0% found this document useful (0 votes)
384 views1 page

Safety Checklist for Contractors

The document is a daily safety observation report checklist for a construction project. It contains 7 sections checking safety requirements like personal protective equipment, positions of people, tools and equipment, procedures, certifications, sanitation, and other items.

Uploaded by

thennarasu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
384 views1 page

Safety Checklist for Contractors

The document is a daily safety observation report checklist for a construction project. It contains 7 sections checking safety requirements like personal protective equipment, positions of people, tools and equipment, procedures, certifications, sanitation, and other items.

Uploaded by

thennarasu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

MASTOURA FOR TRADING AND CONTRACTING COMPANY

PROJECT:___________________________________________

DAILY SAFETY OBSERVATION REPORT

OBSERVATION CHECKLIST: 3. TOOLS AND EQUIPMENT


WORK PERMIT NUMBER CORRECT FOR THE JOB
HOT USED PROPERLY
COLD CONDITION
CONFINED SPACE ENTRY (CSE) 4. PROCEDURES AND HOUSEKEEP
PPE: PROCEDURES ADEQUATE
1. PERSONAL PROTECTIVE EQUIPMENT PROCEDURES KNOWN/UNDERSTOOD

HEAD PROCEDURES FOLLOWED


EARS HOUSEKEEPING
EYES AND FACE WARNING SIGNS BARRICADE
RESPIRATORY SYSTEM FIRE EXTINGUISHER
HANDS 5. CERTIFICATIONS / ORIENTATION
BODY SAFETY ORIENTATION
FEET PERMIT RECEIVER EXAM/CERTIFICATIONS

FALL PROTECTION LICENSE


2. POSITIONS OF PEOPLE 6. SANITATION
FALLING TOILETS
OVEREXERTION WASHING FACILITIES
STRIKING AGAINST / STRUCK BY POTABLE WATER
CAUGHT BETWEEN OBJECTS EATING AND DRINKING AREAS
INTAKE/CONTACT WITH HAZARDOUS SUBSTANCE 7. OTHERS
CONTACT WITH HOT/COLD SURFACE H2S DETECTOR
CONTACT WITH ELECTRIC CURRENT FIRST AID KIT

IN-CHARGE PERSONNEL/FOREMANN/SUPERVISOR BADGE NUMBER


ACTION NEEDED RESPONSIBLE PERSON To Be Mark by the Safety Officer

( ) Corrective Action APPROVED and DONE


( ) Further Action Required
( ) Not Acceptable
REMARKS:

ISSUED BY: PRESENTED TO:

SAFETY OFFICER PROJECT MANAGER

You might also like