DURATION
ITEM NO. DESCRIPTION ITEM PRECEED ITEM FOLLOWS
(DAYS)
MOBILIZATION 3 -------- 800
404-1
800 CLEARING & GRUBBING 2 MOBILIZATION
802
900-1
802 EXCAVATION 12 800
400-2
900-1
404-1 REBAR WORKS (FOUNDATION) 12 800
404-2
404-1
404-2 REBAR WORKS (COLUMN GF) 12 900-2
802
404-1
900-1 RC CONCRETE (FOUNDATION) 3 404 WF
802
900 WF
900-2 RC CONCRETE (COLUMN GF) 2 404-2
404-6
404 WF REBAR WORKS (WALL FOOTING) 4 900-1 900 WF
404 WF
900 WF RC CONCRETE (WALL FOOTING) 7 BACKFILL
900-2
BACKFILL 11 900 WF 900-2 (Cont.)
900-2 Cont. REBAR WORKS (COLUMN CONT.) 1 BACKFILL 506 (1) A GF
MASONRY WORKS (GROUND 404-7
506 (1) A GF FLOOR)
18 900-2 Cont.
900-6
404-6 REBAR WORKS (SECOND FLOOR BEAMS) 17 900-2 900-6
404-7 REBAR WORKS (SECOND FLOOR SLABS) 7 506 (1) A GF 900-7
506 (1) A GF 404-5
900-6 RC CONCRETE (SECOND FLOOR BEAMS) 1
404-6 404 Stairs GF
404-7 404-9
900-7 RC CONCRETE (SECOND FLOOR SLABS) 2
900-6 404-4
404-5 REBAR WORKS (SECOND FLOOR COLUMNS) 14 900-6 900-5
404 Stairs GF REBAR WORKS (GROUND FLOOR STAIRS) 3 900-6 900 Stairs GF
900-5 RC CONCRETE (SECOND FLOOR COLUMNS) 1 404-5 506 (1) A SF
404 Stairs SF
900 Stairs GF RC CONCRETE (GROUND FLOOR STAIRS) 3 404 Stairs GF
900-9
506 (1) A SF MASONRY WORKS (SECOND FLOOR) 18 900-5 404 Stairs SF
404-4 REBAR WORKS (GROUND FLOOR SLABS) 12 900-7 900-4
900-4 RC CONCRETE (GROUND FLOOR SLABS) 3 404-4 404-10
404-9 REBAR WORKS (THIRD FLOOR BEAMS) 17 900-7 900-9
900-9 RC CONCRETE (SECOND FLOOR SLABS) 1 404-9 404-10
900-4 900-10
404-10 REBAR WORKS (THIRD FLOOR SLABS) 7
900-9 404-8
900 Stairs GF
404 Stairs SF REBAR WORKS (SECOND FLOOR STAIRS) 3 900-10
506 (1) A SF

330
St. Anthony's College
ENGINEERING AND TECHNOLOGY DEPARTMENT
San Angel, San Jose, Antique

900 Stairs SF RC CONCRETE (SECOND FLOOR STAIRS) 3 404 Stairs SF 900-12


404-8 REBAR WORKS (THIRD FLOOR COLUMNS) 14 404-10 900-8
404-12
900-10 RC CONCRETE (THIRD FLOOR SLABS) 1 404-10
900-8
900-10
900-8 RC CONCRETE (THIRD FLOOR COLUMNS) 1 506 (1) A TF
404-8
900-12
506 (1) A TF MASONRY WORKS (THIRD FLOOR) 18 900-8
404 Stairs TF
404 Stairs TF REBAR WORKS (THIRD FLOOR STAIRS) 3 506 (1) A TF 900 Stairs TF
900-11
900 Stairs TF RC CONCRETE (THIRD FLOOR STAIRS) 3 404 Stairs TF 1008, 1011
Finishings

REBAR WORKS (FOURTH FLOOR COLUMNS) 14


404 (RB)

RC CONCRETE (FOURTH FLOOR SLABS) 1

802 Ramp REBAR WORKS (ROOF DECK BEAMS) 17

RC CONCRETE (FOURTH FLOOR COLUMNS) 1


1032 A(1)
1,102
MASONRY WORKS (FOURTH FLOOR) 18
1002
1018 REBAR WORKS ( FOURTHFLOOR STAIRS) 3
REBAR WORKS (ROOF DECK SLABS) 7
506 (1) A RD
RC CONCRETE (ROOF DECK BEAMS) 1
404 CF RAMP
900 CF RAMP
404 C RAMP REBAR WORKS (ROOF DECK COLUMNS) 3
900 C RAMP
404 B & S
RAMP
900 B&S RC CONCRETE (ROOF DECK SLABS) 2
RAMP
403 (1) 900-13 (P-1)
FINISHINGS 1 900 Stairs TF (P-1) 1032 A(1)
404-11 (P-1)
900-13 (P-1)
DOORS & WINDOWS 29 900 Stairs TF (P-1) 1102
404-11 (P-1)
900-13 (P-1)
RC CONCRETE
1 900 Stairs TF (P-1) 506 (1)A RD
(ROOF DECK COLUMNS)
404-11 (P-1)
900-13 (P-1)
REBAR WORKS (ROOF BEAMS) 4 900 Stairs TF (P-1) 900-12
404-11 (P-1)

331
St. Anthony's College
ENGINEERING AND TECHNOLOGY DEPARTMENT
San Angel, San Jose, Antique

900-13 (P-1)
EXCAVATION 3 900 Stairs TF (P-1) 404 CF Ramp
404-11 (P-1)
PAINTING WORKS 11 FINISHINGS INSTALLATION OF APPLIANCES

ELECRICAL WORKS 1 1008, 1011 1002

PLUMBING WORKS 1 1102 1018 & SEPTIC TANK

TILING WORKS 61 1002 INSTALLATION OF APPLIANCES

MASONRY WORKS (ROOF DECK) 1 900-11 900-12

REBAR WORKS ( COLUMN FOOTING RAMP) 4 802 Ramp 900 CF RAMP

RC CONCRETE (COLUMN FOOTING RAMP) 1 404 CF Ramp 404 C RAMP

REBAR WORKS ( COLUMN RAMP) 5 900 CF Ramp 900 C RAMP


RC CONCRETE (COLUMN RAMP) 15 404 C Ramp 404 B & S RAMP
REBAR WORKS ( BEAM & SLAB RAMP) 9 900 C RAMP 900 B & S RAMP
RC CONCRETE (BEAM & SLAB RAMP) 24 404 B & S RAMP 403 (1)
ROOF & ROOF FRAMING 5 900 B & S RAMP INSTALLATION OF APPLIANCES
900-12, 1018, &
INSTALLATION OF APPLIANCES 7
1032 A(1)
DEMOBILIZATION
INSTALLATION -------
DEMOBILIZATION 3 OF APPLIANCES