SITE INSTRUCTION Value
This instruction does not constitute a variation. If you consider that this constiMes a cost variation and/or extension of time according to the Conditions of
ContracL please notify Royal HaskoningDHV in writing and submit according the Conditions ot the Contract, within the given timefmme from the date of
issue of this Instruction, your quotation for approval. Quoations should also describe the SI No. and the subject to which they relate. None of such
variation-related tasks should be implemented until they get approval from Royal HaskoningDHV.
Dear Contractor,
This checklist should be completed once a month by the project management of each contractor.
Compliance to this process is a critical safety indicator for Unilever.
Please submit your completed form to RHDHV by the 25th of each month.
Please go over each statement in the form and if there is a deviation against the standard or
room for improvement indicate this in the form by marking the °YES” box in the “do you propose
action” section.
Also include a short description of what action you will take to ensure compliance.
This can be done in the “remark” section.
Submission of this form can be done via the regular submittal procedures of RHDHV.
If you have any questions, do not hesitate to contact Odri Amir, RHDHV SHE manager for further
explanation.
Kind regards
1. The enterprise has a written safety policy, which states Do you propose
action? the safety and health standards to which the employer No Yes Priority
should adhere
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
policy is.
7. All workers are aware that the site manager
has established a safety policy and what the
G407-04 Construction Self-Assessment Checklist
Priority
Do you propose action? No Yes
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
18. The site is kept tidy and materials are Do you propose
stored safety action? No Yes
Priority
Remarks
Excavations
Remarks
Remarks
Remarks
Remarks
Remarks
25. There are barriers to stop persons falling into Do you propose
the excavations. action? No Yes
Priority
Remarks
Remarks
Remarks
Scaffolding
Remarks
Remarks
31. All the uprights of the scaffold are mounted Do you propose
on proper base plates and timber sole plates action? No Yes
if necessary, or prevented in some other way Priority
from slipping or sinking.
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
38. Guard-rails and toe boards are erected to a safe Do you propose
height at the open sides and ends of scaffold action? No Yes
platforms from which there is a drop of 2m or Priority
more.
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
48. The ladders that are in use are in good condition. Do you propose
action? No Yes
Priority
Remarks
Remarks
50. Where ladders cannot be secured at the top for Do you propose
technical reasons, they are secured near the action? No Yes
bottom or footed. Priority
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
56. There are crawling boards for work above Do you propose
fragile material such as asbestos cement sheets action? No Yes
or glass. Priority
Remarks
Remarks
Remarks
Remarks
Remarks
Steel erection
Remarks
62. Where temporary access platforms are not in use, Do you propose
action? steel erectors shall wear safety harnesses and lifelines No Yes
Priority attached to secure anchorage points.
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Confined spaces
G407-04 Construction Self-Assessment Checklist
73. The internal atmosphere of a confined space
Do you propose
is tested before work begins to ensure an
action? No Yes
adequate
Priority
level of oxygen in the air and freedom from toxic
gases
Remarks
Remarks
Remarks
Remarks
78. Underground services are located and made safe. Do you propose
action? No Yes
Priority
Remarks
Pilling
Remarks
Remarks
Transport
81. All site vehicles are in good repair.
Do you propose
action? No Yes
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
90. Every crane (or excavator used as a crane) Do you propose action?
is inspected by the operator prior to use.
No Yes Priority
Remarks
Remarks
Remarks
Remarks
Remarks
95. The crane operator is trained and competent for the specific piece of equipment
and is over the age of 18. Do you propose
action? No Yes
Priority
Remarks
96. The rated load capacities for varying radii of the Do you propose
jib operating speeds and instructions are displayed action? No Yes
and are visible to the operator. Priority
Remarks
97. Crane cabins are safe and well designed with Do you propose
safe means of access to them and crane action? No Yes
controls are clearly marked. Priority
Remarks
99. Operators and banksmen find out the weight of a Do you propose action?
Remarks
100. Every crane of more than 1 ton capacity has Do you propose
an an efficient automatic safe load indicator action? No Yes
which is inspected weekly. Priority
Remarks
Remarks
102. There is a safe means of access to all parts of the Do you propose
action? crane to which it is necessary to go for operation or No Yes
Priority maintenance.
