PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA Trench Exacavation

DRAWING NUMBER: len


DATE: 24/03/2023 Vertical on plan
SMM7 IN USE Grid line
SUBSTRUCTURE 1A - 2A 3400
Take Off List 2A - 3A 900
All Provisional 3A - 4A 1900
1. Clearing of site 4A - 5A 1100
2. Removal of tress 5A - 74 5900
3. Excavation of topsoil 7A - X1 1400
4. Disposal of excavated material 3B - 4B 2050
5. Excavation of Pits 7A1 - X1 1100
6. Disposal of excavated materials 7A2 - X1 1100
7. Excavation of trenches 7B1 - X2 2625
8. Disposal of excavated materials 4C - 7C 7750
9. Surface treatment 2D - 4D 4150
10. Blinding 1E - 2E 3400
11. Concrete 3F - 5F 4500
13. Formwork 5F - 6F 2575
14. Blockwork 6F - 7F 2575
15. Filling to excavation 7F - X2 2475
16. Filling to make up levels 1G - 2G 3550
17. Damp Proof Membrane 3G - 5G1 4050
18. Formwork 2H - 3H 1200
19. Concrete for floor bed 1I - 2I 3400
20. Rendering Length 61,100
21. Painting
Width 450
Depth 600

5H - 6H 2575
Site Clearance 6H - 7H 2575
2/ 36.54 Site preparation, clearing site vegetation 7H - X2 2925
19.42 1419.21 8075

Removal of tress Width 650


3 Site preparation, removing tress, girth 0.60- Depth 600
1.50m

Topsoil Excavation Horizontal on plan


2/ 36.54 Excavating topsoil for preservation A1 - B1 2775
19.42 1419.21 a.v. depth 0.15m B1 - E1 2550
& E1 - G1 1900
Disposal G1 - I1 3400
Disposal of exc. Material on site c x 0.15 E1a - G1a 2200
E2 - I1 6050
A3 - B3 2775
Pit Excavaation B3 - D3 2025
D3 - F3 1550
150mm F3 - H3 3950
A4 - D4 4650
F4a - G14a 3000
450 600mm F5 to H5 2975

150
200mm Trench Exacavation Cont;d
50mm A7 - H7 10225
A7X1 - A17X1 2675
B1X2 - FX2 4825
top of concrete to flr bed 600 57,525
Concret in fdn 200
Blinding 50 width 450
850 depth 600

Total length 57525


61,100
2/23/ 0.75 Excavating pits in 46nr max depth ≤ 1.0m 118,625
0.75
0.85 21.99 2/ 118.63 Excavating trenches, width >0.30m, max dep,
2/ 0.9 & 0.45 ≤ 1.00m
0.75 Filling to excavations average thickness > 0.60 64.06
0.85 1.15 0.25m with materialarising from 2/ 8.08 &
evcavation 0.60 Filling to excvn. a.b.d
0.60 5.82
69.88

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA Concrete in colomns cont'd
DRAWING NUMBER: Ddt
DATE: 24/03/2023 2/ 23/ 0.30 filling to exc. A.b.d
SMM7 IN USE 0.30 &
Surface Treatment 0.60 2.48 Add
2/ 23/ 0.75 Surface treatment applying herbecides Disposal a.b.d
0.75 25.88
2/ 118.63 Formwork for columns
0.45 106.77 & len
2/ 8.08 4/ 0.3
0.6 9.70 Surface treatment compacting btn. Of excvn. 300 1.2
2/ 0.9
0.75 1.35 300
143.69
Blinding Concrete 2/ 23/ 1.20 Formwork for in situ conc. In cols. Isoltd
2/23/ 0.75 In situ conc. (C15) in beds, th. ≤ 150 mm poured 1.05 57.96
0.75 on or against earth 2/ 1.50
0.05 1.29 & 1.05 3.15
2/ 0.9 Ddt 61.11
0.75 Filling to exc. a.b.d Reinforcement
0.05 0.07 & 2/ 230/ 0.85 391.00 M.S bars to BS 4449, nom. size 16mm, bent
1.36 Add 2/ 6/ 2.54 30.48
Disposal of excavated material off site 2/ 92/ 2.44 448.96
2/ 5/ 1.00 10.00
2/ 6/ 0.85 10.20
Concrete in column bases 890.64
2/ 23/ 0.75 In situ conc. (C25) in col. bases, rein.
0.75 & 2/184 1.10 404.80 Ditto, nom. size. 10mm, links
0.2 5.18 Ddt 2/ 8/ 1.40 22.40
2/ 0.9 Filling to excvn. A.b.d 427.20
0.75
0.2 0.27 Add Blockwall in foundation
5.45 Disposal a.b.d 150mm
450mm

450mm
Concrete in trench
150mm

Height
450
450
900
225 300 225
part of trench in pit 2/ 130.80 Solid sandcreteblkwrk. (1:6), th. 150mm,
54/ 0.225 0.90 235.44 bonded w.i. ct. s mortar (1:4), vertical
12.15
&
5/ 0.225 2/ 130.80 Ddt
1.125 0.45 Filling to exc. A.b.d
add 8.08 0.15 17.66 &
9.21 Add
Disposal a.b.d
total trench length 118.63
part of trench in pit 12.15
130.78 2/ 9.21 Ditto th. 225mm,
0.90 16.57
2/ 130.78 Plain in situ conc. (C25) in foundation poured &
0.45 on or against earth Ddt
0.15 17.66 2/ 9.21 Filling to exc. A.b.d
2/ 9.21 & 0.23 &
0.6 Ddt 0.45 1.91 Add
0.15 1.66 filling to exc. A.b.d Disposal a.b.d
19.31 &
Add Filling to make-up levels
Disposal a.b.d
B
Concrete in colomns
2/ 23/ 0.3 In situ conc. (C25) in cols. rein.
0.3 A
1.05 4.35
2/ 0.45
0.3
1.05 0.28 D C
4.63

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: Concrete in floor bed
DATE: 24/03/2023 2/ 17.10 In situ conc. (C25) in beds, th. ≤ 150
SMM7 IN USE 12.68
Filling to make-up levels cont'd 0.15 65.05
Filling to make up levels av. Th. > 0.25m with 2/ 4.15
laterite obtained offsite compacted in 0.15m 1.10
layers 0.15 1.37
2/ 17.10 (A 2/ 4.45
12.68 3.00
0.45 195.145 0.15 4.01
2/ 4.15 (B 70.42
1.10
0.45 4.11 2/ 4.45 Ddt
2/ 4.45 (C 0.75 Ditto
3.00 0.15 1.00
0.45 12.02
2/ 2.75 (D
1.48 Finishes
0.45 3.66 D
214.932 1475
1000
2/ 130.78 Ddt 1750
0.15 Ditto 4225
0.45 17.66 2/ 68.43 Rendering walls, external, width >300mm th.
2/ 6.05 0.60 82.12 Ct & S (1:4)
0.23 2/ 3.30 &
0.45 1.25 0.60 3.96 Painting. general surfaces 3 cts, girth > 300mm
2/ 23/ 0.3 2/ 5.70
0.3 0.60 6.84
0.45 1.86 92.92
20.77

Damp proof membrane


17.10 Damp proofing, width > 300mm on a level
12.68 433.66 ground
4.15
1.10 9.13
4.45
3.00 26.7
2.75
1.48 8.14
477.626

Formwork for bed


13775
4150
1100
1750
750
4500
750
6875
300
3925
3000
4450
3000
4000
17100
69,425

2/ 69.425 138.85 Formwork for edges of bed, plain vert, ht.


≤ 250mm

Reinforcement for bed


2/ 17.10 Steel fabric mesh to BS 4483, ref A393 (10mm .
2
12.68 433.656 dia At 250mm c/c and weighing 6.16kg/m ) and
2/ 4.15 fixing as described wi. 300mm min. side and
1.10 9.13 end laps
2/ 4.45
3.00 26.7
469.486
2/ 4.5 Ddt
0.75 6.75 Ditto

