DOC NO CLIENT EFFECTIVE DATE REV DATE REV APPROVED BY
PROC/SHECOMM/01 ESKOM 17/01/2024 17/01/2025 00 FRANKLIN NGOVE
PROJECT DESCRIPTION REFURBISHMENT OF 8MM HDPE EQUIPMENT DOSING LINE THROUGH
REMOVAL AND REPLACEMENT OF THE DEFECTIVE LINES PROJECT LOCATION KUSILE POWER STATION KEY OHS PERONNEL NAME CONTACT DETAILS SIGNATURE SIGNATURE DATE SECTION 16(2) SITE MANAGER DOCUMENT ORIGINATOR ACE MABANDLA 076 041 7671 17/01/2024
Occupational Health and Safety Act No 85 of 1993 as Amended
SHE COMMITTEE MINUTES
1. MATTERS ARISING FROM PREVIOUS MINUTES Action Completion