Remarks
Remarks
Remarks
Remarks
106. There are gates at all landings and points of Do you propose
access to the hoist platform. action? No Yes
Priority
Remarks
107. The gates are kept shut when the platform is not Do you propose
at that landing. action? No Yes
Priority
Remarks
Remarks
Remarks
112. Controls are arranged so that the hoist can Do you propose
be operated from one position only action? No Yes
Priority
Remarks
113. The platform has brakes or devices which will Do you propose
hold It and the load in position if the hoisting action? No Yes
rope or mechanism fails. Priority
Remarks
114. There are at least three full turns of rope on Do you propose
the winch winding down when the platform is action? No Yes
in its lowest position. Priority
Remarks
Remarks
118. The hooks are properly designed and constructed. Do you propose
action? No Yes
Priority
Remarks
Ergonomics
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
125. All dangerous parts such as exposed gears. chain Do you propose
action? drives and projecting shafts are adequately guarded. No Yes
Priority
126. All guards are secured and in good repair. Do you propose action?
No Yes Priority
Rerriarks
Hand tools
127. Hand tools are regularly inspected for safe condition Do you propose action?
No Yes Priority
Remarks
Remarks
Remarks
130. Hammers, chisels and other impact tools do Do you propose action?
not have mushroomed heads. No Yes Priority
Remarks
Remarks
132. The operators of bolt guns are properly trained Do you propose
so that they are able to deal with misfires. action? No Yes
Priority
Remarks
133. The operators are informed and trained on the basis of the
Remarks
134. Belt guns and cartridges not in use are Do you propose action?
unloaded and kept in a secured place. No Yes Priority
Remarks
136. Safety helmets, safety goggles and safety shoes Do you propose
action? are worn by the operator and others within the vicinity. No Yes
Priority
Remarks
Remarks
Power-driver machinery
Remarks
Remarks
Remarks
141. Compressed air tools are used with caution Do you propose
and are never directed at people. action? No Yes
Priority
Remarks
Electrical equipment
Remarks
143. Electrical equipment including wires and cables is Do you propose action?
Remarks
144. All connections to the power supply are made Do you propose
by proper connections or plugs. action? No Yes
Priority
Remarks
Remarks
Remarks
Remarks
Remarks
149. The location of underground cables has been marked Do you propose
action? and precautions taken to avoid contact with them. No
Yes Priority
Remarks
Remarks
Remarks
Remarks
154. The valves of all cylinders are closed when Do you propose
the cylinder is not use. action? No Yes
Priority
Remarks
Remarks
Remarks
Hazardous substances
157. All harmful materials such as asbestos and lead Do you propose
have been identified and suitable precautions action? No Yes
taken. Priority
Remarks
Remarks
159. Chemical safety data sheets are available for Do you propose
obtaining information about hazardous chemicals action? No Yes
in use. Priority
161. Workers are aware of the hazards of the substances Do you propose
action? they are using and have been informed of the No Yes Priority
precautions to be taken by them in particular
when using cement.
Remarks
162. Workers have been trained in the handling and Do you propose
use of hazardous chemicals. action? No Yes
Priority
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
168. All parts of the work site are properly lit by Do you propose
natural or artificial light whenever work is going action? No Yes
on Priority
G407-04 Construction Self-Assessment Checklist
Remarks
Remarks
Remarks
Remarks
Remarks
Welfare facilities
Remarks
Remarks
Remarks
Remarks
178.
Do you propose
179. There are sufficient and suitable facilities action? No Yes
for preparing and eating food. Priority
Remarks
Remarks
Fire precautions
182. There are the right number and type of Do you propose
fire extinguishers on the site. action? No Yes
Priority
Remarks
Remarks
Remarks
Remarks
Remarks