Column 1c Identify hazard(s) and its risks associated with the activity to be carried out.
Examples of hazards include chemical, biological, electrical, mechanical, physical, ergonomics, psychosocial, sl
Identify possible accidents/ill health associated with each identified hazard. Ex
possible accidents/ill health include fires, explosions, cuts, burns, frost bites, fractures etc.
Column 2c S=Severity is the degree or extent of injury or harm caused by the hazards, or as a result of an acciden
the most likely severity from a value between 1 and 5, rather than the most extreme. Refer t
Matrix tab for the severity table
-Engineering Controls
- Administrati
Protective Equipment
Column 3b Residual Risk Rating
The residual risk is the amount of risk or danger associated with an action or event remaining after inherent ri
reduced by risk controls
L=Likelihood
L may reduce upon introduction of existing control measures
Column 3c S=Severity Sm
upon introduction of existing control measures
Column 3e Additional risk control measures are required when the Risk Rating indicated in column 2d exceeds 6.
6 or less, enter "NA" in the column
Column 3f Enter the name of the person appointed to oversee the implementation of the control measures.
Enter the frequency of implementation.
Note: Please do
Therefore, a computer is not an
d.
e risks.
line of defense.
- Substitution
- Administrative Controls
- Personal
ent remaining after inherent risks have been
S may reduce
control measures.
Risk Assessment Matrix
Overall Risk = Likelihood x Severity
20 16 4
Moderate 12 8 Take remedial action at appropriate time
(4) Operation not Operation not
High priority High priority
Review at 4 -6 Medium Proceed with care. Additional control is advised.
permissible permissible appropriate time
LIKELIHOOD
6
15
Occasional 12 9 Review at 3
Operation not
(3) High priority High priority appropriate Risk acceptable Risk acceptable: Residual risk
permissible If possible, risk reduction should be further
time
considered, particularly severity.
1-3 Low Risk There are no imminent dangers. Frequent review
4 shall be in place especially changes in procedures,
6
Remote 10 8 Review at 2 materials or environment.
Review at
(2) High priority High priority appropriate Risk acceptable
appropriate time
time
4
5
Unlikely Review at 3 2 1
Review at
(1) appropriate Risk acceptable Risk acceptable Risk acceptable
appropriate time
time
HAZARD IDENTIFICATION RISK ASSESSMENT- LIFTS & ESCALATORS OPERATIONS
1-3 Low There are no imminent dangers. Frequent review shall be in place especially changes in procedures, materials or environment. Facility Name: Yashoda Hospitals, Hitec City
Take remedial action at appropriate time
4-6 Medium Proceed with care. Additional control is advised. Review at appropriate time. FMS Program: Lifts and Escalators
High priority remedial action Proceed with extreme caution. Implement additional controls immediately. Emergency control measures shall be in
8-12 High place. Date of Assessment:
15-25 Extreme Operation not Permissible. Stop operation & review controls. Next Review Date:
Patients,Pa
Within Manual resque operation
1 Non Availability of tient Elevator works on battery , reach to nearest floor and elevator door will
ELEVATOR Hospital 2 3 6 1 2 2 Monthly PM of Elevator as per QRT & ENGG
main power supply attenders,S be opened
Premises Schedule
taff
Non Availability of Few lights are works on the battery power ,while power fail
Patients,Pa
lighting in CAR of Within Monthly PPM time service
2 tient
ELEVATOR elevator during Hospital 2 3 6 1 2 2 provider will check the battery O&M,ENGG
attenders,S
power supply Premises healthy condition
taff
failure
1-3 Low There are no imminent dangers. Frequent review shall be in place especially changes in procedures, materials or environment. Facility Name: Yashoda Hospitals, Hitec City
Take remedial action at appropriate time
4-6 Medium Proceed with care. Additional control is advised. Review at appropriate time. FMS Program: Lifts and Escalators
High priority remedial action Proceed with extreme caution. Implement additional controls immediately. Emergency control measures shall be in
8-12 High place. Date of Assessment:
15-25 Extreme Operation not Permissible. Stop operation & review controls. Next Review Date:
Patients,Pa
Within Anybody will operate the fireman switch based on fire in lift
5 tient We will call through landline
ELEVATOR Incase of fire Hospital 3 5 15 surrounding area, running lift will stop and come back to resignated 1 4 4
attenders,S and alert the passangers.
Premises floor and opened the lift door
taff