Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design Ch. 0.

000 To Design
Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana Phase - 1 (Economic Corridor) in the state of Madhya
Pradesh on HAM Mode
Client : National Highway Authority of India
Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC Contractor : Prakash Asphaltings & Toll Highways India Limited

Calibration Of WMM Plant (Kadola)


Date of Calibration 12.07.2023 Due Date :- 11.01.2024
Make : Material per m. length : 42.2/1.315= 32.09 kg.
No. of Feeders: 4 (Four) Length of gathering belt 26.3 M.
Speed of gathering belt : 1.315 m/sec. (1 st to 4th Feeder )
Rated Capacity of the Plant : 200TPH. Required discharge of the beltb : 42.2KG/sec.
Present Plant Capacity : 152 TPH

Constituent Weight : 40mm (35%)= 11.23 Kg., 20 mm (20%) = 6.418 Kg. ,10mm (12%) = 3.85 Kg., Dust (33%) = 10.58 Kg. , Water
(6.05%) = 9.196 Kg.

Feeder No.1
14000
40mm 40 mm
Feed Weight 12000
Rate in gm
30 7000 10000
35 8500
40 10300 8000
45 11800
6000
50 13000
4000

2000

0
25 30 35 40 45 50 55

Feed Rate Per Minute

Feeder No.2
20 mm 20 mm
Feed Weight 7000
Rate in gm
12 3500 6000
14 4500
16 5500 5000

18.2 6418
4000
20 7000
3000

2000

1000

0
11 12 13 14 15 16 17 18 19 20 21

Feed Rate Per Minute

For Contractors Rep. For ConcessionaireRep. For Independent Engineer Rep.


Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design Ch. 0.000 To Design
Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana Phase - 1 (Economic Corridor) in the state of Madhya
Pradesh on HAM Mode
Client : National Highway Authority of India
Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC Contractor : Prakash Asphaltings & Toll Highways India Limited

Calibration Of WMM Plant (Kadola)


Date of Calibration 12.07.2023 Due Date :- 11.01.2024
Make : Material per m. length : 42.2/1.315= 32.09 kg.
No. of Feeders: 4 (Four) Length of gathering belt 26.3 M.
Speed of gathering belt : 1.315 m/sec. (1 st to 4th Feeder )
Rated Capacity of the Plant : 200TPH. Required discharge of the beltb : 42.2KG/sec.
Present Plant Capacity : 152 TPH

Constituent Weight : 40mm (35%)= 11.23 Kg., 20 mm (20%) = 6.418 Kg. ,10mm (12%) = 3.85 Kg., Dust (33%) = 10.58 Kg. , Water
(6.05%) = 9.196 Kg.

Feeder No.3
10 mm
Feed Weight 5000
10mm
Rate in gm
4500
6 1900
4000
12 2500
18 3200 3500
24 3800 3000
30 4600
2500

2000

1500

1000

500

0
0 5 10 15 20 25 30 35

Feed Rate Per Minute

Feeder No.4
Stone Dust Stone Dust
Feed Weight 14000
Rate in gm
15 4500 12000
20 6500
10000
25 8500
30 10700 8000
35 12000
6000

4000

2000

0
10 15 20 25 30 35 40

Feed Rate Per Minute

For Contractors Rep. For ConcessionaireRep. For Independent Engineer Rep.


Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design Ch. 0.000 To Design
Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana Phase - 1 (Economic Corridor) in the state of Madhya
Pradesh on HAM Mode
Client : National Highway Authority of India
Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC Contractor : Prakash Asphaltings & Toll Highways India Limited

Calibration Of WMM Plant (Kadola)


Date of Calibration 12.07.2023 Due Date :- 11.01.2024
Make : Material per m. length : 42.2/1.315= 32.09 kg.
No. of Feeders: 4 (Four) Length of gathering belt 26.3 M.
Speed of gathering belt : 1.315 m/sec. (1 st to 4th Feeder )
Rated Capacity of the Plant : 200TPH. Required discharge of the beltb : 42.2KG/sec.
Present Plant Capacity : 152 TPH

Constituent Weight : 40mm (35%)= 11.23 Kg., 20 mm (20%) = 6.418 Kg. ,10mm (12%) = 3.85 Kg., Dust (33%) = 10.58 Kg. , Water
(6.05%) = 9.196 Kg.

Water

Feed Weight 12000 Water


Rate in gm
11000
4 6000 10000
6 7000 9000
8000
8 8000
7000
10 9196 6000
12 10500 5000
4000
3000
2000
1000
0
3 4 5 6 7 8 9 10 11 12 13
Feed Rate Per Minute

For Contractors Rep. For ConcessionaireRep. For Independent Engineer Rep.


Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design Ch. 0.000 To Design
Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana Phase - 1 (Economic Corridor) in the state of Madhya
Pradesh on HAM Mode
Client : National Highway Authority of India
Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC Contractor : Prakash Asphaltings & Toll Highways India Limited

Calibration Of WMM Plant (Kadola)


Date of Calibration 12.07.2023 Due Date :- 11.01.2024
Make : Material per m. length : 42.2/1.315= 32.09 kg.
No. of Feeders: 4 (Four) Length of gathering belt 26.3 M.
Speed of gathering belt : 1.315 m/sec. (1 st to 4th Feeder )
Rated Capacity of the Plant : 200TPH. Required discharge of the beltb : 42.2KG/sec.
Present Plant Capacity : 152 TPH

Constituent Weight : 40mm (35%)= 11.23 Kg., 20 mm (20%) = 6.418 Kg. ,10mm (12%) = 3.85 Kg., Dust (33%) = 10.58 Kg. , Water
(6.05%) = 9.196 Kg.

