Professional Documents
Culture Documents
Emergency Response
Emergency Response
\
Emergency Response Plan
The purpose of the Emergency Response Plan (ERP) is to provide guidelines for the response required
in the event of an injury, fire, or any other emergency at a work site.
Definitions
Emergency Assembly/Muster Point
Emergency assembly/muster points are a predetermined location where personnel will gather in the
case of an emergency evacuation.
Medical
l .
services;··:·.
..
' ,
,l
REACT
R - Remove those in immediate danger.
E - Ensure room doors and windows are closed.
A - Activate the air horn (1 long blast).
C - Call 112 and inform the operator.
T - Try to extinguish or control the fire.
Bomb Threat
PCL Project Manager and the PCL
_ When notification of a bomb threat is received by telephone, the
details as possible. All
Project Superintendent must be notified immediately, giving as many
be familiar with the bomb threat procedures.
construction workers, foremen, and supervisors should
~,~.
may.be required).
, -,:. 9q/
Actions ~Be Taken
department at 112 and to the PCL
_ • -coma~ ~hould be made immediately with the local police
details relating to the bomb
,,,., Proje ct~;ge r or Project Superintendent providing all available
• threat6n_ _ A :f~
•vr~]!h-~ al Space Buildworks Private limited
,124507
Rego r~~~, HL City, Sector 37, Bahadurgarh, Haryana
• l:'foJ". U45201H R2022PT C104697
-
blished procedures.
The loca l police dep artment will initiate action in accordance with esta
• cy Evacuation
d and/or evacuated (follow Emergen
• AP,plicable areas will be searche city or other police
ry by PCL and in consultation with
•
/ <'
e
-
,o,-id..
D1recf
l
ed
Real Space Buildworks Private limit
HL City, Sector 37, Bahadurgarh, Haryana,124507
Regd Office: FF7,
U45201HR2022PTC104697