PACKING &
DESPATCH:
Counting of
After completion all the
Variation in forgings are
operation and Customer Improper Counting
Quantity with 5 MA 3 properly recorded 2 30 NIL NIL
inspection, forgings are Dissatisfied of forgings
Delivery note before Delivery
despatched to the
note was raised
customer by road in
loose
Prepared By : Approved By :
PROCESS FMEA - FINAL INSPECTION
FINAL INSPECTION;
Inspectors are
After completion of all Approval of May affect
provided with
the process, forgings wrong customer 8 MA Unksilled Inspector 2 2 32 NIL NIL
sufficent on job
are offered for pre component fitment
training
despatch inspection
Prepared By : Approved By :
PROCESS FMEA - COINING
COINING;
Shot blasted
forgings are coined in 7 Straightness May affect First off / Last off
Improper die
ton coining hammer in may not be customer 8 MA 2 and Patrol 2 32 NIL NIL
design
order to achieve the achieved fitment Inspection
required flatness and
straightness
Prepared By : Approved By :
PROCESS FMEA - SHOT BLASTING
SHOT BLASTING:
After the forgings ate
Forgings are
heat treated, scale
Inadequate inspected
formed on the surface Poor Surface
removal of Inadequate Visually 100% for
of the forgings are finish, Customer 5 MA 2 3 30 NIL NIL
scales from process time good surface
removed by shot Dissatisfaction
forgings finish before
blasting operations
unloading
using the wheelabrator
machine
Prepared By : Approved By :
PROCESS FMEA - HEAT TREATMENT
Prepared By : Approved By :
PROCESS FMEA - FETTLING
Prepared By : Approved By :
PROCESS FMEA - FORGING & FORGING INSPECTION
FORGING:
Sheared billets are Less flow of oil to
heated in the furnace 2 Every one hour
furnace
and forged using the May lead to billet tempurature
Less heating of
inspected and approved billets unfillings in 7 MA was inspected 3 42 NIL NIL
die blocks. Forging is forgings and recorded for
done by Flattening, Less heating time 2 its conformance
Rolling, Moulding,
Finishing and Trimming
& Piercing operation
Leads to On Every die
Low heating of component setting the die
3 MI Less heating time 2 2 12 NIL NIL
die blocks Catch up with block tempurature
die is inspected
Dimesion May affect Insufficent stokes 2 First off / Last off 32 NIL NIL
variation in customer 8 MA and Patrol 2
forging fitment Inspection
Improper Trimming
2 32 NIL NIL
tool setting
Prepared By : Approved By :
PROCESS FMEA - RAW MATERIAL RECEIVING & CUTTING
Raw material is
inspected for
Variation in Customer Mistake supply
chemical
chemical Requirements 8 MA made by the RM 2 1 16 NIL NIL
composition while
inspection cannot be meet supplier
receiving the
material
Any surface
Leads to
Improper detects can be
Surface surface craks or
7 MA Inspection by RM 3 detected in the 2 42 NIL NIL
Defects poor surface
Supplier RM receiving
finish
inspection
RAW MATERIAL
CUTTING:
Received and Improper First off / Last off
Inspected raw material setting of billet Variation in billet
2 MI Unskilled operators 2 and Patrol 2 8 NIL NIL
is sheared into billets in shearing weights
Inspection
cold shearing machine
Periodic
Defective tooling 3 maintenance of 1 27 NIL NIL
tooling
End burr Leads to crack
9 MA
formation or lapping
Variation of
2 RM inspection 1 18 NIL NIL
Hardness
Prepared By : Approved By :