Professional Documents
Culture Documents
4 Final Inspection System
4 Final Inspection System
No: QM/MAT/04
Guideline For Final
Revision : 00
inspection & In process
Inspection Page 1 of 2
Scope: At all inward, in process and final inspection stages of components & sub assemblies
during Proto, Pre pilot, Pilot, SOP.
Characteristics to be covered: Functional, fitment, Appearance (shade, texture & workman ship)
A) Condition of components:
Shall be free from chips, dust and contamination.
B) Facilities:
• Work bench of suitable size and height having provision for keeping all the gauges, instrument &
Testing equipments and displaying visuals.( Photograph 1)
• Work bench top shall be covered with Rubber sheet to avoid damages.
• Illumination 1000 lux minimum.
• Red Bin with compartment for Non conforming Components
Photograph 1
DOCUMENT CONTROL
Any changes in the above guidelines should have approval of QA head of
MATERIALS department. The modifications will be informed to all concerned
agencies by QA head of MATERIALS.