NIRMAN
Infrastructure & Development Pvt. Ltd.
CIN U45400WB2008PTC131098
PROJECT I
Number of Re
Weather 4.0
5.0
3.0
7.0
5.0
6.0
4.0
No
Temp 26°C
Description of
Weather
SUNNY
Worker
Carpenter Helper
Type
Masson Helper
Wind 18Km/hr
Fitter helper
Carpenter
FORMAN
Masson
Humidity 55%
Fitter
Location Activity / Description of work
RAC Reinforcement
Shuttering
Plaster work RAC outside
T12 Reinforcement
Mivan Shuttering
Concreting
Plaster work at T12 2nd floor
H
Name Surname
SUBRATA MAJUMDER
DAILY PROGRESS REPORT
PROJECT INFORMATION
6.0
2.0
2.0
61
Unskilled
Dumper
Chipper
Skilled
Quantity % Prog
UOM T-12, 28th to 29th Floor Shutt
Previous
binding.
MT 0.0
Sqm 0.0
Sqm 0.0
MT 1.5
Sqm 100.0
CUM 0.0
Sqm 0.0
Humidity
SR. ENGINEER
ORT
10TH MARCH
SUNDAY
1.0
1.0
4
Concrete Pump
Total Plant
Lifting Hoist
Vibrator
% Progress
T-12, 28th to 29th Floor Shuttering, 29 th Floor Slab
binding.
SR. ENGINEER