Shutt
Previous
binding.
MT 0.0
Sqm 0.0
Sqm 0.0
MT 1.5
Sqm 100.0
CUM 0.0
Sqm 0.0

Humidity

SR. ENGINEER
ORT

10TH MARCH
SUNDAY
1.0

1.0

4
Concrete Pump

Total Plant
Lifting Hoist

Vibrator

% Progress
T-12, 28th to 29th Floor Shuttering, 29 th Floor Slab
binding.

SR. ENGINEER