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA Beam Reinforcement
DRAWING NUMBER: 2/ 3/ 6.75 40.50 M.S bars to bs….. , 16mm dia. In first floor
DATE: 24/03/2023 2/ 3/ 5.85 35.10 beams
SMM7 IN USE 2/ 3/ 8.55 51.30
2/ 3/ 8.55 51.30
Superstructure 2/ 9/ 5.90 106.20
Take - off list 2/ 9/ 5.90 106.20
1. Columns 2/ 6/ 1.75 1.75
* Reinforcement 2/ 18/ 4.60 165.60
*concrete 2/ 3/ 7.87 47.22
*formwork 2/ 3/ 6.97 41.82
2/ 6/ 6.75 81.00
2. Beams 2/ 3/ 5.18 31.08
* Reinforcement 2/ 3/ 4.28 25.68
*concrete 2/ 6/ 8.60 103.20
*formwork 2/ 12/ 2.18 52.32
2/ 6/ 1.65 19.80
3. Slabs 2/ 3/ 6.73 40.38
* Reinforcement 2/ 3/ 5.83 34.98
*concrete 2/ 3/ 7.82 46.92
*formwork 2/ 3/ 7.82 46.92
2/ 9/ 6.86 123.48
4. Staircase 2/ 9/ 7.78 140.04
* Reinforcement 2/ 9/ 7.78 140.04
*concrete 2/ 9/ 6.85 123.30
*formwork 2/ 6/ 6.25 75.00
2/ 3/ 6.20 37.20
2/ 3/ 7.10 42.60
Columns 2/ 3/ 7.90 47.40
Reinforcement
2/ 3/ 7.00 42.00
Ground Floor 2/ 6/ 7.13 85.56
2/ 391/ 1.1 860.2 M.S bar 10mm dia. To BS 4449, links 2/ 6/ 4.28 51.36
2/ 6/ 5.25 63.00
2/ 92/ 3.98 732.32 Ditto, 16mm dia. Bent 2/ 3/ 6.20 37.20
2/ 3/ 7.10 42.60
First Floor 2/ 3/ 7.28 43.68
2/ 345/ 1.1 759 M.S bar 10mm dia. To BS 4449, links 2/ 3/ 6.38 38.28
2/ 6/ 3.35 40.20
2/ 92/ 3.15 579.6 Ditto, 16mm dia. Bent 2/ 6/ 1.10 13.20
1935.45
Column Formwork
len 2/ 383/ 0.95 Ditto, 10mm dia. for links
4/ 0.3
300 1.2 2/ 3/ 6.88 41.28 M.S bars to bs….. , 16mm dia. In lintel
2/ 3/ 7.78 46.68
300 2/ 3/ 7.78 46.68
2/ 3/ 6.85 41.10
GF ht FF ht 2/ 3/ 4.83 28.98
2475 2850 2/ 3/ 4.83 28.98
Add Kicker 75 75 2/ 3/ 8.40 50.40
2550 2925 2/ 3/ 8.40 50.40
2/ 3/ 5.43 32.58
2/ 23/ 2.55 sawn hdwd frmwrk to col. isltd. square in shape 2/ 3/ 5.43 32.58
1.2 140.76 (GF 2/ 3/ 3.63 21.78
2/ 23/ 2.93 2/ 3/ 3.63 21.78
1.2 161.46 (FF 2/ 3/ 2.76 16.56
2/ 3/ 2.76 16.56
2/ 3/ 1.58 9.48
Concrete in columns 2/ 3/ 1.58 9.48
In situ conc. (C30) to col. rein 2/ 3/ 4.28 25.68
2/ 23/ 0.3 2/ 3/ 4.28 25.68
0.3 2/ 3/ 6.25 37.50
2.55 10.56 (GF 2/ 3/ 6.25 37.50
2/ 23/ 0.3 2/ 3/ 6.88 41.28
0.3 2/ 3/ 7.78 46.68
2.93 12.1095 (FF 2/ 3/ 6.60 39.60
2/ 0.45 2/ 3/ 5.70 34.20
0.3 2/ 3/ 6.75 40.50
1.05 0.28 2/ 3/ 5.85 35.10
12.39 (GF 2/ 3/ 7.82 46.92
2/ 3/ 7.82 46.92
2/ 3/ 5.18 31.08
2/ 3/ 4.28 25.68
2/ 3/ 2.52 15.12
2/ 3/ 2.52 15.12
2/ 3/ 3.28 19.68
2/ 3/ 3.28 19.68

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA Concrete in Beams Cont'd
DRAWING NUMBER: GL/ 1,2,3,5&7
DATE: 24/03/2023 6,825
SMM7 IN USE 6,800
2/ 3/ 5.9 35.40 Beams Reinforcement cont'd Add 2/0.5/225 225
2/ 3/ 5.9 35.40 13,850
2/ 3/ 7.25 43.50
2/ 3/ 7.25 43.50 GL/4
2/ 3/ 2.75 16.50 6,150
2/ 3/ 2.75 16.50 Add 2/0.5/225 225
2/ 3/ 1.45 8.70 6,375
2/ 3/ 1.45 8.70
2/ 3/ 3.25 19.50 GL/6
2/ 3/ 3.25 19.50 4,175
2/ 3/ 4.37 26.22 Add 2/0.5/225 225
2/ 3/ 4.37 26.22 4,400
2/ 3/ 6.73 40.38
1
2/ 3/ 5.83 34.98 GL/5
1263.42 7,025
Add /0.5/225 113
7,138
2/ 317/ 0.5 317 Ditto, 10mm dia. for links
2/ 303/ 0.5 303 GL/61
5,150
Add 2/0.5/225 225
5,375
Concrete in Beams
GL/A-A GL/8
6,920 3,250
5,800 Add 2/0.5/225 225
12,720 3,475
Add 2/0.5/225 225
12,945 Total Length
12,945
GL/B-B 10,975
8,450 8,725
1,550 4,725
525 8,325
10,525 11,150
Add 4/0.5/225 450 2/5,800 11,600
10,975 8,750
2/4,650 9,300
GL/C-C 5/13,850 69,250
8,500.00 6,375
Add 2/0.5/225 225.00 4,400
8,725.00 7,138
5,375
GL/D-D 3,475
1,850 182,508
Add 2,650
2/0.5/225 225 4,500 Concrete in Beams Cont'd
4,725 Roof Beams
12,275
GL/E 19,100
525 5,830
1,550 1,550
1,650 2/5,300 10,600
4,150 5,225
450 3,570
8,325 6,805
64,955
GL/F
4230 2/ 182.51 Insitu Conc. C30. in attchd beams, rein.
6920 0.23
11150 0.30 25.19 (GF

GL/G&I 2/ 64.96 Ditto. to beams in roof


5800 0.23
0.30 8.96 (FF
GL/H
1650
6650
450
8750

GL/G1&H1
4650

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA Beam Formwork
DRAWING NUMBER:
DATE: 24/03/2023
SMM7 IN USE
450
Concrete in Lintel Beams 300 300
1
GL/A GL/A
4230 2420 225 225
6920
5800 450 2/ 300 600
Add 2/ 0.5/ 150 150 150 225 225
17100 2570 300
975 825
GL/B GL/C
2650 3175 L beams Total beam Length
Add 2/ 0.5/ 150 150 150 12,720 182,508
2800 3325 2/13,850 27,700 less 46,220
5,800 136,288
GL/D GL/E 46,220
4270 5800
Add 2/ 0.5/ 150 150 150 Sn. Hrdwd formwork to beam, attchd to slab
4420 5950 2/ 46.22
0.98 90.13 (FF beam
GL/F GL/G 2/ 136.29
6650 3175 0.83 224.87 (FF beam
1350 3130 2/ 64.96
300 300 0.98 126.66 (roof beam
8300 6605 441.67

GL/H GL/I 2/ 2/ 65.17 260.68 Ditto, attchd to walls


02/3,325 6650 7150 2/ 2/ 63.90 255.60
Add 2/ 0.5/ 150 150 150 516.28
6800 7300 Slab
Reinforcement
A
GL/1 GL/1 2/ 39/ 7.93 618.54 M.S bars to bs….. , 16mm dia. in sus. Slab
6,825 4,725 2/ 39/ 7.90 616.20
6,800 150 2/ 91/ 6.90 1255.80
150 2/ 4/ 5.60 44.80
13,775 4,875 2/ 30/ 8.05 483.00
2/ 9/ 5.60 100.80
A
GL/3 GL/3 2/ 28/ 5.45 272.50
8,300 5,325 2/ 35/ 5.25 367.50
150 3,525 2/ 28/ 4.43 247.80
300 2/ 9/ 2.75 49.50
8,450 9,150 2/ 11/ 8.35 183.70
2/ 14/ 4.70 131.60
GL/4 GL/5 2/ 9/ 4.43 79.65
2,625 1,475 2/ 9/ 6.25 112.50
150 4,175 2/ 11/ 2.30 50.60
300 2/ 7/ 3.98 55.65
2,775 5,950 2/ 27/ 2.50 135.00
2/ 13/ 7.33 190.58
GL/6 GL/7 2/ 13/ 7.97 207.22
6,150 6,825 2/ 35/ 8.02 561.40
150 5,800 2/ 30/ 7.25 435.00
6,300 12,625 6199.34

Concrete in Lintel Beams Cont'd Concrete in slab


Total Length len Width
17,100 13,775 A-I/ 1-3 13,775 4,150
2,570 4,875 225 1,650
2,800 8,450 14,000 add 5,800
3,325 9,150 0.5/ 225 113
4,420 5,950 5,913
5,950 2,775 6,150
8,300 6,300 6,950 1,850
6,605 12,625 13,100 2,650
6,800 225 4,500
7,300 13,325
65,170 0 63,900
6,325 2,955
2/ 129.07 Insitu Conc. C30. in beams, attchd to walls, 6,125 2,420
0.15 rein. lintels 12,450 5,375
0.15 5.81 (FF 225
12,675

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: 2/ 2/ 2.20
DATE: 24/03/2023 1.20
SMM7 IN USE 0.15 1.58 (waist
Concrete in slab Cont'd 2.77
3,300 add 1,500 2/ 2/ 1.20
250 0.5/ 225 113 0.30
3,550 1,613 0.23 0.33 (landing beam

