Title Project: Painting

Address:Polar Bear Freezing, Misamis Oriental


Contractor:Mr. Rico Paguidopon
Date: September 4, 2023

We are pleased to submit our quotation for Painting Works on Polar


Bear Freezing located at Tagoloan Misamis Oriental

Building I Material C 96,633.00


Labor Cost 48,500.00
Building II Material C 96,840.00
Labor Cost 78,500.00
Building III Material C 20,970.00
Labor Cost 14,000.00
Building V Material C 14,520.00
Labor Cost 9,500.00
Maintence Labor Cost 6,000.00
Project Cost 385,463.00

Building 1
Materials Quantity Materials Cost Total Cost
Boysen Flat latex Paint 10 pail 2,450 24,500
Boysen Grey 42 gallon 888 37,296
Polycarbonate 4 qty 2,100 8,400
Texscrew 1 1/2 50 qty 2 100
Boysen Sky Blue 8 gallon 945 7,560
Roller Brush #7 6 qty 85 510
Paint Brush #2 2 qty 44 88
Skim Coat 12 bags 390 4,680
Liha 80 20 qty 35 700
Liha 120 15 qty 35 525
Nansag Epoxy 1 liter 565 565
Boysen Blue 10 gallon 778 7,780
Hardiflex 3/16 5 qty 385 1,925
Wall angle 12 qty 52 624
Metal furring 12 qty 115 1,380
Total Cost of Materials 96,633
Building 2 (70mx12m)
Boysen Sky Blue 102 gallon 945 96390
Paint Brush #2 10 qty 45 450
Total Cost of Materials 96,840
Building 3 Parking Area
Boysen Sky Blue 22 gallon 945 20,790
Paint Brush #2 4 qty 45 180
Total Cost of Materials 20,970
Building 4
Boysen Sky Blue 15 gallon 945 14,175
Roller Brush #7 2 qty 85 170
Paint Brush #2 1 qty 45 45
Steel Brush 2 qty 65 130
Total Cost of Materials 14,520

Submitted by:Mr. Rico Paguidopon


Cp Number: 09691526819
PROJECT: PAINTING WORK (Acrytex Wall Paint)
LOCATION:TAGOLOAN MISAMIS ORIENTAL
OWNER: POLAR BEAR

Item I(Front Office, Wall and Ceilling Fix)


DESCRIPTION QTY UNIT UNIT COST TOTAL COST
Painting
Acrytex Primer 19.00 gal 993.00 18,867.00
Acrytex Cast 35.00 gal 568.00 19,880.00
Acrytex Reducer 12.00 gal 886.00 10,632.00
Acrytex Sacred Spring (Gray) 38.00 gal 961.00 36,518.00
Liha #120 15.00 pcs 35.00 525.00
Nansag Epoxy 1.00 quart 565.00 565.00
Acrytex Blue 4.00 gal 750.00 3,000.00
Ceilling
Hardiflex 3/16 4.00 pcs 370.00 1,480.00
Wall angle 12.00 pcs 41.00 492.00
Metal furring 12.00 pcs 109.00 1,308.00
Polycarbonate Roof (Blue) 2.00 pcs 1,665.00 3,330.00
Texscrew 1 1/2 50.00 pcs 2.00 100.00
Boysen Deft Blue (Roofguard) 2.00 pcs 918.00 1,836.00
Roller Brush #7 4.00 pcs 85.00 340.00
Paint Brush #2 3.00 pcs 44.00 132.00
Steel Brush 2.00 pcs 65.00 130.00
Material Cost 99,135.00
Labor Cost 46,672.00
Total Cost 145,807.00
Item II (Parking Area Roof)
Deft Blue 14.00 gal 918.00 12,852.00
Roller Brush #7 2.00 pcs 85.00 170.00
Paint Brush #2 1.00 pcs 45.00 45.00
Cup Brush 1.00 pc 250.00 250.00
Steel Brush 1.00 pcs 65.00 65.00
Material Cost 13,382.00
Labor Cost 12,440.00
Total Cost 25,822.00
Item III(Annex Building Roof)
Deft Blue 92.00 gal 918.00 84,456.00
Roller Brush #7 2.00 pcs 85.00 170.00
Paint Brush #2 1.00 pcs 45.00 45.00
Steel Brush 2.00 pcs 65.00 130.00
Material Cost 84,801.00
Labor Cost 85,800.00
Total Cost 170,601.00

