You are on page 1of 4

Md.

Reaz Uddin
Mobile: +880-01755521259
Email: reazvhai@yahoo.com

Mr. Md. Reaz Uddin with in-depth experience in development of power generation
business and Operation of power projects is working as Chief Executive Officer in
Summit Meghnaghat II Power Company Ltd and Chief Operating Officer, Turbine
Division, Summit Meghnaghat II Power Company Ltd, Summit Meghnaghat Power
Company Limited and Summit Bibiyana-II Power Company Limited- all are joint
venture companies incorporated to develop on BOO basis a 589 MW dual fuel combined
cycle power plant and 337MW dual fuel combined cycle power plant at Meghnaghat and
a 344MW CCPP Project in Bibiyana. In his career, he has developed, financed and/or
operate over power plants with aggregate capacity of around 1,270MW and has been
involved in financings of approximately US$ 1.1billion.

PERSONAL Date of Birth: November 30, 1967


INFORMATION
Nationality: Bangladeshi by birth

EDUCATION
MBA in Finance from Victoria University, Melbourne, Australia in
2009.

B.Sc. in Chemical Engineering from Bangladesh University of


Engineering & Technology, Dhaka, Bangladesh in 1992.

Professional Experience:

February 2011 to Date


SUMMIT GROUP
Position Served: Chief Executive Officer, Summit Meghnaghat II Company Ltd.
Chief Operating Officer & Director, Summit Turbine Division

For 589MW dual fuel CCPP Project and 337MW dual fuel CCPP Project at Meghnaghat
and 344MW CCPP Project at Bibiyana- Bangladesh, Mr. Reaz leads (i) the EPC works
with EPC Contractors, (ii) project discussions with GE as consortium member, (iii)
project development team for projects financing works and other related works . He
spearheaded whole gamut of the EPC bids of these three projects leading to conclusion of
the EPC packages worth of US$805 million. EPC packages include among others Supply
Contract, IEC Contract, Guarantee and Coordination Contract and Gas Turbines sale
contract.
Both Meghnaghat Projects and Bibiyana-II Project, Mr. Reaz had led the Owner’s design
and construction review team (including Owner’s consultant) for successful completion
of the detailed design and construction works..

Responsible to manage the overall Operation and Maintenance (O&M) business of


Summit Turbine Division which includes Summit-Bibiyana 341MW CCPP, Summit-
Meghnaghat 337 MW CCPP, Summit Meghnaghat II 589 MW CCPP and other future
Turbine Power projects. Also responsible for employee recruiting, selection and training
through O&M Contractor. Serves as community liaison and is responsible for all
interfaces with regulatory agencies and lenders. Ensure all reporting requirements of the
permits, lenders, agreements and corporate are met in a timely manner.

Drafting and negotiation of Implementation Agreement (IA), Power Purchase Agreement


(PPA), Gas Supply Agreement (GSA), and Land Lease Agreement (LLA) and
administers of all these Project Agreements

Review of Financial Model, Feasibility Study report and Environmental Impact


Assessment (EIA) report, and preparation of Request for Proposal (RFP) and Design
Specifications for international bidding for selection of an Engineering, Procurement and
Construction (EPC) contractor.

Involving in construction management of all new combined cycle power plants including
site management, design review, supervision of commissioning and testing, plant
acceptance from EPC contractor.

Maintaining relationship with EPC Contractors, conducting international bidding,


attending clarification meetings with EPC contractors, and evaluation of EPC bid
proposals for selection of EPC contractor.

July 2007 to January 2011


Powertek Berhad, Malaysia
Position Served: Plant Manager & Director, Meghnaghat Power Limited

Worked for development, construction and operation of AES Meghnaghat 450 MW


combined cycle power plants in Bangladesh. Was responsible for all O&M of this
business including safe and efficient day-to-day plant performance including all operation,
engineering, maintenance, and environmental activities. Administered all facility
agreements. Ensure all reporting requirements of the permits, lenders, agreements and
corporate are met in a timely manner. Established plant revenue and expense budgets.
Responsible for line item budget administration. Defined capital projects and developed
authorizations for capital expenditures. Served as community liaison and was responsible
for all interfaces with regulatory agencies as delegated by The Board. Proactively
participated in and establish ISO 14001 and OHSAS 18001 programs. Provided safe
working environment and through formal programs promoted attitude of safety awareness.
Established and maintained plant operating procedures within company guidelines.

February 2004 to June 2007


CDC Globeleq, UK
Position Served: Plant Manager & Director, Haripur Power Limited
Worked for development, construction and operation of AES Haripur 360MW combined
cycle power plants in Bangladesh.

Major experiences are environmental and social impact assessments, environmental


and other permitting, assisting Sargent & Lundy, USA who worked as Lenders’
Independent Engineer (IE) for Haripur and Meghnaghat projects in conducting due
diligence on the projects, review of IE Reports, arrangement of construction insurance
and loan draw down, etc.

Responsible for all O&M of this business including safe and efficient day-to-day plant
performance including all operation, engineering, maintenance, and environmental
activities. Major responsibilities were enforcement of safety rules and regulations,
monitoring of plant operation, availability and heat rate, liaising with the power off taker,
Bangladesh Power development Board (BPDB) and gas supplier, Titas Gas
Transmission & Distribution Co. Ltd., outage planning and management, procurement of
spare parts, consumables and chemicals, preparation of annual operating budget and
operating plan, development of operating procedures, development of qualification
document for plant operation engineers, etc.

August 2000 January 2004


AES Corporation, USA
Position Served: Operation Manager, HSE Manager, Asst Commissioning Manager
& Operation Engineer

Worked for development, construction and operation of AES Haripur 360MW and AES
Meghnaghat 450 MW combined cycle power plants in Bangladesh.

Supervised operation of Haripur and Meghnaghat power plant for three and half years.
Major responsibilities were enforcement of safety rules and regulations, monitoring of
plant operation, availability and heat rate, liaising with the power off taker. In both the
project involved from Construction and Commissioning phase. Commissioned both the
Combined Cycle Power Plants including Commissioning of Gas Turbines (Mitsubishi
M701F and Siemens V94.2), Fuji Steam turbine.

In preparation of commissioning and long term commercial operation, developed the


mobilization and operating budgets, recruited and trained the plant staff, implemented the
Materials and Maintenance Management system (MP7i), developing all plant policies and
procedures including operating procedures and all plant programs such as safety,
environmental, training, emergency response, maintenance and procurement. During
commissioning period also involved in plant reliability run, and performance test including
emission and noise Performance test.

August 1993- July 2000


Karnaphuli Fertilizer Company Ltd. (KAFCO).
Position Served: Operation Engineer

Worked in the Operation Department KAFCO (a multinational, joint venture company), with
the responsibility of an Operation engineer in 1600 MT per day Ammonia and 2000 MT per
day granular Urea fertilizer plant. Role profile was to operate the plant from DCS. The
responsibility included operation, Production planning, Distribution co-ordination and first
line maintenance of the plant. Experienced in Erection, Pre-commissioning,
Commissioning and Performance test of Utility plant under the supervision of CHIOYODA
Corporation, Japan. Its major shareholders are Bangladesh Chemical Industries
Corporation, and Marubeni Corporation and Chiyoda Corporation of Japan.

References: To be provided on request.

You might also like