Total len. Total wid. Formwork


14,000 5,913 2/ 1.20 Sn. frmwk to soff. Of landing slab. th < 200m
13,325 4,500 1.10 2.64 ht-soff < 1.50m
12,675 5,375
3,550 1,613 2/ 2.20 4.40 Sn. frmwk to stair flight, 2.2m long, 1.2m wide, 150mm
43,550 17,401 2/ 2.20 4.40 riser, 275mm treads
8.80
Roof Slab
len wid. 2/ 2/ 1.20 Sn. Hrdwd formwork to landing beam
12,275 750 0.83 3.96
19,100
5,830 3,570 Reinforcement
1,550 9/ 2.50 22.50 M.S bars to BS4449, 12mm dia. in staircase, bent.
4,570 9/ 2.88 25.92
5,225 9/ 3.10 27.90
6,805 9/ 2.60 23.40
750 9/ 2.30 20.70
56,105 9/ 2.75 24.75
145.17
5,325
53/ 1.20 63.60 Diito, straight
2/ 43.55 Insitu conc. C30 in slabs, th. ≤ 150mm, reinfd.
17.40
0.15 227.34
2/ 182.51 Ddt
0.23
0.3 25.19 (beams
202.16 (sus. slab

2/ 56.105 Ditto, in roof slab


0.75
0.15 12.62
2/ 5.33
3.57
0.15 5.70
18.33

Formwork for slab


2/ 43.55 Sn. frmwrk to soff. of slab
17.40 1515.63 (sus. slab
2/ 56.105
0.75 84.16
2/ 0.15
5.33 1.60
85.755 (roof. slab

Concrete In Staircase
Landing
len width
1.20 1.10

Flight
len width
2.20 1.20

275

150
1
2/16//
2
1.20 Insitu conc. (C20) in staircase reind.
0.28
0.15 0.79 (steps
2/ 1.20
1.10
0.15 0.40 (landing

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: Door frames
DATE: 24/03/2023 Door frame, jamb, wrot hardwood 50 x 150 mm
SMM7 IN USE plugged and screwed to blkwk
Take - off list 2/ 7/ 2/ 2.10 58.80 (GF
1. Doors 2/ 5/ 2/ 2.10 42.00 (FF
2. Window & window frame
3. Ironmongery 2/ 7/ 0.75 10.50 Ditto, hds. Do (GF
4 Adjustsment for openings 2/ 5/ 0.75 7.50 (FF

Doors Painting to Door Frame


hd 750
add jamb 2/2,100 4200
4950
2100
hd 900
add 2/2,100 4200
750 5100

Doors, single, as dimsd. dia. D1, wooden flush Prime only wood, gen surfs girth ≤300 mm before fixg
door wi. wooden architrave 2/ 7/ 4.95 69.30
2/ 2 4 (GF 2/ 5/ 5.10 51.00
2/ 3 6 (FF

Ditto, D2. do Window & window frame

2100

750

900
2/ 5 10 (GF
2/ 2 4 (FF 750

Doors, double security door with architrave, D3 wdw & wdw fr. as dimsd diag. W1 single bay
alu. Exterior wdw. 750x750, high level wdw
2/ 3 6 (GF
2/ 3 6 (FF
2550
2/ 3 6 Ditto, w2 single bay, do. Exterior wdw. 1 wide
x 2 high. 3888, 36" x 68"

1200
2/ 1 2 (GF
2/ 1 2 (FF (FF

2/ 1 2 Door, one & half security, sliding glass door D4


2200
2/ 2 4 Ditto, D5. double. do (FF

Ironmongery
Supply and fix the following 500
Mortice locks,s &ets lever furn., brass, to hwd
2/ 5 10 (GF
2/ 2 4 (FF Diito W3, single bay alu. Exterior wdw. 1 wide x 2 high
3888: single bay
Door chain, brass to hwd 2/ 5 10 (GF
2/ 5 10 (GF 2/ 4 8 (FF
2/ 2 4 (FF

butt hinges, brass, to hwd. 2/ 2 4 Ditto, 750 x 5700 W4. FF


1
2/ 5/ 12 15 (GF
2/ 2/ 11 6 (FF
2
2/ 1 2 Ditto, W5. GF

Ditto W6, alu. Exterior. 3 wide. 3888: 3m, 3 bags


Painting to Doors 2/ 6 12 (GF
Clear finish, wd, prep & 2 cts polyurethane 2/ 2 4 (FF
vanish D1, D2 > 300 mm 2200
2/ 2/ 2.10
0.75 6.3 (GF
2/ 3/ 2.10
0.75 9.45 (FF
2.10
0.90 1.89 2500

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER:
DATE: 24/03/2023
SMM7 IN USE
Adjustment of openings
Ground floor
Ddt
Ddt blkwk, 150 th., laid vert. in ct. & sd m(1:4)
in stretcher bond
&
render, 13th ct. & sd m(1:4) a. b.
&
paintg to gen surfs, rendered, gth 300mm &
3 cts emuls
2/ 0.75
2.10 3.15 (D1
2/ 2/ 2/ 0.90
2.10 15.12 (D2
2/ 1.20
2.55 6.12 (D3
2/ 2/ 2.85
2.55 29.07 (D5
2/ 3/ 0.75
0.75 3.38 (W1
2/ 5/ 0.75
2.20 16.50 (W3
2/ 2/ 0.75
5.70 17.10 (W4
2/ 1.10
2.20 4.84 (W5
2/ 6/ 2.50
2.20 66.00 (W6
2/ 3.93
2.55 20.04 (Garage opening
181.32

First floor
Ddt
Ddt blkwk, 150 th., laid vert. in ct. & sd m(1:4)
in stretcher bond
&
render, 13th ct. & sd m(1:4) a. b.
&
paintg to gen surfs, rendered, gth 300mm &
3 cts emuls
2/ 3/ 0.75
2.10 9.45 (D1
2/ 3/ 0.90
2.10 11.34 (D2
2/ 1.20
2.55 6.12 (D3
2/ 2/ 1.20
2.55 12.24 (D4
2/ 2.85
2.55 14.54 (D5
2/ 3/ 0.75
0.75 3.38 (W1
2/3/ 0.50
2.20 6.60 (W2
2/ 4/ 0.75
2.20 13.20 (W3
2/ 2/ 0.75
5.70 17.10 (W4
2/ 1.10
2.20 4.84 (W5
2/ 2/ 2.50
2.20 22.00 (W6
120.80

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: Channels
DATE: 24/03/2023 11,401
SMM7 IN USE less bellmth 3,000
External Works softlandscape 1,380
Take-off list 7,021
1. Hard Landscape
*paving 7,336
2. Channels less bellmth 3,000
3. Grassed area 4,336
4. Shrubs
5. Fencing 30,454
less 11,401
11,061
Hard Landscape Access road 4,500
len wid 3,492
36,537 30,480
less 2,224 11,061 36,537
7,336 1,380 less 7,336
26,978 18,039 2,224
26,978
7,350 4,150
30,480
2/ 26.98 Exc. Topsoil for presevern a.v d.p 225 less 11,061
18.04 973.29 1,380
2/ 7.35 Surf. Trmt. Compacting btms of excvns 18,039
4.15 61.01
3
2/ 2/ / 3.00 33,888
14
3.00 7.71 less 4,340
1042.01 550
Ddt 28,998
2/ 17.10
12.68 433.66 (area of building 2/ 7.02 14.04 precast conc. Chan. 254 x 127 wi. Gravel agg. to
2/ 4.15 2/ 2/ 4.34 17.34 BS340, b&j c/s mortar (1:2) on insitu conc. Fdn.
1.1 9.13 2/ 3.49 6.98 (1:3:6/ 20 agg)
2/ 4.45 2/ 26.98 53.96 &
3.00 26.70 2/ 18.04 36.08 Exc. Topsl .a.b.d
2
469.49 2/ 29.00 58.00 186.40 x 0.25 = 46.60 m
186.40 &
Compacting btms of excvns .a.b.d
2/ 26.98 Fillg. To make up levs. Av. th.≤ 0.2m arisg 186.40 x 0.25 = 46.60 m2
18.04 from excvns; topsl
0.10 97.33
22
2/ 7.35 /2/2/ /
7
2.87 18.04 Ditto, curved to 3.00m int. rad., do
4.15 &
0.10 6.10 Exc. Topsl .a.b.d
3
2/ 2/ / 3.00 x 0.25 =
14
3.00 &
0.10 0.77 Compacting btms of excvns .a.b.d
104.21 x 0.25 =

2/ 26.98 Fillg to make up levs. av. th. ≤ 0.25m, hardcore Softlandscape


18.04 consistg. of gravel rejects obtaind from on site len wid
0.15 146.00 sp. hps. 2/4,336 8,672 7,021
2/ 7.35 26,978 18,039
4.15 28,998 11,401
0.15 9.15 3,489
3
2/ 2/ / 3.00 64,648 39,950
14
3.00
0.15 1.16 Seed'g/ turfing
156.31 2/ 64.65 Cultivatg. Soil 100mm dp by hand or pedestrian
39.95 5165.38 operated machince; surfs. O grd,. 100 dp; evenly
graded to fdn. Levs to a fine tilth: weeding
26.98 Compactg. fillig; blindg. w. hoggin &
18.04 & Surface Applications
7.35 precast conc. Paving slabs 50th wi. gravel agg Fertilizg. gen. surfs. Of cultivated (m/s) wi. Approved
4.15 to BS 368, 600 X 600 & 450 X 600 in size, ld to grassing fertilizer, basic price GHC 63.00 at a rate of
3 2
2/ 2/ / 3.00 bkg. wi. 150 lap & grtd in c.m (1:4) on wet scrd 205kg/m
14
3.00 bed of l.m (1:6) 25th on quarry dust (m/s), ld &
to falls & cross falls % slopes 15° from horz. Seeding
Seedg. Cultivated soil (m/s) in 2nr operations, wi.
approved grass seed, basic price GHC 80.00/ kg at a
2
rate of 25g/m