Item IV (Guard and Waiting Area Roof)


Deft Blue 12.00 gal 918.00 11,016.00
Roller Brush #7 2.00 pcs 85.00 170.00
Paint Brush #2 1.00 pcs 45.00 45.00
Steel Brush 2.00 pcs 65.00 130.00
Material Cost 11,361.00
Labor Cost 7,500.00
Total Cost 18,861.00
Item V (Rear Office Maintenance)
Labor Works 2,000.00 lump sum 1.00 2,000.00
Vulcaseal 3.00 quart 632.00 1,896.00
Blind Rivets 1/8 x 1/2 1.00 box 115.00 115.00
Drill Bit -
Material Cost 2,011.00
Labor Cost 2,000.00
Total Cost 4,011.00

SCOPE OF WORKS

Item I(Wall and Roof) 145,807.00


Item II (Roofing) 25,822.00
Item III (Roofing) 170,601.00
Item IV (Roofing) 18,861.00
Item V (Roofing repair) 4,011.00
Total Cost 365,102.00
Engr. Ornel Asperas ME1
Contractor

PROJECT: PAINTING WORK


CONTRACTOR: RICO PAGUIDOPON
OWNER:

Item I(Front Office, Wall and Ceilling Fix)


DESCRIPTION QTY UNIT UNIT COST TOTAL COST
Painting
Acrytex Primer 19.00 gal 993.00 18,867.00
Acrytex Cast 35.00 gal 568.00 19,880.00
Acrytex Reducer 10.00 gal 886.00 8,860.00
Acrytex Sacred Spring (Gray) 38.00 gal 961.00 36,518.00
Liha #120 15.00 pcs 35.00 525.00
Nansag Epoxy 1.00 quart 565.00 565.00
Acrytex Blue 4.00 gal 750.00 3,000.00
Ceilling
Hardiflex 3/16 4.00 pcs 370.00 1,480.00
Wall angle 6.00 pcs 41.00 246.00
Metal furring 26.00 pcs 109.00 2,834.00
Polycarbonate Roof (Blue) 1.00 kgs 1,665.00 1,665.00
Texscrew 1 1/2 50.00 pcs 2.00 100.00
Boysen Deft Blue (Roofguard) 2.00 pcs 918.00 1,836.00
Roller Brush #7 4.00 pcs 85.00 340.00
Paint Brush #2 3.00 pcs 44.00 132.00
Steel Brush 2.00 pcs 65.00 130.00
Material Cost 96,978.00
Labor Cost 46,672.00
Total Cost 143,650.00
Item II (Parking Area Roof)
Deft Blue 14.00 gal 918.00 12,852.00
Roller Brush #7 2.00 pcs 85.00 170.00
Paint Brush #2 1.00 pcs 45.00 45.00
Cup Brush 1.00 pc 250.00 250.00
Steel Brush 1.00 pcs 65.00 65.00
Material Cost 13,382.00
Labor Cost 12,440.00
Total Cost 25,822.00
Item III(Annex Building Roof)
Deft Blue 89.00 gal 918.00 81,702.00
Roller Brush #7 2.00 pcs 85.00 170.00
Paint Brush #2 1.00 pcs 45.00 45.00
Steel Brush 2.00 pcs 65.00 130.00
Material Cost 82,047.00
Labor Cost 85,800.00
Total Cost 167,847.00
Item IV (Guard and Waiting Area Roof)
Deft Blue 10.00 gal 918.00 9,180.00
Roller Brush #7 2.00 pcs 85.00 170.00
Paint Brush #2 1.00 pcs 45.00 45.00
Steel Brush 2.00 pcs 65.00 130.00
Material Cost 9,525.00
Labor Cost 7,500.00
Total Cost 17,025.00
Item V (Rear Office Maintenance)
Labor Works 2,000.00 lump sum 1.00 2,000.00
Vulcaseal 3.00 quart 632.00 1,896.00
Blind Rivets 1/8 x 1/2 1.00 box 115.00 115.00
Drill Bit -
Material Cost 2,011.00
Labor Cost 2,000.00
Total Cost 4,011.00
SCOPE OF WORKS

Item I(Wall and Roof) 143,650.00


Item II (Roofing) 25,822.00
Item III (Roofing) 167,847.00
Item IV (Roofing) 17,025.00
Item V (Roofing repair) 4,011.00
Total Cost 358,355.00

Engr. Ornel Asperas ME1


Contractor