This document is the property of Rumaila Field Develops Projects. It must not be stored, reproduced or disclosed to others without written authorisation from the Company
RUMAILA PROJECT
COMPETENCY AND TECHNICAL AUTHORITIES REQUIREMENTS FOR BULK PROCURED ITEMS
CO NT E NT S
1 INTRODUCTION ................................................................................................................ 4
2 DEFINITIONS ..................................................................................................................... 4
3 COMPETENCY................................................................................................................... 4
4 TECHNICAL AUTHORITY.................................................................................................. 4
This document is the property of Rumaila Field Develops Projects. It must not be stored, reproduced or disclosed to others without written authorisation from the Company
RUMAILA PROJECT
COMPETENCY AND TECHNICAL AUTHORITIES REQUIREMENTS FOR BULK PROCURED ITEMS
1 INT RO D UCT IO N
The purpose of the Technical Authority (TA) system is to assign project personnel with the requisite
qualifications and experience for the approval of project technical documentation within their
discipline. This requirement are applicable for all Piping bulk and E&I bulk procured items.
2 DE FI NIT IO N S
3 CO M PET E NCY
COMPANY’s minimum expectations with respect to education and experience for each function in
CONTRACTOR and SUBCONTRACTOR’s organisation are detailed in the generic table in Appendix
1 and 2 respectively. The competency matrix is generic and certain job functions in CONTRACTOR’s
organisation may be combined e.g. Electrical Engineer and Instrument Lead, however,
CONTRACTOR shall ensure and demonstrate it has sufficient depth in numbers to effectively carry
out the review and approval CSDRL tasks presented in the matrix attached in Appendix 3.
COMPANY will verify compliance to the stated qualifications during a prequalification audit of
CONTRACTOR/SUBCONTRACTOR.
COMPANY’s ITPs indicate the authority levels for witnessing of tests, inspections, surveillances, and
mechanical completion walk-downs. CONTRACTOR and SUBCONTRACTOR shall ensure all
functions mentioned in the ITPs are present during inspections and approve the resultant Verification
Record e.g. fabrication procedures, checklist, ITRs, and records, prior to submitting to COMPANY for
APPROVAL.
4 T ECH NI C AL AUT HO R IT Y
CONTRACTOR relevant authority shall review, approve and digitally sign (using a protected pdf) the
cover sheet of all documents in accordance with the matrix in Appendix 3.
COMPANY will verify the correct engagement of CONTRACTOR’s authorities and documents that do
not follow this procedure will be rejected.
This document is the property of Rumaila Field Develops Projects. It must not be stored, reproduced or disclosed to others without written authorisation from the Company
RUMAILA PROJECT
COMPETENCY AND TECHNICAL AUTHORITIES REQUIREMENTS FOR BULK FOR BULK PROCURED ITEMS
CONTRACTOR Quality QM Engineering or Quality Management university degree in relevant discipline 15 years, 5 of which in YES
Manager IRCA ISO 9001 Lead Auditor qualification. Quality
Experienced in receiving inspection, review of certification, Handling of inspection coordination,
Calibration, hydro testing; dimensional control; NDT, welding MDR compilation.
CONTRACTOR Materials WE Materials / Welding Engineering /University Degree or EWF/IIW Welding Diploma 5 years YES
and Welding Engineer. Experienced and knowledge of relevant material handling and storage writing and approving
WPS and PQRs.
(For Valves)
This document is the property of Rumaila Field Develops Projects. It must not be stored, reproduced or disclosed to others without written authorisation from the Company
RUMAILA PROJECT
COMPETENCY AND TECHNICAL AUTHORITIES REQUIREMENTS FOR BULK FOR BULK PROCURED ITEMS
CONTRACTOR Electrical / EIL University Instrument and/or Electrical Engineering degree. 10 years
Instrument Lead Engineer Experienced in process plant and LV &HV design.
Detailed knowledge and design using all means of explosion protection.
Understanding of the general principles of types of protection and marking.
Experienced in Intrinsically safe circuit design and protection systems.
Understanding of content of certificates.
Responsibilities detailed in IEC 60079-14 and IEC 60079-17 and IEC 60079-14: Section 4.5 and
Annex A
http://www.iecex.com/certified_persons.htm
This document is the property of Rumaila Field Develops Projects. It must not be stored, reproduced or disclosed to others without written authorisation from the Company
RUMAILA PROJECT
COMPETENCY AND TECHNICAL AUTHORITIES REQUIREMENTS FOR BULK FOR BULK PROCURED ITEMS
This document is the property of Rumaila Field Develops Projects. It must not be stored, reproduced or disclosed to others without written authorisation from the Company
RUMAILA PROJECT
COMPETENCY AND TECHNICAL AUTHORITIES REQUIREMENTS FOR BULK PROCURED ITEMS
AP P E N D I X 3 – CO NT R AC T O R ’ S M IN IM UM RE V I EW AN D AP P RO V AL O F
SU BC O NT R ACT O R D EL I VE R AB L E S
NDT Inspector
QA/QC Lead
Engineer
A = Approve; R = Review
E P C W
P Q EI
P WE C I I NDT3
M L L
M L 2 3
This document is the property of Rumaila Field Develops Projects. It must not be stored, reproduced or disclosed to others without written authorisation from the Company
RUMAILA PROJECT
COMPETENCY AND TECHNICAL AUTHORITIES REQUIREMENTS FOR BULK PROCURED ITEMS
BLOCK DIAGRAM
This document is the property of Rumaila Field Develops Projects. It must not be stored, reproduced or disclosed to others without written authorisation from the Company
RUMAILA PROJECT
COMPETENCY AND TECHNICAL AUTHORITIES REQUIREMENTS FOR BULK PROCURED ITEMS
DATA
This document is the property of Rumaila Field Develops Projects. It must not be stored, reproduced or disclosed to others without written authorisation from the Company
RUMAILA PROJECT
COMPETENCY AND TECHNICAL AUTHORITIES REQUIREMENTS FOR BULK PROCURED ITEMS
This document is the property of Rumaila Field Develops Projects. It must not be stored, reproduced or disclosed to others without written authorisation from the Company
RUMAILA PROJECT
COMPETENCY AND TECHNICAL AUTHORITIES REQUIREMENTS FOR BULK PROCURED ITEMS
This document is the property of Rumaila Field Develops Projects. It must not be stored, reproduced or disclosed to others without written authorisation from the Company