Mr. Md. Reaz Uddin with in-depth experience in development of power generation
business and Operation of power projects is working as Chief Executive Officer in
Summit Meghnaghat II Power Company Ltd and Chief Operating Officer, Turbine
Division, Summit Meghnaghat II Power Company Ltd, Summit Meghnaghat Power
Company Limited and Summit Bibiyana-II Power Company Limited- all are joint
venture companies incorporated to develop on BOO basis a 589 MW dual fuel combined
cycle power plant and 337MW dual fuel combined cycle power plant at Meghnaghat and
a 344MW CCPP Project in Bibiyana. In his career, he has developed, financed and/or
operate over power plants with aggregate capacity of around 1,270MW and has been
involved in financings of approximately US$ 1.1billion.
EDUCATION
MBA in Finance from Victoria University, Melbourne, Australia in
2009.
Professional Experience:
For 589MW dual fuel CCPP Project and 337MW dual fuel CCPP Project at Meghnaghat
and 344MW CCPP Project at Bibiyana- Bangladesh, Mr. Reaz leads (i) the EPC works
with EPC Contractors, (ii) project discussions with GE as consortium member, (iii)
project development team for projects financing works and other related works . He
spearheaded whole gamut of the EPC bids of these three projects leading to conclusion of
the EPC packages worth of US$805 million. EPC packages include among others Supply
Contract, IEC Contract, Guarantee and Coordination Contract and Gas Turbines sale
contract.
Both Meghnaghat Projects and Bibiyana-II Project, Mr. Reaz had led the Owner’s design
and construction review team (including Owner’s consultant) for successful completion
of the detailed design and construction works..
Involving in construction management of all new combined cycle power plants including
site management, design review, supervision of commissioning and testing, plant
acceptance from EPC contractor.
Responsible for all O&M of this business including safe and efficient day-to-day plant
performance including all operation, engineering, maintenance, and environmental
activities. Major responsibilities were enforcement of safety rules and regulations,
monitoring of plant operation, availability and heat rate, liaising with the power off taker,
Bangladesh Power development Board (BPDB) and gas supplier, Titas Gas
Transmission & Distribution Co. Ltd., outage planning and management, procurement of
spare parts, consumables and chemicals, preparation of annual operating budget and
operating plan, development of operating procedures, development of qualification
document for plant operation engineers, etc.
Worked for development, construction and operation of AES Haripur 360MW and AES
Meghnaghat 450 MW combined cycle power plants in Bangladesh.
Supervised operation of Haripur and Meghnaghat power plant for three and half years.
Major responsibilities were enforcement of safety rules and regulations, monitoring of
plant operation, availability and heat rate, liaising with the power off taker. In both the
project involved from Construction and Commissioning phase. Commissioned both the
Combined Cycle Power Plants including Commissioning of Gas Turbines (Mitsubishi
M701F and Siemens V94.2), Fuji Steam turbine.
Worked in the Operation Department KAFCO (a multinational, joint venture company), with
the responsibility of an Operation engineer in 1600 MT per day Ammonia and 2000 MT per
day granular Urea fertilizer plant. Role profile was to operate the plant from DCS. The
responsibility included operation, Production planning, Distribution co-ordination and first
line maintenance of the plant. Experienced in Erection, Pre-commissioning,
Commissioning and Performance test of Utility plant under the supervision of CHIOYODA
Corporation, Japan. Its major shareholders are Bangladesh Chemical Industries
Corporation, and Marubeni Corporation and Chiyoda Corporation of Japan.