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: Drainage works Cont'd
DATE: 24/03/2023 IC 5-6
SMM7 IN USE 8,750
External Works cont'd /450
less 2/ 450
Maintenance 8,300
Item Maintenance of lawn and grassed areas, less wall 2/ 150 300
including. weedg.mulchg., removal of unwanted 8,000
grass & watering for 6mths. till grass stabilizes
IC 6-7
Shrubs 6,400
2/ 4/ 1 8 Shrubs to BS 3936, pt. 1; Berberis Darwinii, ht. /450
less 2/ 450
550; balled fibrous rt. System; excvtg. Pit 5,950
450x450x450 dp; breakg. Up btm; refillg. W. less wall 2/ 150 300
excvtd. topsl. Mxd. w. 20% apprvd. compost; 5,650
removg. Surplus excvtd. mat. & waterg. as specfd
Average Depths
Fencing IC 1-2
30,480 GL 13,695 13,000
36,337 Less IL 12,880 12,200
33,888 815 800
30,454 Add channel 3 3
131,159 818 803
less gate space 4,500 818
126,659 1621 / 2
810.5

2/ 126.66 253.32 Fencg; blkwll ld. Vert. in stretcher bond, 2.50m hi. IC 3-4
wi. 0.15 x 0.15 x 2.54 & 0.45 x 0.45 x 2.54 inter 13,250 12,450
cols @ 3.00m c/c & embedded 650mm into the 12,188 11,910
grd leaving 2.15m above g.l 1,062 540
Add channel 3 3
Gate 1,065 543
2/ 1 2 Gate (1nr) wi. Coated ornamental to BS 4092 1,065
4.50 X 900 O/A to cat. Ref 'X' of manufacturer 1,608 /2
A' inc. all assctd fittings 804

2/ 4.50 Paintg. Gates, met. Ext., ornamental type, gth IC 5-6


0.90 8.1 > 300mm prep. & apply 3cts. Of oil paint. 12,305 12,195
Less IL 11,810 11,680
495 515
Drainage works Add channel 3 3
1. Main Drains 498 518
2. Excavations 498
3. Connection & Gullies 1,016 /2
4. Inspection Chambers 508
5. Testing
IC 6-7
Main Drains 12,195 12,050
IC 1- 2 11,680 11,415
Len 515 635
9,727 Add channel 3 3
/450
less 2/ 450 518 638
pipe 9,277 518
less wall 2/ 150 300 1,156 /2
trench 8,977 578

IC 2-3 IC 2-3 IC 4-5


6,150 803 543
/450
less 2/ 450 1,065 498
pipe 5,700 1,868 /2 1,041 /2
less wall 2/ 150 300 934 520.5
trench 5,400
Branches
IC 3-4 soil pipes
4,750 len
/450
less 2/ 450 Guestroom wash - IC 3 2150
pipe 4,300 Visitor's WC - IC 6 3200
less wall 2/ 150 300 Down pipes 2/3,000 6000
trench 4,000 11350

IC 4-5 Waste water pipe


5,475 kitchen - MH 1 450
/450
less 2/ 450 Guestroom wash - main pipe 2/ 450 900
pipe 5,025 Visitor's WC - MH 5 4259
less wall 2/ 150 300 5609
trench 4,725

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: Septic Tank
DATE: 24/03/2023 Exc. For septic tank, max. dp. 2.00 -4.00m
SMM7 IN USE 2/ 4.15
1.20
Soil Pipe 1.80 17.93
Exc. Tr. for pipes ≤ 200mm, nom size. av. dep. 2/ 2.55
of tr. ≤ 1.00m 1.15
2/ 8.98 17.95 (IC 1-2 2.50 14.66
2/ 5.40 10.80 (IC 2-3 2/ 1.35
2/ 4.00 8.00 (IC 3-4 1.20
2/ 4.73 9.45 (IC 4-5 2.28 7.39
2/ 8.00 16.00 (IC 5-6 2/ 1.30
2/ 5.65 11.30 (IC 6-7 1.18
2/ 5.35 10.70 (branches 1.60 4.91
84.20
Concrete
Pipes in tr. 100mm nom size pvc to BS…. wi. S.j Plain insitu con. 1:2:4/20agg as des. In base
2/ 9.28 18.55 (IC 1-2 2/ 2.60
2/ 5.70 11.40 (IC 2-3 1.20
2/ 4.30 8.60 (IC 3-4 0.15 0.94
2/ 5.03 10.05 (IC 4-5 2/ 2.55
2/ 8.30 16.6 (IC 5-6 1.15
2/ 5.95 11.9 (IC 6-7 0.15 0.88
2/ 11.35 22.70 (branches 2/ 1.35
99.80 1.20
0.15 0.49
Waste Water Pipe 2/ 1.30
Exc. Tr. for pipes ≤ 200mm, nom size. av. dep. 1.18
of tr. ≤ 1.00m 0.15 0.46
2/ 5.20 10.40 (IC 1-2 Ditto, in sus. Slab
2/ 6.10 12.20 (IC 2-3 2/ 3.20
2/ 4.00 8.00 (IC 3-4 1.35
2/ 4.73 9.45 (IC 4-5 0.15
2/ 8.00 16.00 (IC 5-6
2/ 5.65 11.30 (IC 6-7 Precast conc. Access cover 600x600x150dp.
2/ 5.61 11.22 (Branches Rebate 12mm diatemer rfd in 150 centers arranged
78.57 both ways wi 300mm girth liftng hook.

Pipes in tr. 50mm nom size pvc to BS…. wi. S.j 2/ 3.00 6.00
2/ 7.56 15.12 (IC 1-2
2/ 5.70 11.40 (IC 2-3 2/ 1.00 2.00 Ditto
2/ 5.80 11.60 (IC 3-4
2/ 5.03 10.05 (IC 4-5
2/ 8.30 16.60 (IC 5-6
2/ 7.23 14.46 (IC 6-7
2/ 5.61 11.22 (Branches Reinforcement
90.45 MS bars 12mmɸ in sus. Slab
2/ 29/ 3.20 185.60
2/ 15/ 1.35 78.30
263.90
Gullies & Connections
2/ 3/ 1 5 Pipe accessories: gully, Pvc trapped to BS 100
bm. wk inlet 6 150x150sg grtg Formwork
Swn frmwk to soffit of sus. Slab
2/ 3 6 E.O. 100mm Pvc pipe for bend 2/ 3.20
(gullies 1.35 8.64
2/ 3.20 Ditto, edges
0.15 0.96
Inspection Chambers 2/ 1.35
The ff in 7nr Inspection Chambers 0.15 0.41
2/ 7 14 IC, max internal size 900x570 mm, dep. 1.37
to invrt 750 – 1000mm, constructed wi 215mm
th. conc base (C20/18)150 s/s blk ld in strtchr.
bond in ct. & sd m(1;4), 100 mm dia curved
main chann 900mm long wi 2 nr three-quarter
section branch bends, precast conc cover slab
1330 x 1000 x 100 mm th. reinfd wi steel fabric
to BS 4483 ref A142 wi rebated opening
600 x 450 mm finished smooth and setting in
cement mortar (1:3)

2/ 6 12 Dito, 450x450mm for waste water

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER:
DATE: 24/03/2023
SMM7 IN USE

Blockwork
Ground Floor
Gridline Len
F/ 5-7 6,875
7/ A-F 8,300
5/ F-H 3,925
A/ 1-7 16,950
1/ A-I 13,625
I/ 1-2 4,150
2/ D-1 7,475
H/ 2-3 1,650
E/ 1-2, G/1-2 2/4,000 8,000
1/2/ E-G 2,500
H/ 3-5 4,350
3/ F-H 4,175
D/ 2-4/5 5,400
F/ 3-4/5 4,350
4/5/ F-H 3,300
3/ A-D, 4/A-D 2/ 6,000 12,000
B/ 3-4 3,575
C/ 5-6 900
C/ 6-7 1,200
112,700

H/ 5-7 6,875

First Floor
Gridline Len
7/ A-I 12,675
A/ 1-7 16,800
1/ A-I 13,650
I/ 1-3/4 7,038
G/ 3-4/5 3,150
H/ 5-7 6,500
5/ G-H/I 3,025
3/4/ F-I 5,325
F/ 5-6/7 5,050
3/ B-G 4,777
E/ 1-3 5,650
B/C/ 1-2, G/ 1-2 2/ 2,950 5,900
1/2/ B-G 4,800
3/ A-B/C 4,525
3/4/ A-B 3,325
F/ 3-4 1,350
B/ 3-4 2,500
4/ B-D 2,525
D/ 4-5/6 4,420
5/6/ A-D 6,150
5/ A-B 625
A/B/ 5-6 2,270
122,030

