Professional Documents
Culture Documents
SAES-P-121
Transformers and Reactors
Document Responsibility: Electrical Substations Equipment Standards Committee
Contents
SUMMARY OF CHANGES .............................................................................................................................................................. 3
SCOPE .................................................................................................................................................................................. 5
CONFLICTS AND DEVIATIONS ............................................................................................................................................... 5
REFERENCES ......................................................................................................................................................................... 5
TERMINOLOGY ..................................................................................................................................................................... 6
GENERAL .............................................................................................................................................................................. 7
SIZING .................................................................................................................................................................................. 9
INSTALLATION .................................................................................................................................................................... 10
PROTECTION ...................................................................................................................................................................... 10
DOCUMENT HISTORY ................................................................................................................................................................. 18
Summary of Changes
Paragraph Number
Change Type Technical Change(s)
Previous Revision Current Revision (Addition, Modification, Deletion, (Write the changes briefly)
14 March 2021 21 November 2022 New)
Paragraph Number
Change Type Technical Change(s)
Previous Revision Current Revision (Addition, Modification, Deletion, (Write the changes briefly)
14 March 2021 21 November 2022 New)
Scope
This Standard prescribes the mandatory requirements for the design and installation of
transformers, reactors and instrument transformers. This document may not be attached to nor
made a part of purchase order.
Conflicts and Deviations
Any conflicts between this document and other applicable Mandatory Saudi Aramco
Engineering Requirements (MSAERs) shall be addressed to the EK&RD Manager.
Any deviation from the requirements herein shall follow internal company procedure SAEP-302.
References
All referenced specifications, standards, codes, drawings, and similar material are considered
part of this Engineering Standard to the extent specified, applying the latest version, unless
otherwise stated.
Saudi Aramco References
Saudi Aramco Engineering Procedures
SAEP-302 Waiver of a Mandatory Saudi Aramco Engineering Requirement
SAEP-421 Capital Project Lifecycle Cost
Other References
International Association of Oil and Gas Producers
S-720 Supplementary Specification to IEC 60076-1 Transformers
Terminology
Acronyms
CT Current Transformer
GSU Generator Step-up Unit or UT
HV High Voltage
LV Low Voltage
OFAF Oil Forced-Air Forced
ODAF Oil Directed-Air Forced
ONAF Oil Natural-Air Forced
ONAN Oil Natural-Air Natural
SAMSS Saudi Aramco Materials System Specification
UAT Unit Auxiliary Transformer
UT Unit Transformer
VT Voltage Transformer
Definitions
Approval: Written approval of the Manager, Electrical Systems Division,
Consulting Services Department, Saudi Aramco.
General
Power transformers and distribution transformers shall be the two-winding type and shall be
delta-connected on the supply side and wye-connected on the load side.
Exception:
1. Autotransformers shall be wye-connected with the neutral solidly grounded and provided with a closed
delta tertiary winding. The close delta may supply power to the substation services. Internal CT, located
on one leg of the delta tertiary winding, shall be provided.
2. Generator Step up transformer shall be delta-connected on the generator (low voltage) side and wye-
connected on the transmission (high voltage) side.
Three winding transformers shall not be used.
Transformer maximum flux density at 110% rated voltage shall be at least 10% below saturation
flux density.
The load tap changing requirements for step-down transformers shall be determined by the
project requirements and specified in the SAMSS Data Schedules.
Autotransformer is permitted for connections between two transmission substations where
lowest voltage side is 69kV and above. Autotransformer transformers may carry power flow in
either direction and shall be provided with a HV load tap changer.
When specified all load tap changers shall be equipped for remote operation.
Bids for transformers rated 10MVA ONAN and above shall have LCC analysis as per SAEP-421
and LCC-023.
Dry-Type Transformers
5.8.1 Transformers shall have the following characteristics:
Windings and all main circuit conductors shall be Copper or Aluminum.
