Reaz Uddin
Mobile: +880-01755521259
Email: reazvhai@yahoo.com
Mr. Md. Reaz Uddin with in-depth experience in development of power generation
business and oOperation of power projects is working as Chief Executive Officer in
Summit Meghnaghat II Power Company Ltd and Chief Operating Officer, Turbine
Division, Summit Meghnaghat II Power Company Ltd, Summit Meghnaghat Power
Company Limited and Summit Bibiyana-II Power Company Limited - all are being joint
venture companies incorporated to develop on BOO basis a 589 MW dual fuel combined
cycle power plant and a 337MW dual fuel combined cycle power plant at Meghnaghat,
and a 344MW CCPP pProject in Bibiyana respectively. In his career, he has been
involved in the developmented, financinged and/or operatione over of power plants with
aggregate capacity of around 1,270MW, and has been involved in financings of
approximately US$ 1.1billion.
EDUCATION
MBA in Finance from Victoria University, Melbourne, Australia
in 2009.
Professional Experience:
For 589MW dual fuel CCPP Project and 337MW dual fuel CCPP Project at Meghnaghat,
and 344MW CCPP Project at Bibiyana,- Bangladesh, Mr. Reaz leads (i) the EPC works
with EPC Contractors, (ii) project discussions with GE as consortium member, (iii)
project development team for projects financing works and other related works . He
spearheaded the whole gamut of the EPC bids of these three projects leading to
conclusion of the EPC packages worth of US$805 million. EPC packages include among
others Supply Contract, IEC Contract, Guarantee and Coordination Contract and Gas
Turbines Ssale Ccontract.
In Bboth Meghnaghat Projects and Bibiyana-II Project, Mr. Reaz had led the Owner’s
design and construction review team (including Owner’s consultant) for successful
completion of the detailed design and construction works..
Responsible to for managinge the overall Operation and Maintenance (O&M) business of
Summit Turbine Division which includes Summit-Bibiyana 341MW CCPP, Summit-
Meghnaghat 337 MW CCPP, Summit Meghnaghat II 589 MW CCPP and other future
Turbine Power projects. Also responsible for employee recruiting, selection and training
through O&M Contractor. Serves as community liaison and is responsible for all
interfaces with regulatory agencies and lenders. Ensures that all reporting requirements of
the permits, lenders, agreements and corporate are met in a timely manner.
Responsible for Rreview of Financial Model, Feasibility Study report and Environmental
Impact Assessment (EIA) report, and preparation of Request for Proposal (RFP) and
Design Specifications for international bidding for selection of an Engineering,
Procurement and Construction (EPC) contractor.
Worked for development, construction and operation of AES Haripur 360MW combined
cycle power plants in Bangladesh.
Was Rresponsible for all O&M of this business including safe and efficient day-to-day
plant performance including all operation, engineering, maintenance, and environmental
activities. Major responsibilities were enforcement of safety rules and regulations,
monitoring of plant operation, availability and heat rate, liaising with the power off taker,
Bangladesh Power development Board (BPDB) and gas supplier, Titas Gas Transmission
& Distribution Co. Ltd., outage planning and management, procurement of spare parts,
consumables and chemicals, preparation of annual operating budget and operating plan,
development of operating procedures, development of qualification document for plant
operation engineers, etc.
Worked for development, construction and operation of AES Haripur 360MW and AES
Meghnaghat 450 MW combined cycle power plants in Bangladesh.
Supervised operation of Haripur and Meghnaghat power plant for three and half years.
Major responsibilities were enforcement of safety rules and regulations, monitoring of
plant operation, availability and heat rate, liaising with the power off taker. In both the
projects, was involved from Construction and Commissioning phase. Commissioned both
the Combined Cycle Power Plants including Commissioning of Gas Turbines (Mitsubishi
M701F and Siemens V94.2), Fuji Steam turbine.