150mm th. solid sandcrete blockwall ld. vert. in


2/ 112.7 c/s mortar in stretcher bond.
2.55 574.77 (GF
2/ 122.03
2.93 715.10 (FF

2/ 6.88 Ditto, 300mm th. Blocks


2.55 35.06 (GF

Adjustments of Openings
Ddt
181.32 Ground floor openings a.b.d

120.8 First Floor openings a.b.d

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: Electrical Works Cont'd
DATE: 24/03/2023 Accessories
SMM7 IN USE 2/ 2 4 Corridor
Electrical Works 2/ 4 8 Study
Take off list 2/ 2 4 Dinning
Electrical Supply/ Power & Lighting 2/ 4 8 Living Room
1. Power Installations 2/ 4 8 Bedroom1
2. Lighting Installation & Accessories 2/ 6 12 Master Suite
3. Luminairaires 2/ 2 4 Master Suite Terrace
4. Lambs 2/ 2 4 Balcony
Ventilation/ Air Conditioning Systems 2/ 4 8 Bedroom 2
5. Air Conditioning 2/ 6 12 Family Area
6. Ceiling Fan 2/ 2 4 Utility
Communication/ Security/ Control Systems 88
7. Telephones
8. Tv's Ditto, single SSO, a.b.d
2/ 2 4 washhroom
2/ 2 4 washroom1
2/ 2 4 washroom2
Description of works 2/ 2 4 washroom3
ITEM The work comprise complete installation of
electricity to 2nr 4-bedroom residence 2 2 45A coker control unit

Regulation/ Rules
ITEM Measurement shall be done in accordance wi. Sundries
IEE and ECG markg. the pos'n of hole % chases in the structure for
power installation
Main Supply
240v, 50Hz poweer will be tapped from3 phase
mains in front of the building Testing & Commision
Testg & comm. The power as described in specf;n
Distribution Board
D.B 6 way TPN, D/BC/W distribution, wi. five
10A , five 20A, seven 32A and one 45 mcb, plugd
and screwed to masonary Lighting Installation
Cable & conduits in final circ, main circ. 1.5mm2,
Cables and Conduits copper cable installed, drawn into 12mm/50mm PVC
Len pipe embedded in masonary & fxd to tbr. wi clips in
3075 circ. no.
8375 1 1.00 GF L4 consiting, 12nr lightg pts, 4nr 2gand 2 way &
3325 2nr 2gand 1 way
300
300 1 1 Ditto, GF L5, 14nr light pts, 4nr 1gang 1 way,
meter 2100 4nr 2 gang 2 way switch
17475
1 1 Diito, GF-L4, 4nr light pts, 2nr 1gang 1 way
2
2/ 17.48 34.95 Copper cables, not in final circ. 16mm , Pvc
insul.drawn in pvc conduit 1 1 Ditto GF-L3, 18nr lighting pts. 4nr 1 gang 1 way, 2nr
& 2gang 1way
Conduit, not in final circuit, str, PVC. 12mm
embedded in masonary, in chases 1 1 Ditto, GF-L2, 14nr lighting pts, 4nr 1 way 1 gang

Power Installations 1 1 Ditto, GF-L1, 18nr lighting pts, 4nr 2gang 1 way
Single SSO
Cables & conduit in final circuits, 2.5mm2 1 1 Ditto, FF-L4, 16nr lighting pts, 4nr 2gang 2way, 8nr
copper cable drawn into 50mm dia./ 12mm dia. 1gang 1 way
PVC conduit embedded in masonary in
2/ 1 2 GF-P2, Consisting 2nr 13A 1 1 Ditto, FF-L3, 16nr lightg pts. 4nr 2gang 2way & 4nr
2/ 1 2 Ditto , FF-P2, 4nr 1gang 1 way
2/ 1 2 Ditto, FF-P1, 2nr
1 1 Ditto, FF-L2, 16n, lightg pts. 4nr 2gang 1way & 4nr
Double SSO 2gang 2way
Cables & conduit in final circuits, 2.5mm2
copper cable drawn into 50mm dia./ 12mm dia. 1 1 Ditto, ff-L1, 16nr lightg. Pts, 2nr 3gang 1 way, 2nr
PVC conduit embedded in masonary in 2 gang 1way
GF-P1, Consisting 16nr 13A SSO
2/ 1 2 Ditto, GF-P2, 8nr
2/ 1 2 Ditto , FF-P2, 12nr Accessories
2/ 1 2 Ditto, FF-P1, 14nr 26 26 Light switch, 13A 1 gang 1 way, white plastic plate stl.
K.O box plugd & scrwd to masonary
Accessories
Socket outlet, 13A 3pin flush, white plastic 14 Ditto, 2 gang 1 way
DSSO, stl. K.O box, plugd & scrd to masonanory
4 4 Guest Bedroom 20 Ditto, 2 gang 2 way
6 6 Kitchen
2 2 Kitchen Terrace 2 Ditto, 3 gang 1 way

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: Lighting Protection
DATE: 24/03/2023
SMM7 IN USE 75
Lighting Installation Cont'd 2475
Accessories 350
10 10 1.4 m dia. Sweeping ceiling fan 2850
300
20 20 Fan regulator 6050
add roof 1400
Sundries 7450
Markg. the pos'n of hole % chases in the struct.
for power installation Supply and Install the ff
7.45 7.45 25mm X 3mm copper tape as vest & horz. Condductors
Testing & Commissioning fxd to the surf of wall wi. Clips (m/s)
Testg & comm. The power as described in specf'n
2/ 1 2 clips for securing tape c/w screws

Luminaires 2/ 1 2 15mm X 0.6mm lg copper elevation rod c/w multiple pt


135 135 Luminaires, 18W LED 230v circ. Energy savg light & flat saddle base
fxd to wall surface
1 1 25mm screw down test clamp
12 12 25
surface Copper earth mat, 32mm dia. As spec'd

Sundries End of supply and fix


ITEM Marking posn of holes & chases for light inst.

Testing & Commissioning


ITEM Testg & comm. The power as described in specf'n

Sundries
ITEM Preparing drawgs, copies of as fitted prints
showing circ. runs & hand to maintenance eng.

End of electrical works

Ventilation/ Air Conditioning


10/ 1 10 Dust resistant paint finish and glaze coating
1400mm Sweep ceiling fan, high-speed motor
of 280rpr, lightweight with wide blades sowatts
with regulator, fixed to tor

2/ 9/ 1 18 Air conditioning equipment, 2.5HP R32 AC, 660


x 770 x 430mm. wall mounted, comprisg. of
indoor and outdoor units, condensate &
refrigerant pipe remote controls, Sur 20A switch
points in18nr 20A switch pts final circuit.

Accessories
30A AC switch outlet.

End of Ventilation/ Air Conditioning systems

2/ 1 2 Communication/ Security Control Systems


Comm. Inst. consistg of coaxial cable access
drawn into rigid 12mm dia. PVC conduit
embedded in masonary

2/ 1 2 Ditto, data access

Accessories
12 12 13A coaxial cable access

4 4 13A data access

Earthing Protection
2/ 2 4 600x600mm chamber for earthing system wi.
1.2m rod pressed to 50mm down. backfill
600mm and expose 100mm for testing

2/ 1 2 25MM BARE STRANDED COPPER CABLE, SUB


MAIN EARTHING RING IN FOUNDATION

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: Branches Cont'd
DATE: 24/03/2023 Guest washroom
SMM7 IN USE Wash Basin
PLUMBING INSTALLATIONS 1150
1. Connection to main 600
2. Cold water supply 150
3. Sanitary Appliance 1200
4. Waste pipe 3100
5. Pipe Fittings
6. Pipe work Ancillary 2/ 3.10 6.20 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol.
7. Sundries Jt. in chases
8. Testing & Commissioning
2/ 5.00 10.00 E.O . PVC. Pipe, nom size, 12 for bend
Ground Floor
Connection to main 2/ 1.00 2.00 E.o. pvc pipe nom size 12 for spec conn to pillar
Allow a prov. Sum of GHC 500.00 for conn. to tap (m/s) inc bent connector & comp. jt
mains in rd. & bringg. 18PVC serv. up to bonndg
of site . Includg provsn of stop value & box by 2/ 1.00 2.00 E.O . PVC. Pipe, nom size, 18 for bend
GWCL (reducing bend

Cold Water Supply 2/ 1.00 2.00 E.O . PVC. Pipe, nom size, 12 for fitting in 4nr ends
E.O PVC, nom size 18, for special conn. S.J to xtg
fitting 2/ 1.00 2.00 Cut circ. hole thro. 150th. bk. wall for pipe ≤ 55>Ø
len
2/ 15,900 31800
1175 Bath
4150 len
6800 4150/2
43925 2075

2/ 43.93 87.85 Pipes, St. nom size 18 PVC to BS …. wi. Solvent 2/ 2.08 4.15 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol.
joint. In trs Jt. in chases
&
Exc. Tr. For Serv. Nom size ≤ 200 av. dp 2/ 1.00 2.00 E.O . PVC. Pipe, nom size, 12 for bend
500-750
2/ 1.00 2.00 Pipewkancillary: stop valve, size 12, brass h. p. scrdn.
2/ 3/ 1 6 E.O PVC pipe, nom size 18 for bend Type to BS 1010 wi 2nr comp. jts . to cop. Pipe.

