General Directions:
• On a short bond paper, copy and answer the given problem for the
Diesel electric power plant
• Design all the systems included with their corresponding parameters
• Make a layout for the design and its components
• Add introductory information regarding diesel power plants, i.e.,
fundamental principles, formulas, diagrams, advantages, disadvantages,
efficiency, applications, etc.
• Indicate the standards you need to consider and make the citation
• Draw the needed diagrams i.e. (T-s and P-V), and system lay-out. Label
the components with their specifications.
• Make a computational Excel file for your design to simulate the
parameters of a diesel-electric power plant easily
• Make a technical report paper and write it all in ENGINEERING
LETTERING. (Indicate your section and group number on the front
page)
• Provide a short PowerPoint presentation for your report. (Include
parameters and how you design the system)
• Scan and convert your report paper to pdf after you complete the
design, performance, heat balance, efficiency test, and layout of this
diesel powerplant.
I. GENERAL:
II. DATA:
PLANT FEATURES
THE POWER PLANT IS EQUIPPED WITH TWO 6.5 MVA GENERATORS
AT 97% EFFICIENCY; 0.85 POWER FACTOR; 13.8KV 3PHASE 60HZ.
THE TWO 4-STROKE TURBO-CHARGE ENGINES ARE TO BE
SELECTED FROM DAIHATSU ENGINE MANUFACTURER. INSIDE THE
POWERHOUSE BUILDING ARE THE 2 DIESEL ENGINE &
GENERATORS. NEXT TO THE ENGINE FLOOR IS THE 100SQM
CONTROL ROOM & 100SQM SWITCHGEAR. THE BUILDING ALSO
HOUSES THE 2 MOTOR DRIVEN FUEL OIL PUMPS, 2 RECIPROCATING
AIR COMPRESSORS FOR ENGINE START-UP; THE FRESHWATER &
LUBE OIL PUMPS ARE ENGINE DRIVEN & HEAT IS TRANSFERRED TO
THE FRESHWATER & LUBE OIL COOLER RESPECTIVELY. LUBE OIL
PURIFIERS & FUEL OIL PURIFIERS & HEATERS. DIESEL OIL IS USED
FOR START-UP & SHUTDOWN WHILE BUNKER C IS USED FOR
CONTINUOUS OPERATION. THE DIESEL & BUNKER C SERVICE TANKS
ARE INSIDE THE BUILDING. WHILE THE DIESEL & HEAVY FUEL
STORAGE TANK ARE OUTSIDE THE BLDG. THE ENGINE
FRESHWATER & LUBE OIL COOLERS ARE OF PLATE TYPE & RAW
WATER IS SENT TO THE COOLING TOWER FOR COOLING & IS
INSTALLED IN OUTSIDE OF THE POWERHOUSE BUILDING. SO, WITH
THE COMMON STEP UP/STEP DOWN 69KV TRANSFORMER ON THE
SWITCHYARD FOR SYNCHRONIZATION TO THE GRID WILL BE USED.
A FORCE DRAFT FAN SUPPLIES VENTILATION TO THE T/C AT 2.5IN
WG & STACK TO DEVELOP A 1-IN STATIC DRAFT.
III. REQUIREMENTS:
(IMPROVE THE GIVEN PROBLEM FOR A DIESEL POWER PLANT)