Students are expected to prepare the base case (as per ECBC 2017), proposed case
and calculate the energy savings possible with the applied ECMs. for given office
building for ECBC Compliance.
Brick is the only material to be created. Properties of the material are as below.
Property Value
Conductivity (W / m – K) 1.07
Specific heat (kJ/kg‐K) 0.8
Density (kg/cum) 2240
Thickness (mm) 230
1
SHGC (North) 0.8 0.5
Visible transmittance 0.8 0.27 (min)
Internal loads
LPD 10 W/sqm + Occupancy 9.5 W/sqm (pg‐
sensors (Building Area
Method)
Hint: Model LPD in building area method. Proposed case considers the use of occupancy sensors.
EPD Conditioned zones: 20 Same as As Is case Same as As Is case
W/sqm
Un conditioned zone: 0 Same as As Is case Same as As Is case
W/sqm
Occupancy density Conditioned zones: 15 Same as As Is case Same as As Is case
sqm/person
Occupancy type Office Same as As Is case Same as As Is case
Hint: Select a default “Office” schedule.
HVAC
Cooling Set point 250C Same as As Is case Same as As Is case
System type PSZ – DX DX‐Air cooled (VRF)
Cooling COP 2.8 Determine (Page‐42)
Fresh air 8 l/s‐person Same as As Is case Same as As Is case
Heating None Heat pump
Heating COP NA NA
Miscellaneous
Exterior shading 1m overhang None 1m overhang
Window shading None None None
2
As Is case
% savings
3
% savings
50.0
100.0
North