You are on page 1of 1

LEGEND

TO
C.1 THE FOUNDATIONS DESIGN IS DONE FOR AN ALLOWABLE BEARING
THE EXCAVATION FOR THE FOUNDATION SUPPORTING THE RETAINING WALLS ADJACENT
E.J. EXPANSTION JOINT CAPACITY OF 250 KPA ON ROCK
MUNIRA'S ROAD AND TO WEST SIDE OF THE BUILDING SHALL BE COORDINATED ON SITE
C.2 THE NATURAL SOIL/ROCK AT THE RECOMMENDED EXCAVATION LEVEL
WITH THE CURRENT SITE CONDITIONS AND EVALUATE THE NEED FOR A SPECIAL SHORING
SYSTEM THAT SHALL BE APPLIED TO AVOID ANY DISRUPTION OR DAMAGES IN THE MAIN RW RETAINING WALL SHOULD BE THOROUGHLY INSPECTED. ALL LOOSE LAYERS, SOFT
ROAD AND THE SERVICES ADJACENT TO (E.G .FENCE ,SIDE WALK ,MEP SERVICES,… )AS SPOTS, SILTY AND CLAYEY POCKETS OR ANY OTHER INFERIOR
SUCH THE CONTRACTOR SHALL LOCATE THE EXCAVATION LIMIT ON SITE AND SEND A RW-R RETAINING WALL ADJACENT TO ROAD MATERIAL SHOULD BE TOTALLY REMOVED AND REPLACED WITH
CLEAR METHOD OF CONSTRUCTION FOR ENGINEER'S APPROVAL PRIOR TO ANY EXCAVATION BACKFILL MATERIAL OR BLINDING CONCRETE AS PER SPECIFICATIONS
WORKS ON SITE . RW-T RETAINING WALL WITH TERRACE AND TO THE APPROVAL OF THE ENGINEER.
C.3 WHERE AN OPEN EXCAVATION CANNOT BE CARRIED OUT, ADEQUATE
LUP LUP EXCAVATION SUPPORTS AND PROTECTION SYSTEMS SHOULD BE
INSTALLED AND MONITORED, IN ORDER TO SAFELY SUPPORT THE
PIPES CROSSING IDES OF THE EXCAVATION AND ANY EXISTING ADJACENT SURCHARGE,
AREA TO BE ON WITHOUT DISTURBING THE UNDERLYING SOILS OR CAUSING ANY DAMAGE.

SIDEWALK HOLD AWAITING C.4 SURFACE WATER SHOULD BE PREVENTED FROM ENTERING EXCAVATIONS,

MUNIRA ROAD LUP LUP


FINAL PIPES
LOCATION AND
FROM PONDING ON PREPARED SUBGRADES, AND FROM FLOODING THE
PROJECT SITE.
E = 413907.161
LUP LUP LEVELS C.5 IF NEEDED, A DEWATERING SYSTEM SHALL BE USED TO ALLOW FOR
E = 413897.823 N = 2911758.521
LUP LUP DRY CONDITIONS BELOW THE FINAL EXCAVATION LEVEL AS PER THE
E = 413891.602 N = 2911746.779
LUP LUP PROJECT SPECIFICATIONS. THE DEWATERING SYSTEM SHALL BE
LUP
00 .00
N = 2911739.036
LUP
86.
E = 413916.576 DESIGNED INSTALLED,MONITORED AND MAINTAINED BY THE CONTRACTOR
LUP
LUP LUP
B
E.J. N = 2911770.198
85 RW7-DG TO THE APPROVAL OF THE ENGINEER AS SPECIFIED THE CONTRACTOR

LUP LUP
RW6-DG 5.6
0 25mm
RW6-DG IS ALSO RESPONSIBLE FOR REMOVING THE DEWATERING SYSTEM, WHEN
LUP E = 413886.184
A E.J.
8 IT IS NO LONGER NEEDED
20
N = 2911732.223 RW5-DG

85.
E = 413887.943 25mm RW4-DG C.6 FOR ALL ADJACENT FOUNDATIONS AT DIFFERENT LEVELS AND WHERE
N = 2911731.783 8 THE SLOPE REQUIREMENTS ARE NOT SATISFIED, LEAN CONCRETE
RW3-DG
3 SHALL BE PLACED UNDERNEATH THE HIGHER FOUNDATION DOWN TO
RW2-DG
.6 THE BOTTOM LEVEL OF THE LOWER FOUNDATION.

