Professional Documents
Culture Documents
SYSTEM R13-SP-03
PROCEDURE (SP) Rcr'.
00
No. Eff. Datc
70.16-17
Pagc
I of2
PNOCEDURE
CONTROL OF NONCONFORMING OUTPUT
TITLE
This process describes the procedure in identiffing and controlling nonconforming output
SCOPE
including the disposition actions and responsibilities.
PROCESS DESCRIPTION
INPUT PROCESS OUTPUT
Identified
CONTROLOF
Nonconforming
NONCONFORMING OUTPUT CIient
Client Output l- Disposition /
Nonconforming
Output record
DESCRIPTIVE STATEMENT:
The Process Owner identifies the nonconforming output, determine the appropriate disposition or action, and submit
toDC or Head of Office for review and approval. The disposition is then implemented and verified. Copy of the signed
Nonconforming Output record is submitted to QMS Secretariat for logging and consolidation.
Step Responsible
PROCESS/ACTMTY Details References
No. Personnel
1 Process owner Identiff nonconforming r ldentiff/detect
and record o Nonconforming
output nonconforming output such Output Form
as: (NOF) (rM-R13-
- Typographical errors sP-03-01)
- Other errors resulting
from processing lapses
o Describe the detected
nonconforming service.
SYSTEM R13-SP-03
PROCEDURE (SP) Rcr'. No.
00
Eff. Datc
10-t6.17
Pagr
2of2
Step Responsible
PROCESS/ACTrVrrY Details References
No. Personnel
Chlef/OIG/Head o Divlsion Chlef/Head of Offlce; (NoF) (FM-R13-
of 0ffice Verlfy and ensure that the sP-03-01),
resulting service conforms to
speclfl ed requ irements.
o If verification shows that
requlrements are not met,
advise process owner to take
appropriate action; else, sign
the NOF.
o Submit copy of the sigaed
NOF to the QMS SecretariaL
DEFINTION OF TERMS:
a Nonconforming Output - is a service or product resulting from QMS processes that does not meet
specifi ed requirements.
a Nonconforming Service Form (NOF) - the specified form used to record the nonconforming output and the
actions taken to rectiff it
FORMS:
-4-- -''
--C4>
DON II{6NITEI€ry DONALDA.SERONAY A. CESO III
PATRIMONIO Chief Admin Offi cer/OIC-Assr lDirector
LGOO V Regional Director
Date:_
Office:_ Division/Unit_
Process/ SeMce:
tr Replace tr Repair/Rework/Reprocess
n OtherAction
tr Notlmplemented Reason:
Reviewed
Ofncer
I
II
II
I
II
I
Nolc(l llv