You are on page 1of 2

I.

D Activity Name Duration Predesessors Relation lag


Roof Floor
06LRD260513-00 Electrical Conduits & Junction Boxes 14 masonary Works (B6-R) - Electrical Conduits & Junction Boxes (B6-6) FS

06LRD260536-00 Cable Tray 11 masonary Works (B6-R) - Cable Tray (B6-6) FS


Electrical Conduits & Junction Boxes (B6-R) - Cable Tray (B6-R) -
06LRD260513-05 Electrical Wires 6 FS
Electrical Wires (B6-6)
Plastering (B6-R) -Electrical Wires (B6-R) - Electrical Wiring Outlets
06LRD261800-00 Electrical Outlets 3 SS,FS,FS 3,0,0
(B6-6)
Painting First Stage(B6-R) - Electrical Wiring Outlets (B6-R) - LC Wiring
06LRD261800-05 Electrical Switches & Sockets 12 FS
Outlets (B6-R)-Electrical Switches & Sockets(B6-6)
Painting First Stage(B6-R) - Electrical Wiring Outlets (B6-R) - LC Wiring
06LRD261100-00 Sub Distribution Panel 6 Outlets (B6-R) - Electrical Wiring Devices(Switches & Sockets) (B6-R) - FS
Sub Distribution Panel(B6-6)

Painting 2nd Stage(B6-R) - Electrical Wiring Outlets (B6-R) - LC Wiring


06LRD265000-00 Lighting Fixture 4 Outlets (B6-R) -Fire Alarm System Installation (B6-R)-Electrical Wiring FF,FS,FS,FS 2,0,0,0
Devices(Switches & Sockets) (B6-R) -Lighting Fixture(B6-6)

06LRD263213-00 Generator Installation 30 Painting First Stage(B6-R) - Sub Distribution Panel (B6-R) FS
Painting First Stage(B6-R) - Electrical Conduits & Junction Boxes (B6-R)
06LRD283000-00 Fire Alarm System Installation 14 - Cable Tray (B6-R) - Fire Alarm System Installation (Smoke Detector) FS
(B6-6)
Plastering (B6-R) - Electrical Conduits & Junction Boxes (B6-R) - Cable
06LRD262700-00 LC Wiring Outlets 8 SS,FS,FS,FS 3,0,0
Tray (B6-R) - LC Wiring Outlets (B6-6)

Sub Distribution Panel(B6-R) -Lighting Fixture(B6-R) - Fire Alarm


06LRD260126-00 Connecting and Testing 8 FS
System Installation(B6-R) - Connecting and Testing (B6-6)
I.D Activity Name Duration Predesessors Relation lag
Part 06
BA2
06B2D260513-00 Electrical Conduits & Junction Boxes 15 masonary Works(P6-BA2) FS
06B2D260536-00 Cable Tray 20 masonary Works(P6-BA2) FS 2

06B2D260513-05 Electrical Wires 10 Electrical Conduits & Junction Boxes (P6-BA2) - Cable Tray (P6-BA2) FS

06B2D261800-00 Electrical Outlets 7 Plastering(P6-BA2) -Electrical Wires(P6-BA2) SS,FS 3,0


Painting First Stage(P6-BA2) - Electrical Wiring Outlets (P6-BA2) - LC
06B2D261800-05 Electrical Switches & Sockets 12 FS
Wiring Outlets (P6-BA2)

Painting First Stage(P6-BA2) - Electrical Wiring Outlets (P6-BA2) - LC


06B2D261100-00 Sub Distribution Panel 15 FS
Wiring Outlets (P6-BA2) - Earting System Installation (P6-BA2)

Painting First Stage(P6-BA2) - Painting 2nd Stage(P6-BA2)- Marble


wall clading (For Public Area )(P6-BA2) - Marble Flooring ( For pubplic
Area )(P6-BA2) - Cable Tray (P6-BA2)- Electrical Wiring Outlets (P6-
06B2D265000-00 Lighting Fixture 8 FS, SS ,FS,FS,…. 0,3,0,0,0,….
BA2) - LC Wiring Outlets (P6-BA2)- Connection & Testing of HVAC
System (P6-BA2) - Fire Fighting Valves & Piping &SystemTesting (P6-
BA2)

06B2D260500-05 Earting System Installation 15 Electrical Wiring Outlets (P6-BA2) - LC Wiring Outlets (P6-BA2) FS

Electrical Conduits & Junction Boxes(P6-BA2) - Cable Tray (P6-BA2) -


06B2D281300-00 Access Control System 12 FS,FS,SS 0,0,3
Painting First Stage(P6-BA2)
Electrical Conduits & Junction Boxes(P6-BA2) - Cable Tray (P6-BA2) -
06B2D283000-00 Fire Alarm System Installation 20 FS,FS,SS 0,0,4
Painting First Stage(P6-BA2)

Painting First Stage(P6-BA2) - Marble wall clading (For Public Area )


(P6-BA2) - Marble Flooring ( For pubplic Area ) (P6-BA2)- Electrical
06B2D280500-00 CCTV & Voice & Data System 20 Conduits & Junction Boxes(P6-BA2) - Cable Tray (P6-BA2) - FS
Connection & Testing of HVAC System (P6-BA2) - Fire Fighting Valves
& Piping &SystemTesting (P6-BA2)

Plastering(P6-BA2) - Electrical Conduits & Junction Boxes(P6-BA2) -


06B2D262700-00 LC Wiring Outlets 13 SS,FS,FS 3,0,0
Cable Tray (P6-BA2)

Sub Distribution Panel(P6-BA2) -Lighting Fixture(P6-BA2) -Access


06B2D260126-00 Connecting and Testing 8 Control System(P6-BA2) - Fire Alarm System Installation(Smoke FS
Detector)(P6-BA2) - CCTV & Voice & Data System(P6-BA2)