You are on page 1of 11

EPC Expansion of Bulgartransgaz Pipeline – Linear Part

ARKAD CONSORTIUM

0 15/11/2 Issued for Review HD RV MS


Re 019 Prepar Checke Appro
Date Description
v ed d ved

MANPOWER SUPPLY

Scale
1/1

Size RECOMMENDATION REPORT


A4

Doc.
Project Unit/Area Discipline Progressive Sheet Rev.
Design.
180-100 0000 LOGISTICS 00001 1 / 11 0
N/A
Document property of ARKAD-ABB SpA: its reproduction, circulation and use without prior consent are forbidden
0 15/11/2 Issued for Review HD RV MS
Re 019 Prepar Checke Appro
Date Description
v ed d ved

MANPOWER SUPPLY

Scale
1/1

Size RECOMMENDATION REPORT


A4

Doc.
Project Unit/Area Discipline Progressive Sheet Rev.
Design.
180-100 0000 LOGISTICS 00001 2 / 11 0
N/A
Document property of ARKAD-ABB SpA: its reproduction, circulation and use without prior consent are forbidden
N°. 180-100-MAN-001
MANPOWER SUPPLY REV. 0
DATE: 20/11/2019
RECOMMENDATION REPORT
PAGE: 3/11

Table of Contents
1 INTRODUCTION............................................................................................................................ 3
2 SCOPE OF WORK........................................................................................................................ 4
2.1 SCOPE BREAKDOWN & RESPONSIBILITY................................................................................4
3 MOBILIZATION SCHEDULE......................................................................................................... 5
4 REQUIRED MANPOWER............................................................................................................. 5
5 SALARY COST............................................................................................................................. 6
6 COMPLETE COST........................................................................................................................ 7
7 CONSLUSION............................................................................................................................... 7
8 ATTACHMENT LIST..................................................................................................................... 7
ATTACHMENT 1 – SKILLED MANPOWER DEPLOYMENT...........................................................8
ATTACHMENT 2 – SKILLED MANPOWER COMPARISON...........................................................9
ATTACHMENT 3 – UKRANIAN AND GREEK MANPOWER COMPARISON...............................10
FOR-22-2

Document property of ARKAD-ABB SpA: its reproduction, circulation and use without prior consent are forbidden
N°. 180-100-MAN-001
MANPOWER SUPPLY REV. 0
DATE: 20/11/2019
RECOMMENDATION REPORT
PAGE: 4/11

1 INTRODUCTION
The following Recommendation Report is structured in such a manner to include
comparisons for Manpower Supply to be hired for the Parts to be executed by
Arkad, the manpower shall cover two welding spreads/crews for Part A9 and
Substage B.
Offers was received for Turkish and Romanian Labour manpower. In addition to
Ukranian and Greek staff manpower.
The offers and deployments in this document does not include Drivers, Helpers
and other Un-skilled labour as it was assumed that these are available in
Bulgaria for direct hiring.
The conclusion shall take into consideration time, cost and other obstacles to
finally ensure a smooth and planned mobilization of the manpower.
FOR-22-2

Document property of ARKAD-ABB SpA: its reproduction, circulation and use without prior consent are forbidden
N°. 180-100-MAN-001
MANPOWER SUPPLY REV. 0
DATE: 20/11/2019
RECOMMENDATION REPORT
PAGE: 5/11

2 SCOPE OF WORK
The scope of work includes supply of Skilled Labour manpower with suitable
pipeline construction experience to cover the demand required to run two
welding spreads/crews for Part A9 and Substage B. This does not include
Drivers, Helpers and other un-skilled labour that can be covered from Bulgarian
market.

2.1 SCOPE BREAKDOWN & RESPONSIBILITY


The following responsibility matrix is related to the Turkish Manpower
suppliers:
TURKISH MANPOWER SUPPLIERS
SL.
DESCRIPTION ARKAD BULGARIA SUPPLIER
NO.
1 Airticket and Visa Expenses X
2 Transportation X
3 Accommodation and Food X
4 Health Insurance X
5 Paid Holiday X
Documentation and Certificates of
6 X
Manpower
7 Issuing of Visa and Work Permit X
Table 1 - Responsibility Matrix Turkish Manpower

Following responsibility matrix reflecting the Bulgarian and Romanian


manpower suppliers:
BULGARIAN & ROMANIAN MANPOWER SUPPLIERS
SL.
DESCRIPTION ARKAD BULGARIA SUPPLIER
NO.
1 Airticket and Visa Expenses X
2 Transportation X
3 Accommodation and Food X
4 Health Insurance X
5 Paid Holiday X
Documentation and Certificates of
6 X
Manpower
7 Issuing of Work Permit X
Table 2 - Responsibility Matrix Bulgarian & Romanian Manpower

Following responsibility matrix related to Ukranian and Greek staff:

UKRANIAN AND GREEK STAFF


SL.
DESCRIPTION ARKAD BULGARIA SUPPLIER
NO.
1 Airticket and Visa Expenses X
FOR-22-2

2 Transportation X

Document property of ARKAD-ABB SpA: its reproduction, circulation and use without prior consent are forbidden
N°. 180-100-MAN-001
MANPOWER SUPPLY REV. 0
DATE: 20/11/2019
RECOMMENDATION REPORT
PAGE: 6/11

