You are on page 1of 3

F I F T H E D I T I O N

METHOD STATEMENT
13 - 16 MAY ‫ ﻣـــــــﺎﻳﻮ‬2024 10 AM - 10 PM QNCC - DOHA, QATAR

METHOD STATEMENT FORM


PLEASE SUBMIT THIS FORM IN EXHIBITOR’S PORTAL OR TO NEXTFAIRS AT: mariel.ajero@nextfairs.com
DEADLINE OF SUBMISSION: 15th Apr 2024
(YOU MAY SUBMIT YOUR OWN METHOD STATEMENT)

Show Name: ______________________________


build Your House Venue: ______________
QNCC Stand Number: ____________
M06

Exhibiting Company Name: _____________________


Al Jaber Steel Co Contractor Company Name: ___________________

Build-Up Dates: ________________________


06.05.2023 Breakdown Dates: _________________________
19.05.2024

SHOW

This Method Statement issued by: Date:

_____________________________________
Al Jaber Steel Co __________________________________________
17.04.2024

Work Task: Construction and dismantling of Exhibition Stand.

KNOWN HAZARDS

(EX: Falling /Tripping, Dusty/Hot/Humid/Noisy environment, Time Limit)

_____________________________________________________________________________________________

HAZZARD(S)
Installation / Dismantle

Unloading / loading of Materials to and Movement to and from location


from the vehicles

Installation / Dismantling of metal Installation / Dismantling of platform


supports (baseplate support)

Installation / Dismantling of rigging Installation / Dismantling of partitioning walls

Installation / Dismantling of Floor finishing Installation / Dismantling & positioning /removal


of Furniture's Installation of Light fixtures

Installation / Dismantling of AV equipment Final cleaning & Inspection

Handover to client / Organizer

Al Jazeera Al Arabia Street


F I F T H E D I T I O N
METHOD STATEMENT
13 - 16 MAY ‫ ﻣـــــــﺎﻳﻮ‬2024 10 AM - 10 PM QNCC - DOHA, QATAR

5
Number of staff required to work on the stand in order to complete the build-up time provide by organizer: _____________

Move in Date: _________________________________________


06.05.2024 Completion Date:___________________________________________
11.05.2024

SUPERVISION, COMPETENCE AND TRAINING

The following personnel will be responsible for the installation and for the monitoring of health and safety on site.

Names and Contact details

Name: _____________________________________________________________________
Ahmed Khiyari

+974 6652 7384


24 hrs Mobile Number: ______________________________________________________

Email: ______________________________________________________________________
sales@jsc-qa.com

All Staff employed or sub-contracted will be experienced and trained in the work that they are undertaking. Experienced staff will
supervise any trainees. Tools will be operated only by those competent and adequately trained in their use. Electrical tools will be
tested, and users will carry out a visual examination prior to use.

PLANT EQUIPMENT AND TOOLS TO BE USED


Temporary electrical connections during the build-up and break down.

Battery operated tools

Air Compressor Electric Screwdrivers

Battery operated tools

Wood Cutting Machines (router, circular saw) Scaffolding towers

Ladders

OtherTools: _____________________________________________

CONNECTION OF ELECTRICAL SERVICES

Qualified & Trained Electricians will do the connections as per the guidelines of the venue.

HAZARDOUS SUBSTANCES

All paints will be water based and cleaning materials will be environmentally friendly and not hazardous to human health.

OCCUPATIONAL HEALTH ASSESSMENTS

Workers are in good health, regular breaks as necessary, shift change after 12 hours of continuous work. Workers are checked for
substance abuse. Water/food supplied to workers. All necessary PPE supplied to worker.

Al Jazeera Al Arabia Street


F I F T H E D I T I O N
METHOD STATEMENT
13 - 16 MAY ‫ ﻣـــــــﺎﻳﻮ‬2024 10 AM - 10 PM QNCC - DOHA, QATAR

PERSONAL PROTECTIVE EQUIPMENT:

Installation staff will, as a minimum standard, wear safety footwear and hi-vis clothing and Masks.

EMERGENCY PROCEDURES

The Client will brief on the procedures to take on the work site in discovering a fire or other emergency, or in hearing
an evacuation alarm.

ENVIRONMENTAL CONTROLS

Cleaning at set intervals will be done to keep waste at a minimum, all waste products will be disposed of in a responsible
manner and recycled where possible according to the laws of the country.
Tools will have vacuum cleaners attached for dust extraction.

Signature: Company Stamp:

Al Jazeera Al Arabia Street