WC
Branches len
Visitors WC 1150
Tr. - flr 600 75
wall th. 150 1225
Flr - Wc 1200
1950 2/ 1.23 2.45 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol.
Jt. in chases
2/ 1 2 E.O PVC pipes, 18 dia. In 3 nr ends
(unequal tee 2/ 1.00 2.00 E.O . PVC. Pipe, nom size, 12 for bend

2/ 1.95 3.9 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol. 2/ 1.00 2.00 E.o. pvc pipe, nom size 12 for spec conn to cistn,
Jt. in chases inc bent connectoot & comp. jt

2/ 5 10 E.O . PVC. Pipe, nom size, 12 for bend


Kitchen sink
2/ 1 2 E.o. pvc pipe, nom size 12 for spec conn to cistn, len
inc bent connectoot & comp. jt 2536
less 2075
2/ 1 2 Cut circ. hole thro. 150th. bk. wall for pipe ≤ 55>Ø 461

2/ 0.46 0.92 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol.
Wash Basin Jt. in chases
len
2500/2 2/ 2.00 4.00 E.O . PVC. Pipe, nom size, 12 for bend
1200
2/ 1.00 2.00 E.O . PVC. Pipe, nom size, 12 for tee
2/ 1.2 2.4 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol.
Jt. in chases 2/ 1.00 2.00 Pipewk ancillary: pillar tap, nom size 12, chrom & platd,
easy cln patt., high necked to BS 1010 indexed COLD
2/ 2 4 E.O . PVC. Pipe, nom size, 12 for bend inc. strt tap conn. & comp. jt. to pvc pipe.

2/ 1.00 2.00 Pipewkancillary: stop valve, size 12, brass h. p. scrdn.


2/ 1 2 E.o. pvc pipe nom size 12 for spec conn to pillar Type to BS 1010 wi 2nr comp. jts . to cop. Pipe.
tap (m/s) inc bent connector & comp. jt

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: Foul Pipe Above ground
DATE: 24/03/2023 2/ 3.50 7.00 Pipes. Stnom size 100, pvc fxd fxd to drain
SMM7 IN USE
PLUMBING INSTALLATIONS CONT'D 2/ 3.50 7.00 pipes, st. nom size 50mm, pvc fxd to drain
Dish Washer
len
2850 Sundries
add 475 Markg the posn for holes in the struct. For the cold
3325 water supply & foul drainage above gro. serv.
less 475
2850 Testing & Commisioning
Allow for air testg. & commsng the cold water supply &
2/ 2.85 5.7 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol. foul drainage above grd. servs
Jt. in chases

2/ 2 4 E.O . PVC. Pipe, nom size, 12 for bend First Floor


Cold Water Supply
E.O. pvc pipe nom size 12 for spec conn to dish 2/ 1.00 2.00 E.O PVC, nom size 18, for special conn. S.J to xtg
washer (m/s) inc bent connector & comp. jt fitting

2/ 3.45 6.90 Pipes st. nom size 128 PVC & fxg to BS….wi. Sol.
Sanitary Appliances Jt. in duct
Supply, assembly and fix the ff. san. Appliances
(jts to pipes m/s) 2/ 1.00 2.00 E.O . PVC. Pipe, nom size, 18 dia. for fitting in 2nr ends
sink (reducing bend
Combined drainer & bowl, stainless stl. Drainer
1067 x 467 & rect bowl 457 x 343 x 178 dp., wi.
waste fittg. Chain, stay & plug & fxg. to sink Master Bedroom
unit (M/S) Bath
700
Bath flr - bath 400
2/ 1 2 Bath, porcelain enam. cast iron 1700lg to 1100
BS1189 wi 2nr. chr. Pltd. pillar taps, waste fittg,
chain, stay & plug. 2/ 1.10 2.20 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol.
Jt. in chases
Wash Basin
2/ 2 4 White glazed vitreous china wash basins size 2/ 2.00 4.00 E.O . PVC. Pipe, nom size, 12 for bend
460 × 405 mm with a pair of chromium-plated
pillar taps. waste fitting, plug and chain and ped. 2/ 1.00 2.00 E.O . PVC. Pipe, nom size, 12 for tee
including plugging and screwing brackets to
masonry and bedding pedestal to floor and basin 2/ 1.00 2.00 Pipewkancillary: stop valve, size 12, brass h. p. scrdn.
in mastic. Type to BS 1010 wi 2nr comp. jts . to cop. Pipe.

WC
2/ 2 4 WC. suite, Low lev. wi. vit. ped, able plastic ring WC
seat, 9 litre glzd. M.s. concld bkts., enam. Flush len
pipe, inc. scrg to conc., jtg outlet to PVC dischge 1475
pipe (m/s) P & s cistn. bKts. to masonry & jtg. 1175
Fl. Pipe to cist. & arm of ped. 2650
flr-wc 800
Dish Water 3450
2/ 1
2/ 3.45 6.90 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol.
Jt. in chases

2/ 1.00 2.00 E.O . PVC. Pipe, nom size, 12 for bend


End of supply, assembly & fix
2/ 1.00 2.00 E.O . PVC. Pipe, nom size, 12 for tee

Waste Pipe 2/ 1.00 2.00 E.o. pvc pipe, nom size 12 for spec conn to cistn,
Traps inc bent connectoot & comp. jt
2/ 2 4 Pipewk. ancillary: trap, size 32 drawn PVC bottle
type wi. 38 seal to BS..., wi serd jts to waste o/let
on appliance & comp. it. to pvc pipe. Wash Basin
(wash basin len
900
2/ 1 2 Ditto, nom. size 38, do flr-basin 1000
(sink 1900
2/ 1.90 3.80 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol.
2/ 1 2 Ditto, nom. size 32, pvc wi. 88½ outlet shallow Jt. in chases
seal & cleaning plug ea. side S wi. sord jt. to
waste o/let on appliance & comp. jt. to pvc pipe 2/ 3.00 6.00 E.O . PVC. Pipe, nom size, 12 for bend
(bath
2/ 1.00 2.00 E.o. pvc pipe nom size 12 for spec conn to pillar
tap (m/s) inc bent connector & comp. jt

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: Bedroom 2 cont'd
DATE: 24/03/2023 WC
SMM7 IN USE 1500
800
PLUMBING INSTALLATIONS CONT'D 2300
Bedroom 1
WC 2/ 2.30 4.60 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol.
1153 Jt. in chases
800
1953 2/ 1.00 2.00 E.O . PVC. Pipe, nom size, 12 for tee

2/ 1.953 3.91 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol. 2/ 1.00 2.00 E.O . PVC. Pipe, nom size, 12 for bend
Jt. in chases
2/ 1.00 2.00 E.o. pvc pipe, nom size 12 for spec conn to cistn,
2/ 1 2 E.O . PVC. Pipe, nom size, 12 for tee inc bent connectoot & comp. jt

2/ 1 2 E.O . PVC. Pipe, nom size, 12 for bend Wash Basin


len
2/ 1 2 E.o. pvc pipe, nom size 12 for spec conn to cistn, 2290
inc bent connectoot & comp. jt less wc pipe 1500
790
2/ 1 2 Cut circ. hole thro. 150th. bk. wall for pipe ≤ 55>Ø add flr - wash basin ht 1000
1790
Wash Basin
len 2/ 1.79 3.58 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol.
2075 Jt. in chases
less wc pipe 1153
922 2/ 3.00 6.00 E.O . PVC. Pipe, nom size, 12 for bend
add flr - wash basin ht 1000
1922 2/ 1.00 2.00 E.o. pvc pipe nom size 12 for spec conn to pillar
tap (m/s) inc bent connector & comp. jt
2/ 1.92 3.84 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol.
Jt. in chases

2/ 3 6 E.O . PVC. Pipe, nom size, 12 for bend

2/ 1 2 E.o. pvc pipe nom size 12 for spec conn to pillar


tap (m/s) inc bent connector & comp. jt

Bath
1000
675
1675
flr - bath 400
2075

2/ 2.08 4.15 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol.
Jt. in chases

2/ 1 2 E.O . PVC. Pipe, nom size, 12 for tee

2/ 1 2 E.O . PVC. Pipe, nom size, 12 for bend

2/ 1 2 Pipewkancillary: stop valve, size 12, brass h.p.


scrdn. type to BS 1010 wi 2nr comp. jt to cop.pipe.

Bedroom 2
Bath
1675
3550
4150
1650
200
11225

2/ 11.225 22.45 Pipes st. nom size 12. PVC & fxg to BS….wi. Sol.
Jt. in chases

2/ 2 4 E.O . PVC. Pipe, nom size, 12 for bend

2/ 1 2 Pipewkancillary: stop valve, size 12, brass h.p.


scrdn. type to BS 1010 wi 2nr comp. jt to cop.pipe.

