WELDING MACHINE DAILY INSPECTION
Welding Machine No.: _________ Brand: ______________ Model: __________ Inspection Month / Year: ____________

DAY OF INSPECTION
ITEMS TO BE INSPECTED 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
I. MECHANICAL (Engine Side)
1. Walk Around Inspection (obstruction)
2. Water Coolant Level/Cap
3. Engine Oil Level
4. Diesel Fuel Level / Cover
5. Belt Right Tension / Guard
6. (Start Engine)
7. Oil Pressure
8. Temperature
9. Oil
10. Oil / Water Leakage
II. ELECTRICAL (Generator Side)
1. Control Panel Gauges
2. Charging System
3. Starting System
4. Harness (wiring)
5. Output Stub Bolts
Brushes Carbon
Cover
6. Winding Insulation Resist
7. Vibration
8. Physical Condition
9. Output Voltage
10. Identification Label
11. Battery Clamp / Sol. Level/ Bracket
12. Auxiliary Power Output
13. Job Selector / Current Control Switch
III. ACCESSORIES
1. Welding Cable
2. Electrode Holder
3. Ground Clamp
4. Spark Arrester
5. Grounding System
6. Fire Extinguisher
Inspector’s Initials

ESD-4-117