8 0 C.7 AS PER THE APPROVED DETAILED GEOTECHNICAL REPORT (NUMBERED


3 PPH600010001P00B, GEOTECHNICAL FILE NO.:2020/158), PROBE
.4

-T
DRILLING UP TO A DEPTH OF 2"B" OR 10m. (WHICHEVER IS GREATER)

W
0

R
LUP

E = 413936.235 SHALL BE MADE UNDER FOUNDATIONS AT A RATE OF 1 PROBE UNDER


RW-T
RW-T N = 2911794.436 EACH SINGLE FOOTING OR 1 PROBE EACH 10 LINEAR METERS FOR
R
W STRIP FOOTINGS. IF A CAVITY IS ENCOUNTERED DURING PROBE

5 .
m
RW-T -T E = 413928.186

.J

-T
R

m
W DRILLING,THEN IT SHALL BE FILLED WITH CONCRETE OR GROUT AS
E

W
RW-T -T N = 2911784.315
2

R
-T
E = 413922.858 RW-T SPECIFIED.
RW-T R
W

W
RW-T -T E = 413913.377 RW-T N = 2911775.206 C.8 FILL MATERIAL, PLACEMENT, COMPACTION AND QUALITY CONTROL SHALL

R
E = 413927.020
N = 2911763.283 E = 413925.558 FOLLOW THE PROCEDURE AND RECOMMENDATIONS SPECIFIED WITHIN THE
RW-T N = 2911780.439

-T
E = 413902.000 E = 413917.538
RW-T E = 413916.076 N = 2911775.705 PROJECT SPECIFICATIONS REFERENCED AS SECTION 312000 OF

W
N = 2911748.976 N = 2911768.516

-T

R
E = 413886.948 R E = 413906.161 N = 2911763.782 DOCUMENT NUMBER HE-000070
W

W
-T
N = 2911728.087
B N = 2911754.210 C.9 THE LEVELS SHOWN ON DRAWINGS IS THE BULK EXCAVATION LEVEL

R
E E = 413917.972
.J
2 N = 2911766.167
5 . AND IT IS ESTIMATED WITH THE CONSIDERATION OF 100mm THICK
A E = 413906.595
0

m E = 413904.699 E = 413927.454
m BLINDING. LOCATION, DIMENSIONS AND LEVELS OF THE EXTRA

-T
N = 2911751.860
.0

N = 2911749.475
LUP

E = 413888.109 R N = 2911778.090

W
W
-T EXCAVATIONS ARE NOT SHOWN ON THE DRAWINGS.

R
N = 2911724.279
89

C.10 THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO


G

ADJACENT SERVICES, BUILDINGS, ROADS, OR UNDERGROUND STRUCTURES


D
0

E = 413899.313
1-

OR UTILITIES OF ANY TYPE RESULTING FROM TEMPORARY WORKS. THE


W
.8

N = 2911745.597
R

R
W
-T SETTLEMENT OF THE ADJACENT GROUND OR BUILDINGS SHALL BE
88

E = 413900.252 MAINTAINED BELOW THE VALUE THAT WOULD NOT CAUSE ANY DAMAGE
0

N = 2911740.517 ACCORDING TO ITS CURRENT CONDITION.


.6

C.11 THE WALLS NAMING ON DRAWINGS ARE ONLY FOR REINFORCEMENT AND
FOUNDATION SIZES GUIDANCE AS FOR THE EXACT TOP LEVEL OF THE WALL
88

R
LUP W
-T IT SHOULD BE READ FROM THE LANDSCAPE DRAWINGS.
8 83
0

2 .0
.4

.8 0
88

RETAINING WALLS DETAILS ARE


E = 413888.818
N = 2911720.450 PART OF THE CORPORATE
E = 413890.000
N = 2911714.058 ACADEMY BUILDING

CORPORATE AC
ADEMY
BUILDING

82.40

0
.6
81
CORPORATE AC
ADEMY
BUILDING

E
FIXED BOLLARD

ROAD BLOCKERS

E
N

=
=

4
13 17
2
9

9 49
1

9
6 .1
E

.6 5
6 0
9
R
-2
W
R

80
81.80
.
81 00
.
81 20
.
81 40
.6
E

81 0
N

=
=

.8
4
14 17

82.000
2
9
0 24
1
0

0 1.0 2.0 3.0 4.0 5.0 10.0


0 .9
.7 3

LUP LUP
7 4

LUP
8

METERS

SCALE: 1:650

LUP
82.40

E
N

=
=

4
14 17
2
9

0 42
82

3
0 .3
.6

.1
LUP

9
0

2
8
2
8
2
.8
0

LUP
83
.00