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA Ceiling Finish
DRAWING NUMBER: Study
DATE: 24/03/2023 len wid
SMM7 IN USE 3,300 3,300
Finishes
Take-off list Garage
1. Ceiling len wid
2. Walls 3,925 6,650
3. Floor
Ground Floor Entrance Terrace
Ceiling Finish len wid
Kitchen 600 3,000
len wid add waal 150
2,400 1,900 6,150
900 2,500 add cor. Wid. 2,000
2,350 2,275 8,150
5,650 6,675 less 4,000
less cor. width 1500 4,150 3,000
4,150
less blkwl 150 Visitors WC
4,000 6,675 len wid
2,700 900
5650 2375
less 4,000 900 Living area
1,650 250 len
900 6,000 900
1575 3,100
1,650 6000 1,200
6,000 5,200
Dinning Area
len wid Corridor 1
6000 3150 len wid
less 150 75 2,000 300
5850 3075 75 900
2,075 4,200
2/ 4.00 P.O.P ceiling finish 1,040
6.68 53.4 4,760
2/ 1.65 1,450
6.00 19.80 2,075 12,650
73.20 (kitchen
2/ 5.85 Corridor 2
3.08 35.98 (dinning len wid
1,500 4,175

Storage Corridor
len wid len wid
6,000 2,575 3,300 750
less 2,375 75 less 2,700 150
900 2,650 600 900
250 less 150
2,475 450 900
add 50
2,525 2,650
10mm th. Plasterboard ceilg. Skimmd wi. 3mm ct
Kitchen Terrace of hd. wall plaster
len wid &
6,000 2,575 Paintg, 2 coats of emulsion to gen surfaces, wid.
less 2,525 75 > 300 mm
3,475 2,500
less blkwl 150 2/ 2.53
3,325 2,500 2.65 13.38 (Storage
2/ 3.33
Guest Washroom 2.50 16.63 (Kitchen Terrace
len wid 2/ 2.50
2,500 2,100 1.95 9.75 (Guest Washroom
less 150 2/ 4.00
2,500 1,950 4.00 32.00
2/ 2.50
Guest Bedroom 1.90 9.50
len wid 41.50 (Guest Bedroom
4,000 2,100 2/ 3.30
1,000 3.30 21.78 (study
900 2/ 3.93
4,000 4,000 6.65 52.20 (Garage
2,500 1,000 2/ 4.15
900 3.00 24.90 (Entrance Terrace
2,500 1,900

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: Kitchen Terrace
DATE: 24/03/2023 3,325
SMM7 IN USE add 2,500
Ceiling Finish cont'd 5,825
2/ 2.08 2/5,825 11,650
12.65 52.50
2/ 1.50 Guest washroom
4.18 137.78 2,500
2/ 0.45 add 1,950
0.90 0.81 4,450
191.08 (Corridor 2/4,450 8,900
2/ 6.00
5.20 62.4 (Living Area Guest Bedroom
2/ 2.70 2500 4,000
0.90 4.86 (Visitor's WC 1900 4,000
438.48 4400 8,000
2/4,400 8800 2/8,000 16,000
Floor Finish
Floor finish, semi polished porcelain tiles, lev. Study
as spec'd, fxd wi. approved adhesive on fltd 3,300
screedg (m/s) 3,300
& 6,600
Screed, 50 th., ct.and sd. (1:4) to floors, lev and 2/6,600 13,200
to falls only ≤ 15° from hor.
2/ 2.53 Garage
2.65 13.38 (Storage 3,925
2/ 3.33 6,650
2.50 16.63 (Kitchen Terrace 2/10,575 10,575
2/ 2.50 21,150
1.95 9.75 (Guest Washroom
2/ 4.00 Visitor's WC
4.00 32.00 2700
2/ 2.50 900
1.90 9.50 3600
41.50 (Guest Bedroom 2/3,600 7200
2/ 3.30
3.30 21.78 (study Dining & Living Area
2/ 2.08 6000
12.65 52.50 1775
2/ 1.50 3325
4.18 137.78 3250
2/ 0.45 850
0.90 0.81 4150
191.08 (Corridor 1200
2/ 6.00 900
5.20 62.4 (Living Area 21450
2/ 2.70 1200
0.90 4.86 (Visitor's WC 22650
2/ 4.15
3.00 24.9 (Entrance Terrace Corridor
386.28 6175
4175
2/ 3.93 Floor finish, semi polished concrete tiles, lev. 900
6.65 52.20 as spec'd, fxd wi. approved adhesive on fltd 300
screedg (m/s) in garage 4200
& 2492
Screed, 50 th., ct.and sd. (1:4) to floors, lev and 958
to falls only ≤ 15° from hor. 150
19350

Girth Build-Up
Kitchen Skirting
6,675 Skirting, semi polished porcelain tiles,as spec'd fxd
5,650 wi. approved adhesive to bwk on fltd. Screed 13th
2/12,525 12,525 ct & sd (1:4) as backing
24,650 2/ 24.65 49.30 (kitchen
2/ 10.05 20.10 (storage
Storage 2/ 11.65 23.30 (Kitchen Terrace
2/ 8.90 17.80 (Guest Washroom
2,525 2/ 16.00 32.00
2,500 2/ 8.80 17.60
2/5,025 5,025 49.60 (Guest Bedroom
10,050 2/ 13.20 26.40 (study
2/ 19.35 38.70 (Corridor
225.20

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA Bedroom 2 cont'd
DRAWING NUMBER: 850
DATE: 24/03/2023 150
SMM7 IN USE 3325 700
Skirting
Skirting, semi polished concrete tiles,as spec'd 4525 2550
2/ 21.15 fxd wi. approved adhesive to bwk on fltd. Screed add blkwll 150 150
13th ct & sd (1:4) as backing 4675 2700
(Garage add 1475 1650
6150 4350
Wall Finish 2550
Render, 13th. Ct & Sd int. 6150 1800
&
Paintg gen. surfs, seal & 2ct acrylic paint as 4525 4120
spec'd. 1850
2/ 10.05 4525 2270
2.55 51.255 (storage
2/ 11.65 Master Terrace
2.55 59.415 (kitchen terrace len wid
2/ 16.00 3550 3000
2.55 81.6
2/ 8.80 washroom MS
2.55 44.88 len wid
126.48 (guest bedroom 2500 3100
2/ 13.20 150
2.55 67.32 (study 2500 2950
2/ 19.35
2.55 98.69 (corridor Master Suite
2/ 21.15 len wid
2.55 107.87 (garage 4000 3100
2/ 22.65
2.55 115.52 (Dining & living area 4748 2550
2/ 24.65 1902
0.30 14.79 (kitchen 6650 2550
2/ 7.20
0.30 4.32 (visitor's wc 5175 900
2/ 8.90 450
0.30 5.34 (guest washroom 5175 1350
650.99
Family Area
wall fin. washable ceramic tiles, to beam lev. len wid
2/ 24.65 4075 6500
2.25 110.93 (kitchen
2/ 7.20 Utility
2.25 32.40 (visitor's wc 6000 1200
2/ 8.90
2.25 40.05 (guest washroom Double Living Space
183.38 len wid
6000 2880
First Floor
Ceiling Finish Corridor
Bedroom 1 len width
len wid 2000 5050
4525 5650 1450
2000 6500
725
1825 Foyer
2000 2550 len wid
4675 2500
Washroom BD1 add 1175 less 1450
Len wid 5850 1050
2000 3100
150 3175 3000
2000 2950 150
3150
Washroom BD2 less 1150
len wid 3175 2000
3325 1650
balcony
Balcony BD2 len wid
Len wid 2620 1500
475 2270 150
2470 1500
Bedroom 2
len wid 3405 500
3325 2550 less 300 150
less wshrm width 1650 3105 350

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: Floor Finish Cont'd
DATE: 24/03/2023 2/ 0.48
SMM7 IN USE 2.27 2.16 (Balcony BD2
2/ 3.33
10mm th. Plasterboard ceilg. Skimmd wi. 0.70 4.66
3mm ct of hd wall plaster 2/ 6.15
& 1.80 22.14
Paintg, 2 coats of emulsion to gen surfaces, 2/ 4.53
wid. > 300 mm 2.27 20.54 (bedroom 2
2/ 4.53 47.34
5.65 51.13 2/ 3.55
2/ 2.00 3.00 21.30 (master terrace
2.55 10.20 (Bedroom 1 2/ 2.50
61.33 2.95 14.75 (washroom MS
2/ 2.00 2/ 4.00
2.95 11.80 (washroom bd1 3.10 24.80
2/ 33.25 2/ 6.65
1.65 109.73 (washroom bd2 2.55 33.92
2/ 0.48 2/ 5.18
2.27 2.16 (Balcony BD2 1.35 13.97
2/ 3.33 72.69 (Master suite
0.70 4.66 2/ 4.08
2/ 6.15 6.50 52.98 (Family Area
1.80 22.14 2/ 6.00
2/ 4.53 1.20 14.40 (Utility
2.27 20.54 (bedroom 2 2/ 2.00
47.34 6.50 26.00 (Corridor
2/ 3.55 2/ 5.85
3.00 21.30 (master terrace 1.05 12.29
2/ 2.50 2/ 3.18
2.95 14.75 (washroom MS 2.00 12.70
2/ 4.00 24.99 (foyer
3.10 24.80 2/ 2.47
2/ 6.65 1.50 7.41
2.55 33.92 2/ 3.11
2/ 5.18 0.35 2.17
1.35 13.97 9.58 (balcony
72.69 (Master suite 469.03
2/ 4.08
6.50 52.98 (Family Area Wall Finish
2/ 6.00 Render, 13th. Ct & Sd int.
1.20 14.40 (Utility &
2/ 6.00 Paintg gen. surfs, seal & 2ct acrylic paint as
2.88 34.56 (Double space spec'd.
2/ 2.00 2/ 20.65
6.50 26.00 (Corridor 3.15 130.10 (Bedroom 2
2/ 5.85 2/ 9.90
1.05 12.29 0.30 5.94 (Washroom BD 1
2/ 3.18 2/ 25.38
2.00 12.70 3.15 159.89 (Master Suite
24.99 (foyer 2/ 11.00
2/ 2.47 0.30 6.60 (Washroom MS
1.50 7.41 2/ 21.10
2/ 3.11 3.15 132.93 Bedroom 2
0.35 2.17 2/ 8.95
9.58 (balcony 0.30 5.37 (Washroom BD 2
503.59 2/ 7.49
3.15 47.19 (Balcony
2/ 8.88
Floor Finish 3.15 55.94 (Douuble space
Floor finish, semi polished porcelain tiles, lev. 2/ 10.10
as spec'd, fxd wi. approved adhesive on fltd 3.15 63.63 (Master Terrace
screedg (m/s) 2/ 15.53
& 3.15 97.84 (Foyer
Screed, 50 th., ct.and sd. (1:4) to floors, lev and 2/ 9.85
to falls only ≤ 15° from hor. 3.15 62.06 (Staircase area
2/ 4.53 2/ 19.70
5.65 51.13 3.15 124.11 (Family Area
2/ 2.00 2/ 7.20
2.55 10.20 (Bedroom 1 3.15 45.36 (Utility
61.33 936.95
2/ 2.00
2.95 11.80 (washroom bd1
2/ 33.25
1.65 109.73 (washroom bd2

