Column 1c Identify hazard(s) and its risks associated with the activity to be carried out.
Examples of hazards include chemical, biological, electrical, mechanical, physical, ergonomics, psychosocial, sl
Identify possible accidents/ill health associated with each identified hazard. Ex
possible accidents/ill health include fires, explosions, cuts, burns, frost bites, fractures etc.
Column 2c S=Severity is the degree or extent of injury or harm caused by the hazards, or as a result of an acciden
the most likely severity from a value between 1 and 5, rather than the most extreme. Refer t
Matrix tab for the severity table
-Engineering Controls
- Administrati
Protective Equipment
Column 3b Residual Risk Rating
The residual risk is the amount of risk or danger associated with an action or event remaining after inherent ri
reduced by risk controls
L=Likelihood
L may reduce upon introduction of existing control measures
Column 3c S=Severity Sm
upon introduction of existing control measures
Column 3e Additional risk control measures are required when the Risk Rating indicated in column 2d exceeds 6.
6 or less, enter "NA" in the column
Column 3f Enter the name of the person appointed to oversee the implementation of the control measures.
Enter the frequency of implementation.
Note: Please do
Therefore, a computer is not an
d.
e risks.
line of defense.
- Substitution
- Administrative Controls
- Personal
ent remaining after inherent risks have been
S may reduce
control measures.
Risk Assessment Matrix
Overall Risk = Likelihood x Severity
20 16 4
Moderate 12 8 Take remedial action at appropriate time
(4) Operation not Operation not
High priority High priority
Review at 4 -6 Medium Proceed with care. Additional control is advised.
permissible permissible appropriate time
LIKELIHOOD
6
15
Occasional 12 9 Review at 3
Operation not
(3) High priority High priority appropriate Risk acceptable Risk acceptable: Residual risk
permissible If possible, risk reduction should be further
time
considered, particularly severity.
1-3 Low Risk There are no imminent dangers. Frequent review
4 shall be in place especially changes in procedures,
6
Remote 10 8 Review at 2 materials or environment.
Review at
(2) High priority High priority appropriate Risk acceptable
appropriate time
time
4
5
Unlikely Review at 3 2 1
Review at
(1) appropriate Risk acceptable Risk acceptable Risk acceptable
appropriate time
time
FMS RISK ASSESSMENT
RISK SCORE RISK CATEGORY ACTION Risk Assessment Reference No:
There are no imminent dangers. Frequent review shall be in place especially changes in procedures, materials or
1-3 Low environment. Facility Name:
Take remedial action at appropriate time
4-6 Medium Proceed with care. Additional control is advised. Review at appropriate time. FMS Program:
High priority remedial action Proceed with extreme caution. Implement additional controls immediately. Emergency
8-12 High control measures shall be in place. Date of Assessment:
15-25 Extreme Operation not Permissible. Stop operation & review controls. Next Review Date:
Residual
Inherent risk Rating
Risk Rating
Process / Groups
Sl No. Hazard and its risk Risk Area Existing Control Measures Additional Control measures Responsible person (Action/Monitored by)
Activity Exposed
L S RR L S RR
We have provided each and every individual circuits Raw power RCBO
Any faulty 30mA, which will trip that particular Circuit and save the persons and
it may experience the
equipment/ connected equipmens. For UPS circuits we are having only MCB We are having the Annual
electric shock to that Effects the
instrument is That particular protection, as it is an emergency source we are not using RCBOs. For maintenance PM plan, we will check
8 person who is Property and 4 4 16 2 2 4 Senior Manager/Shift Engineer
connected to effected area all Operation theraters we are having the Isolation transfomers and the DBs, panels, for there healthy
using/operating/touc Patients
the power RCBOs with leakage current monitoring alarming, if exceeds the limit it condition
h
sockets will trip. In this case they will use either the Raw power or other
Operation theater and inform to our team for further action
The hospital will feed the power through the DG sets, if power not
If the power
come for days together, For the running of Diesel we need to have And parallelly we have arranged the
is not Power will not be Effects the
sufficient diesel in our Hospitals. For this we are having day tanks of HSD storage, the laisoning is in
11 available for available for the Property and Hosptial 1 5 5 1 3 3 AGM/Senior Manager
capacity each 990 liters and storage upto 2000 litres. And we are progress at the earliest we will get this
longer Hospital, Patients
having the MOM with the supplier, they will arrange within 2 hours in to operational
duration
once we placed the request.
Lighting is not In day time, we are having natural ventilation. And we have taken in to We are preparing the area wise
Effects the
available in The entire hospitals two parts that is all common areas 30% of the lighting from the UPS(2 checklist for the preventive
12 Property and Hosptial 1 5 5 1 2 2 Senior Manager/Shift Engineer/Engineering staff
the Hospitals will become dark are in parallel) and closed areas/room we have taken minimum one maintenance of Light fixtures to
Patients
building light from the UPS(2 are in parallel) ensure proper working of the same.