You are on page 1of 2

1.

Check new field log every morning near front door

2. Open borehole tracking google sheets and update it every morning,


then screenshot to field group, tag david liu, dylan, and the samplers

3. double check field log with the message sent by kriska at field group

4. check also for well monitor installation,


if well depth more than 3 m, have to file report to MECP. template is in:
G:\Shared drives\Public\WELL TAG MONITORING, file name TEMPLATE

5. fill the TEMPLATE:


type: construction (if installing), abandonment (if removing)
measurement always in metric
1. well owner's information, check in project folder then open permit folder
2. well location, no need fill township.
two ways to check coordinates: open gps folder, or estimate using google
earth pin
and the bh plan point
3. overburden, mix all fill description into one, separate the natives, check
field log
4. annular space, use monitoring well structure, volume formula:
(pi/4)*0.1524^2*depth
5. method of construction, always augering
6. well use, monitoring
7. status of well, observation/monitoring hole
8. casing, diameter 15.24 cm, plastic, wall 0.008, 0 to end of well
9. screen, diameter 15.24 cm, plastic, start well to end of well
10. water found at encountered depth, if not found then untested
11. hole diameter 15.24 cm, depth from 0 to well finished
12. just check disinfected no
13. save image of google earth with the pin then attach
14. just fill date work completed
15. well contractor/technician information, use tony haddad info
Business name: GEOPRO CONSULTING LIMITED
Well Contractor License Number: 7774
Business address: 40 VOGELL ROAD, UNIT NO. 58, RICHMOND HILL, ON, L4B 3N6
Business phone: 416 999 2600
Business email: Wells@spinc.org
Last name of Well Technician: HADDAD
First name of Well Technician: TONY
Well Tech License Number: 3557
16. declaration, just fill
17. validate, enter well number. press signature box, sign as tony haddad,
password is 123456
18. make validated pdf, and also print normal pdf as _OC (original/owner's
copy idk)

6. open incognito browser. then send to MECP email. ours: wells@spinc.org /


DoWellsWell2021
to: WellRecordSubmission@ontario.ca, cc: Kriska@geoproconsulting.ca,
haddto@gmail.com, dave@spinc.org
bcc: david@geoproconsulting.ca
subject: Well Record 22-XXXXGH2
Well Decommissioning Record 23-2902G
Hi,

Good day to you.


Please see the attached well records.
Thank you,
Mark

Hi,

Good day to you.


Please see the attached well decommissioning record.

Thank you,
Mark

7. send email again to tony and cc kriska, only OC


subject: Well Record 22-XXXXGH2

Hi Tony,

Please see attached well records filed.

Regards,
Mark

8. update well tag filing excel sheet after email

NOTE: dont file well decommissioning unless required


always use convert to metric

You might also like