Windings shall be encapsulated with solid insulation or vacuum pressure impregnated.
Shall fully comply with either of the following:
IEC 60076-11
UL listed which requires the transformer be manufactured in accordance with applicable
NEMA, IEEE, UL and IEEE standards.
Enclosure material and protection are listed in SAES-P-104.
5.8.2 On Dry-Type Power Transformer terminals which are connected to cables originating from
vacuum circuit breakers, where cable length less than 30 meters, RC snubber surge protection
shall be provided.
5.8.3 Dry type transformers feeding nonlinear loads shall be K-rated as stipulated in SAES-P-100.
Control Transformers shall be meet the requirement of NEMA ST 1, unless specified otherwise in
an individual SAMSS.
Transformer terminals primary or secondary with voltage of 13.8kV and above shall be
equipped with surge arresters and/or RC snubbers for lightning and switching over-voltages.
This include terminals enclosed into oil-filled cable terminal boxes and SF6 GIB.
The lead from the ground terminal of the surge arrester shall be connected by the shortest
possible route to the insulated bushing of discharge counter and leakage current indicator (if
provided) by a conductor with insulation rated not less than 5 kV crest and shall not be more
than 3 meters in length, in any case, to avoid sparkover to ground and thereon directly to a
dedicated ground rod via two number 240 mm2 stranded copper conductor, which shall also be
connected to the station grid conductor in the substation.
The protected transformer tank shall also be connected to the same grounding system as the
surge arrester with as low ground resistance as possible, one ohm or less. The arrester shall be
insulated from ground with 5kV rated standoff insulators, so that the leakage current passes
through the discharge counter and leakage current indicator.
Transformer main terminal terminations shall be one of the following:
5.13.1 Exposed bushings connected to overhead transmission lines.
5.13.2 Exposed bushings connected to open bus transition to underground cables.
5.13.3 Gas insulated duct.
5.13.4 Oil cable box.
5.13.5 Plug-in connector type socket.
5.13.6 Air cable box.
5.13.7 Cable bus as per 16-SAMSS-520.
Note:
For onshore 69kV and above, connections shall be per clauses 5.13.1 or 5.13.2 at the high side shall be
provided. Other connection types per clauses 5.13.3 or 5.13.4 maybe selected only when necessary and
specified in the Data Sheet of 14-SAMSS-531.
For offshore 69kV and above, provision for plug-in connector type socket per clause 5.12.5 at the high side
shall be provided.
8.1.1 This Section specifies the protection devices and schemes that shall be applied to power and
distribution transformers installed in Saudi Aramco facilities.
8.1.2 Refer to SAES-P-114 for general requirements of protection devices and schemes.
8.1.3 Refer to Saudi Aramco Library drawings DA-950214 for typical power transformers protection
schemes.
Transformer Protection Schemes
The following sections specify the required protective relay schemes for the various types of
transformers and transformer applications.
8.2.1 Step-Down, Two-Winding, Power Transformers
The typical protection schemes for step-down, two-winding, power transformers with self-
cooled ratings greater than 772 kVA are shown in the Library Drawings DA-950214.
8.2.2 Generator Step-Up and Auxiliary Station Service Transformer
The protection scheme for a unit-connected generator step-up power transformer, and
associated auxiliary station service transformer connected to the generator leads, is given in
SAES-P-113.
8.2.3 Intertie Autotransformer
The typical protection scheme for an intertie autotransformer is shown in Library Drawings DA-
950214.
8.2.4 Pad-Mounted Distribution Transformer
The protection required for a pad-mounted distribution transformer rated 750 kVA or less shall
be phase and ground overcurrent relays at the high side circuit breaker. Refer to Section 8.4 to
determine if fuse protection is allowed on the HV side of the distribution transformer in lieu of
relays and a breaker.
8.2.5 Pole-Mounted Distribution Transformer
The HV side of an overhead pole-mounted distribution transformer shall have surge arrester
and an expulsion fuse cutout (or fuse link).
