HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Name of Job : Department : Prepared By : Checked By :- Approved By :


LIFTING WORK CONSTRUCTION

HAZARD IDENTIFICATION RISK ASSESSMENT Recommended


Action/Additional
Job Activity Hazard Hazard Character Current Risk Control Probability Severity Risk Control

Minor damage (No or less Provide experience driver with


Additional control shall be
Traffic collision. disruption, repair cost > legal driving licence; Provide 2 2 4 proposed when necessary
RM1,000 and < RM10,000) trafficman.

Briefing By SHO on safety


Minor damage (No or less
Regular maintenance and awareness. Additional
Machinery breakdown. disruption, repair cost > 3 2 6 control shall be made if
RM1,000 and < RM10,000) servicing.
Transporting of necessary.
lifting To securely tighten up
machinery Equipment/machinery Minor damage (No or less
equipment/machinery before Additional control shall be
falling onto public disruption, repair cost > 2 2 4 proposed when necessary
vehicle/road. RM1,000 and < RM10,000) transporting; Provide warning
signage.
Body injuries while
First aid cases/medical Provide safe working procedure;
handling or secure Additional control shall be
treatment (M.C between 1 Training on machinery handling; 2 2 4 proposed when necessary
equipment/ machinery for to 3 days), Close supervision.
transporting.
Physical injuries caused by Fatality or permanent Worker wear gloves and hard Briefing By SHO on safety
awareness. Additional
fall/hit by moving object disability or irreversible hat; Signalman monitored lifting 2 5 10 control shall be made if
during lifting process. illness process; Close supervision. necessary.

Crane cable slipped or Fatality or permanent Provide a proper PMA certificate; Briefing By SHO on safety
awareness. Additional
break during the lifting disability or irreversible Signalman monitored lifting 2 5 10 control shall be made if
Mobilization/ process. illness process; Close supervision. necessary.
unloading
Minor damage (No or Briefing By SHO on safety
machinery/
Damage to road surface less disruption, repair Proper use of outrigger pad; Use awareness. Additional
material 3 2 6 control shall be made if
due to crane sitting. cost > RM1,000 and < of support platform.
RM10,000) necessary.

Provide safe working procedure; Briefing By SHO on safety


Struck by moving object Fatality or permanent
Signalman monitored lifting awareness. Additional
due to unstable ground or disability or irreversible 2 5 10 control shall be made if
process; Provide barrier and
mishandling. illness necessary.
signage, Closed supervision.
Page 25/29
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Name of Job : Department : Prepared By : Checked By :- Approved By :


LIFTING WORK (Cont'd) CONSTRUCTION

HAZARD IDENTIFICATION RISK ASSESSMENT Recommended


Action/Additional
Job Activity Hazard
Heat stroke from prolonged Hazard Character Current
Workers wear Risk
hard Control
hat; Workers Probability Severity Risk
Near miss/ unsafe act/ Allowed to to
carry AdditionalControl
control shall be
exposure to sunlight and unsafe condition encourage takeonly where
a short one's
break 3 1 3 proposed when necessary
Sudden body injuries due Near miss/ unsafe act/
dehydration. can; Required
where applicable.assistant when Additional
Briefing Bycontrol
SHO on shall be
safety
Working Physical injuries caused by unsafe condition 3 1 3 proposed when necessary
to excessive lifting. Minor injury/illness (M.C needed; Use crane
Safe working or lifting
procedure; Closed awareness. Additional
environment trip and fall during lifting machinery. 2 3 6
between
Near 5 to
miss/ 14 days)
unsafe act/ supervision.
Training aand proper planning of control shall
Additional be made ifbe
and
Space
Crane carrying
boom material.
constraint. Fatality or permanent
Provide proper PMA certificate; 3 1 3 Briefing Bycontrol
SHO on shall
safety
unsafe condition work; Safe monitored
working procedure. necessary.
proposed when necessary
Signalman lifting awareness. Additional
Briefing By SHO on safety
failure/collapse
Crane topple due due
to to disability
Fatality ororpermanent
irreversible Crane park at solid platform and 2 5 10 control shall Additional
be made if
Working with process; Close supervision; awareness.
overloading.
overweight/unstable illness
disability
First or irreversible
aid cases/medical outrigger support is signage.
fully used; 2 5 10 necessary.
lifting/hoisting Minor Provide
Trainingbarrier and
and regular toolbox talk; control shall
Additional be made
control ifbe
shall
ground.
Manual handling.
Material damage due to illnessdamage
treatment (No or 1
(M.C between Close supervision. 2 2 4 Briefing By SHO on
necessary.
safety
machinery. less
to 3 disruption, repair
days), Closed
Providesupervision.
safe handling procedure; proposed when
awareness. necessary
Additional
falling/mishandling during 2 3 6 control shall be made if
cost > RM1,000 and < Provide specific storage room.
storage. necessary.
RM10,000)