Professional Documents
Culture Documents
How Configure Consumption Limits For Tariff and District
How Configure Consumption Limits For Tariff and District
Contents
1. Objective ......................................................................................................... 3
2. How it works: .................................................................................................. 3
3. Steps................................................................................................................ 3
User Manual – How to configure the anomaly: Consumption Out of Tariff and District Date : 22/07/2016 Page 2 of 6
Limit
Version: 01
Project: INCMS ECG PROJECT
1. Objective
The purpose of this document is to provide steps for configuring the consumption limit
for the new anomaly “AF419: Consumption out of Tariff and District Limit”.
2. How it works:
1. A MONTHLY_MAX_LIMIT of consumption is defined per tariff and district. The limit
will be the maximum expected consumption for one month.
This maximum will be only for active energy types kWh, no validation of
apparent or maximum demand. In case of Time of use tariffs, the maximum
would be on the total consumption regardless the time of use.
This maximum would be applicable for prepayment, post payment and AMR
meters.
3. Steps
Proceed as follows:
User Manual – How to configure the anomaly: Consumption Out of Tariff and District Date : 22/07/2016 Page 3 of 6
Limit
Version: 01
Project: INCMS ECG PROJECT
Begin by first selecting the district and tariff. The highlighted fields will require you
to select from the options available in the drop down menu.
Click on the “Retrieve Data” icon . The information on the window will be
filtered based on your criteria.
Click on the “Edit” icon and select the tab “Coefficient Definition” as shown:
User Manual – How to configure the anomaly: Consumption Out of Tariff and District Date : 22/07/2016 Page 4 of 6
Limit
Version: 01
Project: INCMS ECG PROJECT
Enter the new value for consumption in the indicated field and click on the “Save”
icon
The new consumption limit will be saved and will appear as shown:
User Manual – How to configure the anomaly: Consumption Out of Tariff and District Date : 22/07/2016 Page 5 of 6
Limit
Version: 01
Project: INCMS ECG PROJECT
N.B:
User Manual – How to configure the anomaly: Consumption Out of Tariff and District Date : 22/07/2016 Page 6 of 6
Limit
Version: 01