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: External Wall Finish Cont'd
DATE: 24/03/2023 2/ 2/ 0.75
SMM7 IN USE 0.75 2.25
24.45
Wall Finish Cont'd
wall fin. washable ceramic tiles, to beam lev.
2/ 9.90 Render, 13th. Ct & Sd ext.
2.85 56.43 (Washroom BD 1 &
2/ 11.00 Wall, fin. PVC wall panel. wd.
2.85 62.70 (Washroom MS 2/ 12.68
2/ 8.95 3.00 76.08 (GF
2.85 51.02 (Washroom BD 2 2/ 12.68
170.15 3.00 76.08 (FF
152.16
Ddt
External Wall Finish Openings
2/ 1.20
Render, 13th. Ct & Sd ext. 2.55 6.12 (D3-FF
& 2/ 1.20
Paintg gen. surfs, seal & 3ct white acrylic 2.55 6.12 (D3-GF
paint emul. as spec'd. 2/2/ 2.50
2/ 19.10 2.22 11.10 (W6-FF
3.15 120.33 (FF 2/ 2.50
2/ 12.68 2.22 11.10 (W6-GF
0.98 24.85 (FF 2/ 3.93
2/ 3.25 2.55 20.04
1.00 6.50 (FF 54.48
2/ 17.03
3.00 102.18 (GF
2/ 1.15
3.00 6.90 (GF
2/ 2/ 0.70
3.00 8.40 (GF
2/ 13.78
3.00 82.68 (GF
2/ 1.00
3.15 6.30 (FF
2/ 19.10
3.00 114.60 (GF
2/ 1.00
3.00 6.00 (GF
478.743
Ddt
Openings
2/ 6/ 2.50
2.22 66.60 (W6-GF
2/ 2/ 0.75
2.20 6.60 (W3-GF
2/ 2/ 0.75
0.75 2.25 ((W1-GF
2/ 0.75
5.70 8.55 (W4-GF
2/ 6/ 0.75
2.20 19.80 (W3-FF
2/ 0.75
0.75 1.13 (W1-FF
2/ 2.00
2.40 9.60 (D4-FF
2/ 1.10
2.20 4.84 (W5-GF
2/ 0.75
5.70 8.55 (W4-FF
127.92

Render, 13th. Ct & Sd ext.


&
Paintg gen. surfs, seal & 3ct coffee brown
acrylic paint, emul.as spec'd.
2/ 13.78
3.15 (FF
2/ 17.03
3.15 (FF
Ddt
openings
2/ 2/ 2.50
2.22 22.2 (W6-FF

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: G
DATE: 24/03/2023 len 2425
SMM7 IN USE less
2/600 1200
ROOF wall th. 1/2/150 75
TAKE OFF LIST 1150
1. Wall plate add
2. Purlins RC slab 600 600
3. Rafters wall th. 1/2/150 75
4. Ceiling Joist 1825
5 Hipped rafter
6. Fascia board H
7. Ridge board len 8063
8. Ridge board less
9. Roof covering 2/1350 2700
add
Wall Plate wall th. 2/1/2/150 150
B 5513

C I
len 5272
less
D 600
A I 1200 1800
3472
E
F J
G len
D-I 4150
H add
wall th. 2/1/2/150 150
A RC slab 600
len 19100 75
less 2/675 1350
R.C Slab 2/600 1200 5650
Wall th. 2/1/2/150 150
17750
A 17750
B 12425
B C 6400
len 13775 D 3900
less E 5450
RC slab 2/600 1200 F 5272
wall th. 2/1/2/150 150 G 1825
12425 H 5513
I 3472
J 5650
C 67657
len 8950
less 2/ 67.66 135.31 Wall plate 100x75 sawn hwd pitched
2/1350 2700
wall th. 2/1/2/150 150
6400 PURLINS

D
len 3/1350 4050 C
less
2/1/2/150 150
3900 D
A I
E
len 8000 E
less F
2/1350 2700 G
5300
add H
wall th. 2/1/2/150 150
5450 A
len 15250
F less
Len 5272 (A/11-7) 5825
less
950
425 1375
fascia 19 19
8031

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: 2/ 13/ 5.93 154.18 Roof members, 100x75 swn hwd, pitched raf.
DATE: 24/03/2023
SMM7 IN USE Nr,
F 5272
PURLINS CONT'D add
nr= /4300 1000
1 675 1675
900 4.78 6947
5+1 ddt
6 0.5/150 75
space 50 125
2/ 2/6/ 8.03 96.37 Roof members, pitd. purlins 50x50 swn hwd
2/ 6/ 3.9 46.80 1050) 6822 7+1
143.17 6.5 8nr

RAFTERS
nr(B) 12425
less len€
wall th. 2/1/2/150 150 2) 5450
space 100 2725
12175 add
th. 2/0.5/75 75
1/1050 12175 2/600 1200
11.6 4000
12+1
13nr
(h) r
len 1134
G1(1-2) 4150
add 675
4825 4000 (t)

r= 1134 +4000
(h) r 4151.64
1134
2/6/ 41.42 497.04 Roof member, swn hwd pitched roof rafter

4825 (t)

ht 1359 CEILING JOIST


less
fascia 225 G1/1-4© 6400
1134 add
wll plate 2/0.5/100 100
r= ℎ² + 𝑡² 6500
4956
4.96 E 5450
add
wall plate 100
2/13 4.96 Roof members, pitched,100x75 sawn hwd, raf. 5550

G(1/B-H) 6053
nr(A) 12425 less
less 1000
wall th. 2/0.5/150 150 675 1675
space 2/50 100 add
12175 wall plate 100
1 )12175 4478
1050 nr.
11.59 J 1050) 5650
~ 12+1 5.38
13nr ~ 6+1
7nr
r= 1134² + 5825²
Rf. members, pitched 50x75mm swn hwd in ceilg
= 5934 joists.
5.93 2/ 13/ 6.5 169 (C
2/ 13/ 5.55 144.3 (E
2/ 13/ 4.49 116.74 (H
(h) r 2/ 7/ 4.49 62.86 (H
1134 492.90

5825 (t) from purlin

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI
PROPOSED 2 Nr 4 - BEDROOM HOUSE AT KWABENYA, ACCRA
DRAWING NUMBER: FASCIA BOARD
DATE: 24/03/2023 Len- 15250
SMM7 IN USE add 1750
Roof Cont'd 3900
HIPPED RAFTER 8950
4300
r 1350
a 8000
20050
8603
b 5275
77428
r= 𝑎² + 𝑏² add
3/0.5/19 28.5
A ddt
GA/1-2- 4150 7/0.5/19 66.5
675 77390
add 800
5625 2/ 2/ 77.39 309.56 Roof members pitched 19x225mm swn hwd, fascia

B Roof Covering
G2/A-C- 615
3475
1675 A
5765

r= 5620² + 5820² B
8097.61

H 1134
D

8097.61
Area A
r= 8097² + 1134² len wid
15,250 508,761
8176.6 100
~ 8.18 38
15,250 508,899
Roof members pitched 50x150mm swn hwd in
2/ 8/ 8.18 130.88 hipped rafter Area B
len wid
2/ 3/ 8.18 49.08 Ditto, valley rafter 6,126.84 1,350
100
38
RIDGE BOARD 6,264.84 1,350
LEN- 20,050
less Area C
2/5625 11,250 len wid
8,800 13,875 4,539.13
100
6(C-H) 1,000 38
675 13,875 4,677.13
1,475
1,175 Area D
2,975 len wid
7,300 8,603 186,138
less 100
600 600 38
6,700 8,603 186,276

Ridge board, pitched, 50x100, swn hwd Total length


2/ 8.8 17.6 15,250 5,226
6,264.84 1,350
2/ 2/ 6.7 26.8 (6/C-H 13,875 4677.13
8,603 1,999
43,993 13,252

2/ 43.99 Roof covering, 30° pitch. Galvanized alu. Sheet.


13.25 1166.00

GAGE COUNSULTING GROUP


P.O.Box 531, KUMASI