You are on page 1of 10

Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design

Ch. 0.000 To Design Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana Phase - 1 (Economic
Corridor) in the state of Madhya Pradesh on HAM Mode

Client : National Highways Authority of India


Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC : Prakash Asphaltings & Toll Highways India Limited
RMC PLANT CALIBRATION
Model no : Greaves 500 Date of Calibration 01.09.2023
Location /Ch : 18+900 LHS Due Date Of Calibration 01.12.2023
Capacity : 30 Cum / Hour Calibrated By : Jointly
AGGREGATE
DISPLAYED READING (KG)
S.No. DIFFRENCE % ERROR REMARKS
LOAD APPLIED
(KG) LOADING UNLOADING
1 0 0 0 0 0.000
2 50 50 50 0 0.000
3 100 100 100 0 0.000
4 150 150 150 0 0.000
5 200 200 200 0 0.000
6 250 250 250 0 0.000
7 300 300 300 0 0.000
8 350 350 350 0 0.000
9 400 401 400 1 0.250
10 450 450 450 0 0.000
11 500 500 500 0 0.000
12 550 550 550 0 0.000
13 600 600 602 -2 -0.333
14 650 650 650 0 0.000
15 700 700 700 0 0.000
16 750 750 751 -1 -0.133
17 800 800 801 -1 -0.125
18 850 850 850 0 0.000
19 900 900 901 -1 -0.111
20 950 950 950 0 0.000
21 1000 1001 1000 1 0.100
22 1050 1050 1050 0 0.000
23 1100 1102 1102 0 0.000
24 1150 1150 1151 -1 -0.087
25 1200 1200 1200 0 0.000
AVG.ERROR -0.018
For Contractors Representative For Concessionaire Representative For I.E. Representative
Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design
Ch. 0.000 To Design Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana Phase - 1 (Economic
Corridor) in the state of Madhya Pradesh on HAM Mode

Client : National Highways Authority of India


Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC : Prakash Asphaltings & Toll Highways India Limited
RMC PLANT CALIBRATION
Model no : Greaves 500 Date of Calibration 01.09.2023
Location /Ch : 18+900 LHS Due Date Of Calibration 01.12.2023
Capacity : 30 Cum / Hour Calibrated By : Jointly
CEMENT

LOAD APPLIED DISPLAYED READING (KG)


S.No. DIFFRENCE % ERROR REMARKS
(KG)
LOADING UNLOADING
1 0 0 0 0 0.0
2 50 50 50 0 0.0
3 100 100 100 0 0.0
4 120 120 120 0 0.0
5 140 140 140 0 0.0
6 160 160 160 0 0.0
7 180 180 180 0 0.0
8 200 200 200 0 0.0
9 220 220 220 0 0.0
10 240 240 240 0 0.0
11 260 260 260 0 0.0
AVG.ERROR 0.0
WATER
DISPLAYED READING (KG)
S.No. LOAD APPLIED DIFFRENCE % ERROR REMARKS
(KG) LOADING UNLOADING
1 0 0 0 0 0.0
2 20 20 20 0 0.0
3 40 40 40 0 0.0
4 60 60 60 0 0.0
5 80 81 81.0 0 0.0
6 100 100 100 0 0.0
7 120 121 121 0 0.0
AVG.ERROR 0.0

For Contractors Representative For Concessionaire Representative For I.E. Representative


Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design
Ch. 0.000 To Design Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana Phase - 1
(Economic Corridor) in the state of Madhya Pradesh on HAM Mode

Client : National Highways Authority of India


Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC : Prakash Asphaltings & Toll Highways India Limited
RMC PLANT CALIBRATION
Model no : Greaves 500 Date of Calibration 01.09.2023
Location /Ch : 18+900 LHS Due Date Of Calibration 01.12.2023
Capacity : 30 Cum / Hour Calibrated By : Jointly
ADMIXTURE
DISPLAYED READING (KG)
S.No. LOAD APPLIED DIFFRENCE % ERROR REMARKS
(KG) LOADING UNLOADING
1 0 0 0 0 0.0
2 2.0 2.0 2.0 0 0.0
3 3.0 3.0 3.0 0 0.0
4 3.5 3.5 3.5 0 0.0
5 4.0 4.0 4.0 0 0.0
6 4.5 4.5 4.5 0 0.0
7 5.0 5.0 5.0 0 0.0
AVG.ERROR 0.0
For Contractors Representative For Concessionaire Representative For I.E. Representative
Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design
Ch. 0.000 To Design Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana Phase - 1 (Economic
Corridor) in the state of Madhya Pradesh on HAM Mode