Required
Design Aggregate Feed Rate Per
Type of Material Material Weight
Blending (%) Minute
in (gm)

40mm 35 11230 43.9

20mm 20 6418 18.2

10mm 12 3850 24.4

Stone Dust 33 10580 29.6

Water 6.05 9196 10

For Contractors Rep. For ConcessionaireRep. For Independent Engineer Rep.


Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design Ch. 0.000 To Design
Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana Phase - 1 (Economic Corridor) in the state of Madhya
Pradesh on HAM Mode
Client : National Highway Authority of India
Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC Contractor : Prakash Asphaltings & Toll Highways India Limited

Calibration Of CTSB Plant (Kadola)


Date of Calibration 12.07.2023 Due Date :- 11.01.2024
Make : Material per m. length : 41.69/1.315= 31.70 kg.
No. of Feeders: 4 (Four) Length of gathering belt 26.3 M.
Speed of gathering belt : 1.315 m/sec. (1 st to 4th Feeder )
Rated Capacity of the Plant : 200TPH. Required discharge of the beltb : 41.69KG/sec.
Present Plant Capacity : 150 TPH

Constituent Weight : 40mm (42%)= 13.314 Kg., 20 mm (10%) = 3.17 Kg. ,10mm (28%) = 8.876 Kg., Dust (20%) = 6.34 Kg. , Cement :
(2.75%) = 0.871 ,Water (5.70%) = 1.807 Kg.

Feeder No.1
16000
40mm 40 mm
Feed Weight 14000
Rate in gm
12000
10 5600
20 8550 10000
30 11200
40 13300 8000

50 14300 6000

4000

2000

0
5 10 15 20 25 30 35 40 45 50 55

Feed Rate Per Minute

Feeder No.2
20 mm 20 mm
Feed Weight 7000
Rate in gm
5 350 6000
10 1600
15 2750 5000

20 3150
4000
25 3950
3000

2000

1000

0
0 5 10 15 20 25 30

Feed Rate Per Minute

For Contractors Rep. For ConcessionaireRep. For Independent Engineer Rep.


Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design Ch. 0.000 To Design
Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana Phase - 1 (Economic Corridor) in the state of Madhya
Pradesh on HAM Mode
Client : National Highway Authority of India
Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC Contractor : Prakash Asphaltings & Toll Highways India Limited

Calibration Of CTSB Plant (Kadola)


Date of Calibration 12.07.2023 Due Date :- 11.01.2024
Make : Material per m. length : 41.69/1.315= 31.70 kg.
No. of Feeders: 4 (Four) Length of gathering belt 26.3 M.
Speed of gathering belt : 1.315 m/sec. (1 st to 4th Feeder )
Rated Capacity of the Plant : 200TPH. Required discharge of the beltb : 41.69KG/sec.
Present Plant Capacity : 150 TPH

Constituent Weight : 40mm (42%)= 13.314 Kg., 20 mm (10%) = 3.17 Kg. ,10mm (28%) = 8.876 Kg., Dust (20%) = 6.34 Kg. , Cement :
(2.75%) = 0.871 ,Water (5.70%) = 1.807 Kg.

Feeder No.3
10 mm
Feed Weight 12000
10mm
Rate in gm
6 1350 10000
12 4640
18 6650
8000
24 8900
30 9950
6000

4000

2000

0
0 5 10 15 20 25 30 35

Feed Rate Per Minute

Feeder No.4
Stone Dust Stone Dust
Feed Weight 14000
Rate in gm
12000
7 1260
14 6430 10000
21 8400
8000
28 10900
35 12100 6000

4000

2000

0
5 10 15 20 25 30 35 40
Feed Rate Per Minute

For Contractors Rep. For ConcessionaireRep. For Independent Engineer Rep.


Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design Ch. 0.000 To Design
Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana Phase - 1 (Economic Corridor) in the state of Madhya
Pradesh on HAM Mode
Client : National Highway Authority of India
Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC Contractor : Prakash Asphaltings & Toll Highways India Limited

Calibration Of CTSB Plant (Kadola)


Date of Calibration 12.07.2023 Due Date :- 11.01.2024
Make : Material per m. length : 41.69/1.315= 31.70 kg.
No. of Feeders: 4 (Four) Length of gathering belt 26.3 M.
Speed of gathering belt : 1.315 m/sec. (1 st to 4th Feeder )
Rated Capacity of the Plant : 200TPH. Required discharge of the beltb : 41.69KG/sec.
Present Plant Capacity : 150 TPH

Constituent Weight : 40mm (42%)= 13.314 Kg., 20 mm (10%) = 3.17 Kg. ,10mm (28%) = 8.876 Kg., Dust (20%) = 6.34 Kg. , Cement :
(2.75%) = 0.871 ,Water (5.70%) = 1.807 Kg.

Feeder No.5
1200
Cement
Feed Weight 1000
Rate in gm
3 510 800
6 690
600
9 815
12 935 400
15 1040
200

0
2 4 6 8 10 12 14 16

Water

Feed Weight 12000 Water


Rate in gm 11000
10000
3 6050 9000
6 7300 8000
7000
9 8450 6000
5000
12 8950
4000
15 10150 3000
2000
1000
0
2 4 6 8 10 12 14 16
Feed Rate Per Minute

Required
Design Aggregate Feed Rate Per
Type of Material Material Weight
Blending (%) Minute
in (gm)
40mm 40 13314 40.1

20mm 10 3170 21

10mm 28 8876 25

Stone Dust 20 6340 26


Cement 2.75 871 11.2
Water 5.7 1807 8

For Contractors Rep. For ConcessionaireRep. For Independent Engineer Rep.