8.2.6 Grounding Transformer
Refer to Library Drawings DA-950214 for the typical protection scheme for grounding
transformers
Grounding transformers shall be protected by phase overcurrent relays through a set of devices
50/51XT phase overcurrent relays that shall be connected to a set of delta-connected current
transformers, and shall allow a time overcurrent pickup setting of 1.25 times the continuous
current rating of the grounding transformer.
The 51N neutral overcurrent relays shall allow a pickup setting of 10 to 20% of the 10-second
current rating of the grounding transformer for low resistance grounding system. For solidly
grounded system the relay shall allow a pickup of 10% or less of the transformer rating.
8.2.7 Multiple Transformers on Radial Feeders
Where two or more transformers are connected along a common feeder circuit (at the same or
different locations) and the feeder is served from a remote circuit breaker, each transformer
shall have one of the following HV-side protection schemes located at the transformer:
HV-side relays with transfer-trip to the remote breaker.
HV-side relays and local HV-side circuit breaker or fault interrupting circuit switcher.
HV-side fuses, where allowed by Section 6.
Refer to the appropriate section of this section for the required protection scheme and relays
for each transformer size and type on the feeder circuit.
Trip signals from sudden pressure (63) and low oil level signal (71) shall directly trip transformer
breakers through lockout relay (86TX-2). Other signals such as winding and top oil temperature
(26) shall alarm via the relay to the substation automation system. Refer to Library drawings
DA-950214 for typical scheme.
The transformer mechanical alarms shall be connected to the incomer overcurrent relay if the
transformer is not protected by a differential relay. If no enough inputs are available in the
incomer overcurrent relay, a digital controller shall be used.
The alarm and trip logic of Sealed Transformers shall be as per Table 1:
Table 1: Alarm and Trip Logic of Sealed Transformers
Indication and Protection Alarm / Trip Notes
Oil Level Gauge Low ALARM
Oil Level Gauge Low Low TRIP
Motorfans MCB Tripped ALARM
WTI High ALARM
WTI High High TRIP
OTI High ALARM
OTI High High TRIP
Vacuum/Pressure Gauge ALARM
Sudden Pressure Relay TRIP G1
Pressure Relief Device TRIP G1
The alarm and trip logic of Conservator-type Transformers shall be as per Table 2.
Indication and Protection Alarm / Trip Notes
Main Tank Conservator Bladder ALARM
Rupture monitoring Relay
Main Tank Conservator Oil Level ALARM
Gauge Low
Main Tank Conservator Oil Level ALARM
Gauge Low Low
OLTC Conservator Oil Level Gauge ALARM
Low
OLTC Conservator Oil Level Gauge TRIP
Low Low
Oil-Filled Cable Boxes Conservator ALARM
Bladder Rupture Monitoring Relay
Oil-Filled Cable Boxes Conservator ALARM
Oil Level Gauge Low
Oil-Filled Cable Boxes Conservator ALARM
Oil Level Gauge Low Low
Main Tank Buchholtz Relay 1st ALARM
Float
Document History
21 November 2022 Major To align with the ongoing IOGP review of 14-SAMSS-531, and mainly
cover the following: Optimize transformer efficiency by reducing
temperature rise from 65 to 50C. Reduce transformer size by utilizing
IOGP preferred sizes.
14 March 2021 Major Major revision
22 June 2020 Editorial Replace add SAEP-421.
15 April 2019 Major Focus on the transformer sizing selection. The revision will require
the "Average Daily Maximum Temperature" to be the bases for the
selection. This revision is in line with IEEE std. C57.91 guidelines.
1 January 2018 Editorial Modify paragraphs 5.3 and 5.4
28 January 2016 Major Incorporate IEC standards and specification and add several
enhancements to the existing Saudi Aramco material specification
and engineering standard for transformers.