Reduced Size Balsa Wood Model Build - Group A
Reduced Size Balsa Wood Model Build - Group A
Model Build
Architecture II (2023-24)
Team Member Names: Alyssa Malott, Anna White,
Gabriella Ruffino, Jack Berish
Date: 12.19.2023
Today we started our kits by reading the instructions and beginning our first wall
section. We sorted out through the different wood and cut pieces when necessary.
Team Members: Alyssa Malott, Anna White, Gabriella Ruffino, Jack Berish
Date: 01.04.2024
Today we continued the wall section and started with the roof, as we split up into
pairs.
Team Members: Alyssa Malott, Anna White, Gabriella Ruffino, Jack Berish
Date: 01.08.2023
Date: 01.10.2024
We got 4 trusses done today(8/20 trusses). Also, continued one of our walls and
finished the wall..
Team Members: Alyssa Malott, Anna White, Gabriella Ruffino, Jack Berish
Date: 01.12.2023
Today we are finishing the final wall in sheet two. In addition, we also finished
three roof trusses, leading up to nine more!
Team Members: Alyssa Malott, Anna White, Gabriella Ruffino, Jack Berish
Date: 01.25.2024
We continued to work on our trusses, which we have three more left. We also
wrapped up on a wall section and moving onto the next.
Team Members: Alyssa Malott, Anna White, Gabriella Ruffino, Jack Berish
Date: 01.29.2024
We finally finished all of the roof trusses and continued with the wall sections.
Team Members: Alyssa Malott, Anna White, Gabriella Ruffino, Jack Berish
Date: 01.31.2024
We finished a complete sheet today. The trusses are also officially finished and we have
all moved on in completing the wall sections now.
Team Members: Alyssa Malott, Anna White, Gabriella Ruffino, Jack Berish
Date: 02.02.2024
Date: 02.06.2024
We continued to finish our walk sections. For both sheets currently worked on, we
are halfway done with them. We plan on building the walls before construction.
Team Members: Alyssa Malott, Anna White, Gabriella Ruffino, Jack Berish
Date: 02.08.2024
We finished sheet 3 and on sheet 5. We are almost done with the wall sections on
sheet 6 and will start sheet 4 next class, which is our last.
Team Members: Alyssa Malott, Anna White, Gabriella Ruffino, Jack Berish
Date: 02.14.2024
We finished a whole wall section paper sheet today. We are currently working on
our two last pages before construction happens.
Team Members: Alyssa Malott, Anna White, Gabriella Ruffino, Jack Berish
Date: 02.15.2024
We continued to work on our last two sheets today. Mainly, we focused on the more
complex wall sections today to get them done with.
Team Members: Alyssa Malott, Anna White, Gabriella Ruffino, Jack Berish
Date: 02.21.2024
We started completing our floor plan or Revit, and began constructing our walls
together. Our scale figures came out of the laser printer. We are building our last
wall sections as well.
Team Members: Alyssa Malott, Anna White, Gabriella Ruffino, Jack Berish
Date: 02.27.2024
We started construction on our walls, and are currently all building the last two
on the sheet. We wait to continue our floor plans on Revit, due to complications.
Team Members: Alyssa Malott, Anna White, Gabriella Ruffino, Jack Berish
Date: 02.29.2024
We finished our last walls and are now constructing our roof rusts. We are still
waiting to do Revit due to complications.
Team Members: Alyssa Malott, Anna White, Gabriella Ruffino, Jack Berish
Date: 03.04.2024
We starting finishing up setting the roof trusts in place. The model was
completely off so we had to go off our measurements. We are still waiting for
Revit to load so that we can complete our floor plan.
Team Members: Alyssa Malott, Anna White, Gabriella Ruffino, Jack Berish
Date: 03.07.2024
We finished constructing our house and attached all the trusses. We were able to
get onto Revit again so we continued to finalize the floor plan