Client : National Highways Authority of India


Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC : Prakash Asphaltings & Toll Highways India Limited
RMC PLANT CALIBRATION
Model no : Sewing Stetter H1J161 Date of Calibration 02.08.2023
Location /Ch : 7+300 RHS Due Date Of Calibration 02.11.2023
Capacity : 60 Cum / Hour Calibrated By : Jointly
AGGREGATE
DISPLAYED READING (KG)
S.No. DIFFRENCE % ERROR REMARKS
LOAD APPLIED
(KG) LOADING UNLOADING
1 0 0 0 0 0.000
2 50 50 50 0 0.000
3 100 100 100 0 0.000
4 150 151 150 1 0.667
5 200 200 200 0 0.000
6 250 250 250 0 0.000
7 300 301 301 0 0.000
8 350 350 350 0 0.000
9 400 400 400 0 0.000
10 450 450 450 0 0.000
11 500 500 500 0 0.000
12 550 550 550 0 0.000
13 600 601 600 1 0.167
14 650 650 650 0 0.000
15 700 700 700 0 0.000
16 750 750 750 0 0.000
17 800 800 800 0 0.000
18 850 850 850 0 0.000
19 900 900 900 0 0.000
20 950 951 950 1 0.105
21 1000 1000 1000 0 0.000
22 1050 1050 1050 0 0.000
23 1100 1105 1100 5 0.455
24 1150 1150 1150 0 0.000
25 1200 1200 1200 0 0.000
AVG.ERROR 0.056
For Contractors Representative For Concessionaire Representative For I.E. Representative
Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design
Ch. 0.000 To Design Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana Phase - 1 (Economic
Corridor) in the state of Madhya Pradesh on HAM Mode

Client : National Highways Authority of India


Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC : Prakash Asphaltings & Toll Highways India Limited
RMC PLANT CALIBRATION
Model no : Sewing Stetter H1J161 Date of Calibration 02.08.2023
Location /Ch : 7+300 RHS Due Date Of Calibration 02.11.2023
Capacity : 60 Cum / Hour Calibrated By : Jointly
CEMENT

LOAD APPLIED DISPLAYED READING (KG)


S.No. DIFFRENCE % ERROR REMARKS
(KG)
LOADING UNLOADING
1 0 0 0 0 0.0
2 50 50 50 0 0.0
3 100 100 100 0 0.0
4 120 120 120 0 0.0
5 140 140 140 0 0.0
6 160 161 160 1 0.6
7 180 180 180 0 0.0
8 200 200 200 0 0.0
9 220 220 220 0 0.0
10 240 241 240 1 0.4
11 260 260 260 0 0.0
AVG.ERROR 0.1
WATER
DISPLAYED READING (KG)
S.No. LOAD APPLIED DIFFRENCE % ERROR REMARKS
(KG) LOADING UNLOADING
1 0 0 0 0 0.0
2 20 20 20 0 0.0
3 40 40 40 0 0.0
4 60 60 60 0 0.0
5 80 81 81 0 0.0
6 100 100 100 0 0.0
7 120 120 120 0 0.0
AVG.ERROR 0.0

For Contractors Representative For Concessionaire Representative For I.E. Representative


Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design
Ch. 0.000 To Design Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana Phase - 1
(Economic Corridor) in the state of Madhya Pradesh on HAM Mode

Client : National Highways Authority of India


Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC : Prakash Asphaltings & Toll Highways India Limited
RMC PLANT CALIBRATION
Model no : Sewing Stetter H1J161 Date of Calibration 02.08.2023
Location /Ch : 7+300 RHS Due Date Of Calibration 02.11.2023
Capacity : 60 Cum / Hour Calibrated By : Jointly
ADMIXTURE
DISPLAYED READING (KG)
S.No. LOAD APPLIED DIFFRENCE % ERROR REMARKS
(KG) LOADING UNLOADING
1 0 0 0 0 0.0
2 2.0 2.0 2.0 0 0.0
3 3.0 3.0 3.0 0 0.0
4 3.5 3.5 3.5 0 0.0
5 4.0 4.0 4.0 0 0.0
6 4.5 4.5 4.5 0 0.0
7 5.0 5.0 5.0 0 0.0
AVG.ERROR 0.0
For Contractors Representative For Concessionaire Representative For I.E. Representative