SMITH-EMERY LABORATORIES

104 West 40th Street Suite 400#


New York City, NY 10018

SPECIAL INSPECTION REPORT


Project Name: 2429 LEEWARD CIRCLE Date: 2023-08-18
Fabricator: Livio Building Systems Pvt Ltd DSA App #
Fabricator Address: Plot no. 51, Swami Vivekanand Industrial Estate, Hadapsar, Pune- 411028.
Inspection(s) Performed: Visual Inspection
Document(s) Reviewed: Shop drawings, Dimension verification, AWS D1.1

LACCD Inspection Request (IR):

Summary of Observations: - Smith Emery Laboratories (SEL) Quality Assurance Inspector Shernell Concessio (QAI)
arrived at Livio Building Systems Pvt Ltd, at the job site met with Sundar Pattnaik (HRS Manager) &
Mr. Kiran (QC Lead).

Upon arrival at the facility, QAI inspected the following documents:

 Drawings:
- 2429 Leeward Circle, Sheet No: Z4-000 | Drawing title: KEY PLAN
- 2429 Leeward Circle, Sheet No: Z4-001 | Drawing title: HRS BEAM & COLUMN SCHEDULE
- 2429 Leeward Circle, Sheet No: Z4-002 | Drawing title: HRS CONNECTOR DETAILS/SCHEDULE
- 2429 Leeward Circle, Sheet No: Z4-003 | Drawing title: C1-01-01, B1-01-01#A & B1-01-01B
CONNECTION DETAIL
- 2429 Leeward Circle, Sheet No: Z4-004 | Drawing title: C1-01-03, B1-01-02#A & B1-01-02#B
CONNECTION DETAIL
- 2429 Leeward Circle, Sheet No: Z4-005 | Drawing title: C2-01-01, C2-01-02 CONNECTION DETAIL
- 2429 Leeward Circle, Sheet No: Z4-006 | Drawing title: C2-01-03, B2-01-01 & B1-01-01B CONNECTION
DETAIL
- 2429 Leeward Circle, Sheet No: Z4-007 | Drawing title: C2-02-01, C2-02-01 CONNECTION DETAIL
- 2429 Leeward Circle, HRS sheet
Welding and Fit-up inspection:
QAI observed that fit-up of the following components is completed and ready for inspection.

Drawing number Length fitup status Fillet Weld status (1/4;6-7 mm)
C2-01-01 Approved ok Meets Requirements
C2-01-03 Approved ok Meets Requirements
C2-01-02 Approved ok Meets Requirements
C2-02-01 Not Approved Doesn’t Meet Requirements
C2-02-02 Not Approved Doesn’t Meet Requirements
C1-01-03 Approved Meets Requirements
C1-01-01 Approved Meets Requirements
C1-01-02 Approved Meets Requirements
B2-01-01 Not Approved Doesn’t Meet Requirements
B1-01-02#A Approved Meets Requirements
B1-01-03 Approved Meets Requirements

VISIT SUMMARIZATION

QAI performed a random fit-up and dimensional verification of the above listed components with reference to the
the provided drawings and the tolerances specified in the Livio Quality Manual. Welder was identified as Mukesh
Kumar (welder ID: W-MS) to perform the welding.
Welding was performed utilizing the Flux Cored Arc Welding (FCAW) process. QAI verified the consumables, filler
wire was observed as AWS A5.20/ASME SFA-5.20 E71T-1C, ESAB India Limited, Batch no.: BGX1732399. No rust,
moisture or any contamination on the filler wire was observed. Shielding gas was identified as 99.9% Carbon
Dioxide (C02), calibration of the welding machine was verified and was observed to be current.

HIGHLIGHT

While performing random fit-up check and visual inspection,


QAI observed the following.
 Plate Fitup measurements met requirements.
 Bottom end of the Pillars was welded as per code for the suggested length and width & throat (7 mm)
 QAI noticed Start stop had sharp edges and did not meet code, corrections were made after being
highighted.No slag or porosity detected.
 Pillar (C2-02-01, C2-02-02, B2-01-01) did not meet fillet size requirements for leg size, these were highlighted
to Sundar, Kiran & Dinesh and asked for corrective action before welding was complete.

The necessary corrective measure was taken by Livio QC. Unacceptable welds were corrected either by welding or
grinding. QAI performed a random visual inspection of the identified locations and were observed to be satisfactory
for welding.

Welding was observed to be performed utilizing FCAW process. QAI randomly verified the welding parameters and
were observed in compliance with the WPS. Meanwhile, it was noticed that the flow meter appeared not
functioning correctly and possibly hindering the flow of gas during welding. This was relayed to Livio QC. Corrective
measures were observed to be taken and the welding machine was replaced with another machine (# WM-01) to
continue the production welds. Livio HSR Manager will notify Smith Emery for inspection after completion of
welding of all the parts.

Photos attached for details.

Photo 1 – Electrodes used for welding. Photo 2 – Startstop Edges were corrected.
Photo 3 – Fillet weld meeting code requirement Photo 4 – QAI inspecting Measurements

Photo 5 – plate fitment as per drawings Photo 6 – fillet weld not meeting code.
Summary of Conversations: As noted above

Inspected By: Shernell Concessio Quality Assurance Inspector

Reviewed By: Chris Dsouza QA Reviewer