3 Accommodation and Food X


4 Health Insurance X
5 Paid Holiday X
Documentation and Certificates of
6 X
Manpower
7 Issuing of Work Permit X
Table 3 - Responsibility Matrix Ukranian & Greek Staff

3 MOBILIZATION SCHEDULE
Following anticipated schedule for mobilization of the manpower to site:
SL.
DESCRIPTION DURATION
NO.
1 Turkish Manpower 2 weeks
Partially starting from 10 days to
2 Bulgarian Manpower
one month
3 Romanian Manpower 10 Days
4 Ukranian Manpower 2 Weeks
5 Greek Manpower 1 Week
Table 4 - Mobilization Schedule

4 REQUIRED MANPOWER
Following estimated manpower to cover two welding spreads/crews for Part A9
and Substage B scope for a duration of 15 months. Refer to Attachment-1 for
detailed manpower deployment for Skilled Labour to be supplied by external
manpower supplier:
SL.
DESCRIPTION PEAK TOTAL NO.
NO.

1 Charge Hands 55

2 Welders and Spacers 67

3 Operators 96

4 Fabricator, Fitter, Carpenter, Rigger, Wrapper 68

5 Steel Fixer 10

6 Painter, Sand Blaster 9

7 E&I 19

8 Mechanics 14

9 Automatic Welding Supervisor 2

10 Pipeline and Tie-in Supervisor 2

11 Coating Formen 2
FOR-22-2

Document property of ARKAD-ABB SpA: its reproduction, circulation and use without prior consent are forbidden
N°. 180-100-MAN-001
MANPOWER SUPPLY REV. 0
DATE: 20/11/2019
RECOMMENDATION REPORT
PAGE: 7/11

12 Grinder 2

13 TOTAL 348

Table 5 – Required Skilled Manpower for Complete Arkad Scope

5 SALARY COST
Following monthly salary cost of skilled manpower for two welding
spreads/crews for Part A9 and Substage B as per the manpower deployment,
below are based on lowest Turkish manpower supplier. Refer to Attachment-2
for complete comparison:

SL. PEAK MONTHLY SALARY COST


CATEGORY
NO. MANPOWER ($)
1 December 2019 26 51,040
2 January 2020 214 510,580
3 February 2020 223 531,700
4 March 2020 296 702,640
5 April 2020 336 802,850
6 May 2020 348 837,830
7 June 2020 348 837,830
8 July 2020 348 837,830
9 August 2020 348 837,830
10 September 2020 347 834,970
11 October 2020 329 785,840
12 November 2020 309 736,340
13 December 2020 97 227,370
14 January 2021 26 51,040
15 February 2021 26 51,040
TOTAL FOR COMPLETE
16 8,636,733
DURATION
Table 6 – Complete Salary Cost
FOR-22-2

Document property of ARKAD-ABB SpA: its reproduction, circulation and use without prior consent are forbidden
N°. 180-100-MAN-001
MANPOWER SUPPLY REV. 0
DATE: 20/11/2019
RECOMMENDATION REPORT
PAGE: 8/11

6 COMPLETE COST
Following cost summary for the complete operation for mobilization and hiring
of skilled manpower as per the mobilization schedule for complete duration of
15 months. The cost is based on the mobilization schedule Attachment-1.
PRICE IN USD
SL.
DESCRIPTION (Complete
NO.
Duration)

1 Mobilization & Demobilization Cost TBP

2 Salary Cost 8,636,733

3 Accommodation and Food TBP

4 Others TBP

5 TOTAL TBP

Table 7 - Complete Cost Summary

7 CONSLUSION
It is recommended to supply the skilled manpower from Turkey as the majority
of them has just completed the work on the Turkish stream and Tanap pipeline
projects. The lowest bidder is MERC Global Group (Ali).
An option of deploying staff from Ukrania and Greece is also recommended.
Price comparison is available in Attachment-3. MERC Global is also the only,
Turkish Manpower Supplier, who has all skilled labour available as requested
by Arkad.

8 ATTACHMENT LIST
Attachment 1 – Skilled Manpower Deployment
Attachment 2 – Skilled Manpower Comparison (Turkish)
Attachment 3 – Ukranian and Greek Manpower Comparison
FOR-22-2

Document property of ARKAD-ABB SpA: its reproduction, circulation and use without prior consent are forbidden
N°. 180-100-MAN-001
MANPOWER SUPPLY REV. 0
DATE: 20/11/2019
RECOMMENDATION REPORT
PAGE: 9/11

ATTACHMENT 1 – SKILLED MANPOWER DEPLOYMENT


FOR-22-2

Document property of ARKAD-ABB SpA: its reproduction, circulation and use without prior consent are forbidden
N°. 180-100-MAN-001
MANPOWER SUPPLY REV. 0
DATE: 20/11/2019
RECOMMENDATION REPORT
PAGE: 10/11

ATTACHMENT 2 – SKILLED MANPOWER COMPARISON


FOR-22-2

Document property of ARKAD-ABB SpA: its reproduction, circulation and use without prior consent are forbidden
N°. 180-100-MAN-001
MANPOWER SUPPLY REV. 0
DATE: 20/11/2019
RECOMMENDATION REPORT