You are on page 1of 4

ARIS BUDI

SURYAWAN
ELECTRICAL ENGINEER

CURICULUM
VITAE
EDUCATION

Electronically Polytechnic Institute of Technology


Sepuluh Nopember (ITS), Electrical Engineering Study
Programme, graduated in 1998 with graduation point
average 2.70 scale 4
18th April 1973

COURSES OR SEMINAR
FOLLOWED
Palem Ganda Asri 2
Cluster AA Blok. JJ No. 14

1. PLC (Programmable Logic Controller)


Using SIEMENS product, held by VEDC Malang in
1999

+62 81381824412 2. Seminar and Discussion of SCADA System


Development
Held by National System Development Project of
Calibration, Instrumentation and Meteorology in
2000 at LIPI – Serpong

3. AutoCAD 2000
ars_bud_s@yahoo.co.id Held by Widyaloka Makassar in 2001
JOB EXPERIENCES
GENDER:
MALE
A. November 1999 – April 2002
As the Site Engineer of PT.Djawa Baru company (ME
RELIGION: Contractor) on the pump station project in Makassar.
Job Duties:
MOSLEM
Plan the configuration system control of horizontal
conveyor, inclined conveyor and submersible
pump.
Plan and supervising of distribution power and
MARITAL
grounding system
STATUS: Combine the ME product with the civil design to
MARRIED reach conformity
Coordinate technician of every product on the
project implementation
Be the instructor for the candidate of the pump
ETHNIC / station operator
B. July 2003 – September 2004
NATION:
As the Site Engineer of Hazama corp. Company on
JAVANESE / bendung Bissua-Kampili project.
INDONESIAN Job Duties:
Plan and supervising of lighting, distribution power,
grounding system and lightning arrester
Arrange the daily report and the claim
C. September 2004 – October 2005
As the Mechanic – Electric Supervisor of Hazama corp.
HEIGHT / Company on Building Project of Fe-Ni 3 Smelting Plant
of PT.Aneka Tambang Tbk
WEIGHT: Job Duties:
160CM / Combine the ME product with the civil design to
reach conformity
56KG Supervise the implementation of the ME work
Take part in logistic
Providing facilities and resources to the Sub-
Contractors
Monitoring and handing over the system soon after
completion of the project
JOB EXPERIENCE
D.January 2006 – Oktober 2008
As the Mechanic – Electric Supervisor of PT.Tri Mustika Abadi . Company for various project such as Renovation of
Industrial affair Department Building 21 floor and building of Great public Hall of leather, Rubber and plastic Industry.
E. October 2008 – December 2009
As the Mechanic – Electric Supervisor ofPT.Encona Inti Industri ( EPC )
Job Duties:
Monitoring and handing over the system soon after completion of the project
Coordinating all activities relating to the project from the construction stage to the completion
Supervision the construction activities, sub-contractors works, up to the final completion of the entire satisfaction
ofthe client
Create and submit progress reports
F.January 2010 – June 2013
As Coordinator Mechanic – Electric untuk PT.Global Daya Manunggal- PT. AKH Group
Job Duties:
Prepare, monitor and evaluate master schedule of the entire project and ensure timely reporting
of the progress report of the project
Evaluate project budgeting and cost planning to prepare and manage project budget ffrom execution
until project done
Project monitoring, man power planning,control and maintain materilas, MEP Scope
G.July 2013 – February 2014
As Special inspector di PT. JONES LANG LASSALE placement at Building Management Bank Indonesia Jakarta.
Job Duties:
Supervision the construction activities, sub-contractors works, up to the final completion
Attending progress meetings with the clients and keep the management informed on the status of the Project
Cooperation with Bank Indonesia for recruitment proposed by the operator / customers
H. Februari 2014 – Januari 2018
Procurement dan Matrial Control ( PMC ) lead PT. JAPA MELINDO PRATAMA
Job Duties:
Support the procurement of teams for mentoring as well as for product introductions delivered by vendors.
Internal QS support team for design (VE) adaptation to cost plan.
Internal QS support team for calculation / data on job changes in thefield.
Responsible to the General Manager & President Director
Support team QS internal for document & specification as tender
Monitoring and verification to finalize Material Take Off (MTO) specified in the drawings, which are required to
execute projects
Internal QS support team for design (VE) adaptation to cost plan.
Prepare, monitor and evaluate master schedule of the entire
i.January 2018 – February 2020
As Mechanical Electrical PT. INTI INDAH
Job Duties:
MOTTO Drawing guidelines and plans for the site engineers for their day to
day activities
Hardworking, no smoking Any other related activities required by the management
and honesty Support team QS internal for document & specification as tender
Supervision the construction activities, sub-contractors works,
up to the final completion of the entire satisfaction ofthe client
i.March 2020 – Desecember 2020
As Mechanical Electrical Estimate PT. SEPULUH SUMBER ANUGERAH
Job Duties:
Make R.A.B for document tender
LANGUAGE
Evaluate project budgeting and cost planning to prepare and
manage project budget ffrom execution until project close.
ENGLISH Project monitoring, man power planning,control and maintai
INDONESIAN materilas, toolsare within budget and schedule.
Any Other A Monitoring and verification to finalize Material Take Off
(MTO) specified in the drawings, which are required to execute
projects ctivity
J.March 2021 - November 2021
As estimation manager PT. Korindo construction
SOFT WARE Job Duties :
responsible for calculations, preparation and all aspects in
submitting bids
MICROSOFT WORD
providing input to the construction manager on ongoing projects
MICROSOFT EXCEL
MICROSOFT PROJECT
AUTOCAD2000

this Curriculum Vitae is truly arranged,


Sincerely Yours

Aris Budi Suryawan,A.Md